Loading...
2012, 01-13 Permit App: 12000099 Pole Bldg Project Number: 12000099 Inv: 1 Application Date: 1/13/2012 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: 30 X 40 POLE BLDG FOR STORAGE Contact: TOWN&COUNTRY Address: 5918 E TRENT AVE C-S-Z: SPOKANE VALLEY,WA 99212 Setbacks:Front Left: Right: Rear: Phone: (509)535-9016 Group Name: Site Information: Project Name: lam s.. — 0111111 6, ...t ;M71NIMItgPMi�.,,:,iF :Nr`W4 Plat Key: 004124 Name: PONDEROSA 04TH ADD REPLAT B1 L2,3,10,11 (FEES) District: Sout Parcel Number: 45324.2202 Block: Lot: SiteAddress: 3919 S WOODRUFF CT Owner:Name: FITCHNER,MIKE&ANGIE Address: 3919 S WOODRUFF CRT Location::CSV SPOKANE,WA 99206-9531 Zoning: R-2 SF Res Suburban District Water District: 101 SPO CO WATER DIST#3B Hold: ❑ Area: 28,864 Sq Ft Width: 56 Depth: 205 Right Of Way(ft): 50 Nbr of Bldgs: 0 Nbr of Dwellings: 1 Review Information: — 4 -- mx7, w rmra o, _ _ n e _ ti Review Building Plan Review Released By: Originally Released: 1/13/2012 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Originally Released: 1/13/2012 By: mpalaniuk Driveway/Approach Released By: Originally Released: 1/13/2012 By: TMELBOU Permits: ra „:'"`.�11nii0ip� °�� v rwr4 pnnnfl0101i::J s .,,,,�:;. nn 14Iilillli u , .+ f`,".�,x� 'z�, a7 tu `. nJll CI n m'k Operator: JD Printed By: JD Print Date: 1/13/2012 Project Number: 12000099 Inv: 1 Date: 1/13/2012 Page 2 of 2 � Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: TOWN&COUNTRY BLDG Firm: TOWN&COUNTRY BLDG CONT Address: 3908 W DAKIN LN Phone: (509)448-8483 CHENEY,WA 99004 This Application: Total Project: Description Grp Tyne Notes Sq Ft Valuation Sq Ft Valuation POLE BDLG U-1 VB 1,200 $22,800.00 1,200 $22,800.00 Totals: 1,200 $22,800.00 1,200 $22,800.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $363.25 ACCESSORY PLANS REVIEW 1 SELECT $90.81 WSBCC SURCHARGE 1 SELECT $4.50 Permit Total Fees: $458.56 Notes: surimem101„WIP _ 4-.,,;a ,I,11,1(1,11111p111,1Ar 1r1,1111111111111n1x a� ar n Payment Summary Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $458.56 $458.56 $90.81 $367.75 $458.56 $458.56 $90.81 $367.75 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 1/13/2012 Permit Center $oliane 11707 E Sprague Ave,Suite 106 P:ERIvIIT 1 3ER Spokane Valley,WA 99206 PERMITrLE.: jV allipv` (509)688-0036 FAX:(609)688-0037 www.spoklulevallev.org Community Development Residential Construction ti ew Construction 11 Accessory BIdg Permit Application []Addition/Remodel n Deck ❑ Other: S11ts ADDRESS: -/ 5 0,--e e .+' _, :...' V 2 4,, ASSESSORS PARCEL NO: '$J?4• o O2- " LEGAL DESCRIPTION: Building Owner i k 4 I •' Contractor Name: u if" et ✓ Name -161641 . CDU.!lT�e 8t�/L a gs Z�lC, Address: J g /1 Si , r 6'111— ess Sl ie 6:;1*-- f15T TRf�T gIQE State _Ci 1 State:_te t 4: 5.'204 . li � /- fg24, 1 283r? Phone: 5o,- yo- �/ F� -- .. € -� sa n wriie No• Etp. _ ivuc iz3c� 06 3o PZ Contact Person Crty,Busmess Ltc-No:. - l 057:495 Name: 641E pie'E ' Phone: CD? 535 91)/b ExT Zy Describe the scope-of work in:iletP11, Cost of Project:.- /a - 2>"f, oW Proposed Use• $i (ar ,, - **************The follower MUST be com i Iete: write Nl ;not a j - .bl- "********************** HEIGHT TOT�� if DIMENS:I0r1S: , 1 if #OF STORIES: TOTAL HABI ABLE SPACE _{AIN FLOOR TO SQ. 2'1':FLOOR_SQ. FTG: JNFIN-BASEME-NT SQ. FTG: -IMP-ERVIOUS SURFACE FTG: 47.00 c3 (L AREA # FINISHED BASEMENT GARAGE SQ. FTG: DECK/COV. PATIO SQ. FTG: 3O%SLO ES ON SQ. FTG: friltit-- ;40 .4 14-- . PROPERTY: "4— # —#OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC? 4 o sr FR/EM 4 ✓?/04t1 >EWE The p-ermiYee verifies,acknowTedges ani-agrees by ffierrslgnWure $rat t) ff IiIS permit is for construction of or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of itus City of Spokane Valley Permit bure to the property owner._3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in Ul compliance with the City of Spokane Valle`°s-velopmen de. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This C'• • pokane y.Permit is riot a permit or approval-for-any-violation of federal,state or local taws,codes or ordinances.6) P1-�,,or" dition ' rmation may be required to be submitted, and subsequently approved before this application can be pied ____--.`7 .. / —._ DATE: /— 7 3— /E SIGNATURE-- Method of Payment: ❑ Cash teei Check 0 Mastercard 0 VISA Bankcard#: Expires: Authorized Signature: -,,11.-„, ... - ;tib REVISED ti4sro-/ - 1\ _ 1 Proj ect Newproje,��, Previous pre-app meeting 0 po.kaosioN,ne SCI Transmittal Plan revisions [=, City of Spokane Valley Transmittal Date: .0001/4alley Community Development Friday,January 13,2012 Department 11703 E.Sprague Ave,Suite B3 Spokane Valley,WA 99206 Phone:509.688.0036 Site Address: 3919 S WOODRUFF CT Project Number: 12000099 Parcel Number: 45324.2202 Zoning: R-2 Water District: SPO CO WATER DIST#3B Fire District: FD 01 Applicant: TOWN & COUNTRY Owner: FITCHNER, MIKE &ANGIE 5918 E TRENT AVE 3919 S WOODRUFF CRT SPOKANE VALLEY. WA 99212 SPOKANE, WA 99206-9531 (509) 535-9016 e-mail: e-mail: Contact: TOWN & COUNTRY Occupant: 5918 E TRENT AVE SPOKANE VALLEY. WA 99212 e-mail: (509) 535-9016 e-mail: Contractor: TOWN & COUNTRY BLDG CONTR Arch/Engineer: 3908 W DAKIN LN CHENEY, WA 99004 (509) 448-8483 e-mail: Project 30 X 40 POLE BLDG FOR STORAGE Description: Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATION \SITE PLAN PLANS ^ LIQ Please send all plan review and project comments via e-mail to the highlighted individuals. 3,51T s, Alvegt,d114 /7 A e. (4"" 1673.2 22O i . 1 • \, , )OL (),c-,;50,Art DEPT..APPRO ED - �.„...-4„moi,. e\-' DATE: / /3/2o/ i 1 7o a '2 co , ' - /yo t11 r / , ts:o4;,''' -l'4* A , 105 5.i b- • i Lot= 25(361 Target Date sheet For City Use Only � PLUS Project )2(.;�C)�_)L-�� � Sn Ukase Project Address LO Valley® v 11703 E Sprague Ave Suite B-3♦ Spokane Valley WA 99206 509.720-5240♦ Fax: 509.688.0037♦ permitcenter®spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application,we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date,we will contact you with a revised target date. 1 , Your application review TARGET DATE is '� 1 The TARGET DATE is the date we estimate your project application will have had its initial technical review.It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review D Submit complete,accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. D Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. D Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date.Staff may contact you before the target date if the initial review is complete.By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2.Quality Check.The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete,your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3.Technical Compliance.Once an application is administratively complete,it is routed to technical staff for compliance review. Depending on the type of project,technical staff may include multiple reviewers.You should be contacted by phone,fax,email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals,each reviewer will approve their section of the application and route it to the Permit Center.When all sections of the application are received,a Permit Specialist will process the application and contact the person specified on your application for permit pick-up.Information regarding fees and pre-construction meetings(if required)will be provided by the Permit Specialist at that time. CD-003 V-7/06-21-11 Page 1 of 1