Loading...
2010, 04-22 Permit App: 10001067 Pole BldgProject Number. 10001067 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 4/22/2010 Page 1 of 2 Project Information: Permit Use: 30 X 54 POLE BLDG Contact: QUALITY STEEL BLDGS Address: 7810 N MARKET ST C - S - Z: SPOKANE, WA. 99217 Setbacks: Front Left: Right: Rear: Phone: (509) 468-1606 Group Name: Site Information: Project Name: Plat Key: CONV Name: CONVERTED CNTY DATA District: Sout Parcel Number: 45324.2102 Block: Lot: SiteAddress: 4026 S WOODRUFF RD Location:: CSV Owner: Name: YOUNG, MIKE Si RACHEL Address: 11207 E 37TH AVE SPOKANE VALLEY, WA 99206 Zoning: R-2 SF Res Suburban District Water District: 100 SPO CO WATER DIST#3A Hold: ❑ Area: 16,350 Sq Ft Width: 109 Depth: 150 Right Of Way (ft): 0 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: trnuagesmastwr Review Building Plan Review Released By: Originally Released: 4/22/2010 By: tmelbourn Landuse/Zoning/HE Conditions Released By: The detached structure is at the maximum size limit of 10% of lot size. Originally Released: 4/22/2010 By: kkendall Permits: Operator: JD Printed By: jmm Print Date: 4/22/2010 Project Number: 10001067 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 4/22/2010 Contractor. QUALITY ROOFING LLC Address: PO BOX 573 SPOKANE VALLEY WA 99037 Description Grp Type Notes GAR WOOD U-1 VB Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBCC SURCHARGE Building Permit Page 2 of 2 Firm: QUALITY ROOFING LLC Phone: (509) 862-6339 This Application: Sq Ft Valuation 1,620 $35,640.00 Totals: 1,620 $35,640.00 Units Unit Desc 1 1 1 SELECT SELECT SELECT Permit Total Fees: Total Project: So Ft Valuation 1,620 $35,640.00 1,620 $35,640.00 Fee Amount $502.35 $125.59 $4.50 $632.44 Notes: Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $632.44 $632A4 $125.59 $506.85 $632.44 $632.44 $125.59 $506.85 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 4/22/2010 RECEIVED 04/19/2010 13:32 5096880037 04/19/2010 01:32 FAX 5094683720 QUALITY STEEL BUILDINGS 110001 SV PERMIT CENTERFR Permit Center "' `* ne 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 .000Vdlleey (509)688-0036 FAX: (509)688-0037 Community Development www. spokanevallev. org Residential Construction Permit Application SITE ADDRESS: 4026 S WOODRUFF RD PERMIT NUMBER: / r7/O4.7 PERMIT FEE: xx New Construction XX Accessory Bldg Addition/Remodel n Deck n Other: ASSESSORS PARCEL NO: 45324.2102 LEGAL DESCRIPTION PONDEROSA STH ADD L2 B1 Building Owner: DIMENSIONS: 30X 54 — # OF STORIES: 1 Name: YOUNG, MIKE & RACHEL MAIN FLOOR TO SQ. FTG: N/A 2"" FLOOR SQ. FTG: N/A Address 4026 S WOODRUFF RD IMPERVIOUS SURFACE AREA: NONE FINISHED BASEMENT SQ. FTG: N/A City: SPOKANE VALLEY State: WA Zip: 99206 Phone. 509-475-6279 Fax: HEAT SOURCE: NONE :Contact:Person Name: NATHAN ROBINSON Phone: 509-468-1606 Describe the scope of work in detail: 30X 54 X 14 Contractor: DIMENSIONS: 30X 54 — # OF STORIES: 1 Name: Quality Steel Buildings, Inc. MAIN FLOOR TO SQ. FTG: N/A 2"" FLOOR SQ. FTG: N/A Address: 361 SANDY SHORES RD IMPERVIOUS SURFACE AREA: NONE FINISHED BASEMENT SQ. FTG: N/A City: NEWPORT State: WA Zip: 99156 Phone: 509-468-1606 Fax: HEAT SOURCE: NONE Contractor Lic No: QUALIBO81 C7 Exp Date: 2/11 City Business Lic. No: 601370591 1 I Cost of Project: $ /7arj f Proposed Use: SHOP **************The following MUST be coete: (write N/A if not applicable)********************** mpl HEIGHT TO PEAK: 19 DIMENSIONS: 30X 54 — # OF STORIES: 1 TOTAL HABITABLE SPACE: NONE MAIN FLOOR TO SQ. FTG: N/A 2"" FLOOR SQ. FTG: N/A UNFIN BASEMENT SQ. FTG: N/A IMPERVIOUS SURFACE AREA: NONE FINISHED BASEMENT SQ. FTG: N/A GARAGE SQ. G: 1620 0 t DECK/COV. PATIO SQ. FTG: N/A 30% SLOPES ON PROPERTY: NO # OF BEDROOMS: N/A CONST TION TYPE: HEAT SOURCE: NONE SEWER POLE The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Play or addition- ormation may be required to be submitted, and su. equently approved before this application can be processes /� SIGNATURE: DATE: Method of Payment: ❑ Cash Bankcard #. Authorized Signature: ❑ Check ❑ Mastercard Expires: XX VISA VIN#: Effective 10-28-07 Page 1 of 1 C:\Documents and Settingslmbrown.QSBINC1My Documents\permits\Residential Building Permi Spokane jUalley° For City Use Only PLUS Project Number k 0 b1 Project Address Project c , 1 O(• r7; 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 ♦ permitcenter@spokanevatley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your projeci't :pplic.ton will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. > Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the. expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date'if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for . deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 LrS51 Ze- 1 35o Ji. n a Poo C1 PLANNING BY: DATE: Quality STEEL BUILDINGS, INC. N. 7810 Market Center Suite Spokane, Wa. 99207 LIC# QUALISBO81C7 SITE PLAN SHOW NORTH PT. APPROVED (509) 468-1606 office (509) 468-3720 fax tOoofru.--c� /09 n 10' FROM SEPTIC/DRAINFIELD SHOW STREETS/ALLEYS SHOW SEPTIC/SEWER/DRAINFIELD SHOW EXISTING BUILDINGS SHOW SETBACKS-FRONT,REAR,SIDE SHOW LOT SIZE SIDE YARD & REAR YARD SET BACKS. 5' TO PROPERTY LINE UP TO 15' PEAK HIGH FOR EVERY FOOT OVER 15 ADD 1' TO SET BACK. JOB NAME PHONE# ,'DJ 9 s— 6279 ADDRESS 40200 xfoo149 me- v/ lA 9,2°1 01100