2015, 05-27 Permit: SW-15000492 Sewer SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-15000492 Permit Issued Date: 05/27/2015
Expiration Date: 05/27/2016
Project Description: SEWER
Project Name: MISSION
Primary Contact: LAUER EXCAVATION&CONST Applicant: LAUER EXCAVATION&CONST
Phone: 509-981-7954 Address: PO BOX 11581
SPOKANE VALLEY,WA 99211
Phone: 509-981-7954
Email:
SITE INFORMATION:
Site Address: 1831 N WOODRUFF RD Owner: BELL, DANA M
Parcel Number: 45083.0407 Address: 12023 REINER RD
MONROE,WA 98272-9595
Phone:
Assessor's Description: OPPORTUNITY ADD E123FT OF PTN OF TR Email:
298 LYG S OF PSH 2 HWY 1-90&N OF E123FT OF
LT 1 BLK 1 WOODLO HIS
Inspection Area: :(509)-477-3675
Water District:Modern Electric Water Fire District:Spokane Valley Fire
Company
Zoning: Land Area: 18445 Square Feet
CONTRACTOR INFORMATION:
LAUEREC931DA, Exp.03/01/2017
LAUER EXCAVATION&CONST
PO BOX 11581 SPOKANE VALLEY,WA 99211
509-981-7954
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing-Utilities $27.12
Utilities Permit $125.00
Total Fee: $152.12
CONDITIONS:
GTN
Parcel within 100 feet of pipeline(s)owned by the following:(GTN)
SVRP Aquifer Boundary:Water Purveyor ability to serve statement required. If unable to serve,?mitigation certificate?(use of private well)
from DOE prior to permit issuance. _
Public Transit Benefit Area
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire
Date Printed:05/27/2015 08:25:53 Project Coordinator:Susan Clark
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-15000492 Permit Issued Date: 05/27/2015
Expiration Date: 05/27/2016
CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE(1)YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed:05/27/2015 08:25:53 Project Coordinator:Susan Clark