Loading...
2015, 04-17 Permit: BLD-2014-2610 Res. Enery Compliance Cert. Property Address: 6Cel ' Se\l(.: (-AL /S c_G �U ��•.e \ktley j. Conditioned Floor Area: 1C-j0,0 Date: L 1 1-1/ 1,5 Builder or registered design professional: jL.y i ,z �w(.\\n5'c CO,-.-1-z) (Z(A) 96--1--5c:s3:t Signature: r:-. C7-.ViR-1 alues C Ceiling: Vaulted R- 7Floors: Over unconditioned space R- Is Attic R- V? Slab on grade floor R- LR-„2/Walls: Above grade R- � Doors: R- ri Below,int. R- ld R- Below.ext. R- /d R- C L L1-Factors and SHGC Ct NFRC rating(or) Windows C-i30 SHGC- N/A Default rating 0 aptx,,d1‘A W SI t'2012 Skylights C- SHGC- N/A C Table 406.2 Option(s) Total 406.2 Credits . Heating,Cooling&Domestic Hot Water . System Type Efficiency Heating S- Cooling (j.-"S DHW es i Duct&Building Air Leakage C est All ducts& HVAC in conditioned space ( yes0 Insulation R- l( Air handler present I yes no) Test Target CFMia25Pa Test Result CFM(u25Pa Building air leakage target:ACHst;<: 5.0-Tested leakage:ACI15(,= LI,CJ Onsite Renewable Energy Electric Power System System type: Rated annual generation Kwh W SHINGTUN S'I",\TE UNIVLRSITY EX1Ff' it N EN,'3C,v 1,1201,1<,V.I ii p P (i f t Duct Leakage Affidavit (New Construction) Permit#: House address or lot number: ll;( ) <")' `� City: --fjY \1 Zip: Cond. Floor Area (ft2): Source (circle one): (Plans , Estimated Measured ❑ Duct tightness testing is not required. The total leakage test is not required for ducts and air handlers located entirely within the building thermal envelope. Ducts located in crawl spaces do not qualify for this exception. Air Handler in conditioned space? ❑ yesno Air Handler present during testes ❑ no Circle Test Method: (-Leakage to Outs Total Leakage Maximum duct leakage: Post Construction,total duct leakage: (floor area x .04) = CFM@25 Pa Post Construction, leakage to outdoors: (floor area x .04)= CFM@25 Pa Rough-In,total duct leakage with air handler installed: (floor area x .04) = j CFM@25 Pa Rough-In,total duct leakage with air handler not installed: (floor area x .03) = CFM@25 Pa Test Result: L\ CFM@25Pa Ring (circle one if applicable): Lam, Open 1 2 3 Duct Tester Location: V \N..( E Pressure Tap Location: � k I certify that these duct leakage rates are accurate and determined using standard duct testing protocol. Company Name: L L Technician: )�\� \ cs\CY.) / it Technician Signature: C L C :.�jr Date: \/ Phone Number: