2010, 04-22 Permit App: 10001067 Pole BldgProject Number. 10001067
Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 4/22/2010 Page 1 of 2
Project Information:
Permit Use: 30 X 54 POLE BLDG Contact: QUALITY STEEL BLDGS
Address: 7810 N MARKET ST
C - S - Z: SPOKANE, WA. 99217
Setbacks: Front Left: Right: Rear: Phone: (509) 468-1606
Group Name:
Site Information: Project Name:
Plat Key: CONV Name: CONVERTED CNTY DATA District: Sout
Parcel Number: 45324.2102
Block: Lot:
SiteAddress: 4026 S WOODRUFF RD
Location:: CSV
Owner: Name: YOUNG, MIKE Si RACHEL
Address: 11207 E 37TH AVE
SPOKANE VALLEY, WA 99206
Zoning: R-2 SF Res Suburban District
Water District: 100 SPO CO WATER DIST#3A Hold: ❑
Area: 16,350 Sq Ft Width: 109 Depth: 150 Right Of Way (ft): 0
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Review Information: trnuagesmastwr
Review
Building Plan Review
Released By:
Originally Released: 4/22/2010 By: tmelbourn
Landuse/Zoning/HE Conditions
Released By:
The detached structure is at the maximum size limit of 10% of lot size.
Originally Released: 4/22/2010 By: kkendall
Permits:
Operator: JD Printed By: jmm
Print Date: 4/22/2010
Project Number: 10001067
Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 4/22/2010
Contractor. QUALITY ROOFING LLC
Address: PO BOX 573
SPOKANE VALLEY WA 99037
Description Grp Type Notes
GAR WOOD U-1 VB
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBCC SURCHARGE
Building Permit
Page 2 of 2
Firm: QUALITY ROOFING LLC
Phone: (509) 862-6339
This Application:
Sq Ft Valuation
1,620 $35,640.00
Totals: 1,620 $35,640.00
Units Unit Desc
1
1
1
SELECT
SELECT
SELECT
Permit Total Fees:
Total Project:
So Ft Valuation
1,620 $35,640.00
1,620 $35,640.00
Fee Amount
$502.35
$125.59
$4.50
$632.44
Notes:
Payment Summary:
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $632.44 $632A4 $125.59 $506.85
$632.44 $632.44 $125.59 $506.85
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm Print Date: 4/22/2010
RECEIVED 04/19/2010 13:32 5096880037
04/19/2010 01:32 FAX 5094683720 QUALITY STEEL BUILDINGS 110001
SV PERMIT CENTERFR
Permit Center
"' `* ne 11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
.000Vdlleey (509)688-0036 FAX: (509)688-0037
Community Development
www. spokanevallev. org
Residential Construction
Permit Application
SITE ADDRESS: 4026 S WOODRUFF RD
PERMIT NUMBER: / r7/O4.7
PERMIT FEE:
xx New Construction XX Accessory Bldg
Addition/Remodel n Deck n Other:
ASSESSORS PARCEL NO: 45324.2102
LEGAL DESCRIPTION PONDEROSA STH ADD L2 B1
Building Owner:
DIMENSIONS:
30X 54
—
# OF STORIES:
1
Name: YOUNG, MIKE & RACHEL
MAIN FLOOR TO SQ.
FTG:
N/A
2"" FLOOR SQ. FTG:
N/A
Address 4026 S WOODRUFF RD
IMPERVIOUS SURFACE
AREA: NONE
FINISHED BASEMENT
SQ. FTG: N/A
City: SPOKANE VALLEY
State: WA
Zip: 99206
Phone. 509-475-6279
Fax:
HEAT SOURCE: NONE
:Contact:Person
Name: NATHAN ROBINSON
Phone: 509-468-1606
Describe the scope of work in detail:
30X 54 X 14
Contractor:
DIMENSIONS:
30X 54
—
# OF STORIES:
1
Name: Quality Steel Buildings,
Inc.
MAIN FLOOR TO SQ.
FTG:
N/A
2"" FLOOR SQ. FTG:
N/A
Address: 361 SANDY
SHORES RD
IMPERVIOUS SURFACE
AREA: NONE
FINISHED BASEMENT
SQ. FTG: N/A
City: NEWPORT
State: WA
Zip: 99156
Phone: 509-468-1606
Fax:
HEAT SOURCE: NONE
Contractor Lic No:
QUALIBO81 C7
Exp Date: 2/11
City Business Lic. No:
601370591 1 I
Cost of Project: $ /7arj f
Proposed Use:
SHOP
**************The following MUST be coete: (write N/A if not applicable)**********************
mpl
HEIGHT TO PEAK:
19
DIMENSIONS:
30X 54
—
# OF STORIES:
1
TOTAL HABITABLE SPACE:
NONE
MAIN FLOOR TO SQ.
FTG:
N/A
2"" FLOOR SQ. FTG:
N/A
UNFIN BASEMENT SQ. FTG:
N/A
IMPERVIOUS SURFACE
AREA: NONE
FINISHED BASEMENT
SQ. FTG: N/A
GARAGE SQ. G:
1620 0 t
DECK/COV. PATIO SQ. FTG:
N/A
30% SLOPES ON
PROPERTY: NO
# OF BEDROOMS:
N/A
CONST TION TYPE:
HEAT SOURCE: NONE
SEWER
POLE
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Play or addition- ormation may be required to be submitted, and su. equently approved before
this application can be processes /�
SIGNATURE: DATE:
Method of Payment:
❑ Cash
Bankcard #.
Authorized Signature:
❑ Check
❑ Mastercard
Expires:
XX VISA
VIN#:
Effective 10-28-07
Page 1 of 1
C:\Documents and Settingslmbrown.QSBINC1My Documents\permits\Residential Building Permi
Spokane
jUalley°
For City Use Only
PLUS Project Number k 0 b1
Project Address
Project
c , 1 O(• r7;
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 • Fax: 509.688.0037 ♦ permitcenter@spokanevatley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your projeci't :pplic.ton will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
> Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the.
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date'if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for . deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE
REV 9/07
LrS51 Ze-
1 35o
Ji. n a Poo C1
PLANNING
BY:
DATE:
Quality
STEEL BUILDINGS, INC.
N. 7810 Market Center Suite
Spokane, Wa. 99207
LIC# QUALISBO81C7
SITE PLAN
SHOW
NORTH
PT. APPROVED
(509) 468-1606 office
(509) 468-3720 fax
tOoofru.--c�
/09
n
10' FROM SEPTIC/DRAINFIELD
SHOW STREETS/ALLEYS
SHOW SEPTIC/SEWER/DRAINFIELD
SHOW EXISTING BUILDINGS
SHOW SETBACKS-FRONT,REAR,SIDE
SHOW LOT SIZE
SIDE YARD & REAR YARD SET BACKS.
5' TO PROPERTY LINE UP TO 15' PEAK HIGH FOR
EVERY FOOT OVER 15 ADD 1' TO SET BACK.
JOB NAME
PHONE# ,'DJ 9 s— 6279
ADDRESS 40200
xfoo149 me- v/
lA
9,2°1
01100