2013, 08-16 Permit App: BLD-2013-1628 Accessory StructureSpokane
Valley®
limunity Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 688-0036
Fax: (509) 688-0037
perm itcenter@sooka neva llev.orq
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
tgj NEW CONSTRUCTION ❑ ADDITION/REMODEL ® ACCESSORY BUILDING
❑ DECK OTHER �f02C, rr
SITE ADDRESS: `1/ 2 5 S. u)000 -0FG 120 RECEIVED
ASSESSORS PARCEL NO.: )63a /paw LEGAL DESCRIPTION:
BUILDING OWNER NAME: J4--mi--s £ 4,04Er,a (2 t
NAME: J001/1 CS E /`/ /vC Gr $ 60.2
ADDRESS: 4111 2 5 S. WOOD 2 t1 F
CITY: 500 JC A +J C 041.11Ey STATE: 1A-'
PHONE:
So 9- 4- 55 6
AUG t b 2093
CSV PERMIT CENTER
z1P:.�.92e
FAX: CELL: ,50 - Siv/
CONTACT NAME: 3 m ES C 04.c
PHONE: s0 y- 9-24 - 5 6 4.
FAX: CELL:
CONTRACTOR NAME: J4 0_40 /o /C2
MAILING ADDRESS:
A-rn ids wvt 2
CITY:
STATE: ZIP:•
PHONE:
FAX: CELL:
CONTRACTOR LICENSE No.:
EXPIRES: CITY BUSINESS LICENSE NO.:
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE:
$ri/Li) //'g 4' 'S'6/oP — jeepuJorzr- J, /T'G£ CAL& $r'AA5C
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NOT APPLICABLE
Height to Peak:
/51 s"
Dimensions:
D' i<-3 n'
No. of Stories:
/
Total Habitable
Space: Nfr'
Main Floor SQ FT:
/v C70
Upper FloorQ FT:
Ai
Unfinished Basement SQ
FT: II/4
Finished Basement SQ
FT: t//4
Garage SQ FT: .
A0
Deck/Covered Patio SQ
FT: Al/A-
Impervious Surface
Area: 7
,/9,54/ .. /J %
30% Slopes on
Property: A/0
No. of Bedrooms:
Construction Type:
Heat Source: /4zon4 J240Ot.T$ewer
or Septic: Sc-'-i--)c a -
TOTAL COST OF PROJECT: $ /Si/ ODo
r /2 za TA/ /5"-226.
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit Is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit Inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction Is to be done In full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
Information may be required to be submitted and supsequently approved before this application can be processed.
Signature t %g
_,��,
Date: g"--/..)---/..?
Updated 1-11-11 Page 1 of 1
http://www.spoka nevalley.org/filestorage/124/938/210/948/1496/Building_Perm it_-_Resid entia I_11-11-11.doc
RESIDENTIAL CHEtLIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
o SITE PLAN
❑ Property lines and dimensions
❑ Direction arrow pointing North and orientation to streets
❑ Proposed/existing buildings (footprint and dimensions)
o Utilities, septic tank/drain field locations and distances
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
O Elevations (Front/Rear/Sides) with roof peak and wall height including basement:
o Setbacks to property lines
o Distance between buildings
❑ Right of way/easement location & sizes
o Driveway approach size and location
❑ Foundation Plan (crawlspace, basement or slab on grade):
o Footing sizes and locations
o Perimeter concrete foundation wall sizes
o Crawlspace ventilation
o Supporting wood cripple walls or beams
o Thickened concrete pads supporting
beams or girder trusses
O Floor Plan of each level (finished or unfinished) with dimensions:
o Floor Joist direction, size and spacing o Window and door location and sizes
o Header, beam or concrete lintel sizes 0 Window well locations if applicable
❑ Brace wall panel locations 0 Room usage labels
❑ Water heater and furnace locations
O Exhaust fan locations
❑ Deck or concrete patio sizes and locations
❑ Roof Plan:
❑ Engineered truss direction and spacing
o Rafter and over frame direction, size and spacing
❑ Wall Section Detail including:
Roof
o Slope/ roofing material/ underlayment/ ice dam protection
❑ Sheathing size and type
Ceiling
o Joist size and spacing
Wall
o Height/ top plate/ stud size and spacing/ sole plate
o Exterior sheathing size and type
Floor
o Joist size and spacing
Foundation Wall
o Concrete or Masonry unit width
o Earth to wood separation distance
Footing
o Size
Radon
o Passive system with Emil vapor barrier
Miscellaneous Construction Details
❑ Deck:
o Floor plan/ side view/ dimensions
o Floor Joist/ decking'direction, size and spacing
❑ Stairway tread rise & run and nosing
o Smoke detector locations
o Attic and crawl space access locations
❑ Fire Wall construction
❑ Ridge, eave and valley lines
o Beam and girder size and location
o Truss or rafter size, spacing & connection
o Attic insulation/ air space baffle/ ventilation
0 Size of ceiling gypsum wall board
❑ Siding/ exterior house wrap/ anchor bolts
o Insulation, vapor barrier, gypsum wall board
0 Sheathing or concrete floor size/ insulation
❑ Footing bottom to finished ground level depth
❑ Horizontal & vertical reinforcement if any
o Reinforcement if any
❑ Active system with 6 mil vapor barrier
o Footings/•post/ and beam size and locations
O Handrail / Guard height & spacing
•
*octane
e�'a
.may`
•
Residential Driveway
PAVING WAIVER
Community Development – Planning Division
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.720.5026 ♦ Fax: 509.688.0037 ♦ planning@sookanevallev.org
Spokane Valley Municipal Code (SVMC) Section 19.40.020.B; "All residential driveway and off-street parking areas shall be paved with
asphalt, Portland cement grasscrete, paver blocks or other equivalent hard surface material". A paving waiver can only be granted if.
the structure you are proposing is not going to require a driveway for daily use.
– OWNER INFORMATION
OWNER NAME: Jq m 65 £ ,Q iticet A 002 6
PARCEL #: //5S"al/ /CO `s
ADDRESS: '1/25 S. /4000.e. 0Al),
CIT': S Po K141✓E I%t4t t e ci
STATE: 1L JJ.
ZIP: 9 9a o,
PHONE: 50 ?- 9.24- 5-5-66
FAX:
CELL: 5o9- 4,19'h - 61'-//
EMAIL: 44 Om Co.2C ncJ rss4 60/
PART II –DETAILS OF PAVING WAIVER
1. Do you have an existing garage for parking daily use vehicles? YES ❑ NO
2. Is the proposed detached structure used for storage only? ❑ YES k NO
3. Do you plan on using the detached structure to park vehicles? M YES ❑ NO If yes, then
what type of vehicles? vuu r*G L an
4. Do you plan to conduct a business from proposed detached structure? ❑ YES M NO If so, what
is the nature of your business?
PART III –AUTHORIZATION
I,(PRINT NAME) JArn if &DMC owner, hereby confirm that the information provided on this
form is true and correct. 1 acknowledge that any change in the foregoing conditions, could require
the City to impose paving requirements. I further agree to report any change in these conditions to
the Spokane Valley Community Qevelopment Department, Planning Division, within 30 days.
a
Owner Sia nature
Date
PART IV – DECISION
STAFF HAS REVIEWED THE PROPOSED PAVING WAIVER ON BEHALF OF THE COMMUNITY DEVELOPMENT
DIRECTOR AND FIND THE REQUEST IS GRANTED AT H 12 5 5 wooARUFF VD
SAID ADDRESS FOR PERMIT #:
'�n9' i.2u cif 1
egaseSt—
PI ning Division Staff Signature Date
21/&/ZO f 3
Created 6/27/11
Page 1 of 1
130
0
4.1 008.
6
SCOUTr) Printed froillitps.spokanecounty.org on 08/14/2013 ilk 36 PM
Spokane County �_.
•
#Valley
.
Target Date sheet
For City Use Only �� S\
PLUS Project ,;, L- ' �- CSS
Protject Address
Lviooeurl-
11703 E Sprague Ave Suite 13-3 ♦ Spokane Valley WA 99206
509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project application, we are
providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet
this date, we will contact you with a revised target date.J
Your application review TARGET DATE is �f (../ ! 13
The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is
not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
> Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be
several days before they can look at your new or revised information.
> Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise
for dealing with reviewer comments would be the best choice for the entire review process.
• Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your
target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will
save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as
indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does
not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from
substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is
complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review.
Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email,
or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the
application are received, a Permit Specialist will process the application and contact the person specified on your application for
permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at
that time.
CD -003 V-7/ 06-21-11 Page 1 of 1
• •
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -13001426
Permit Issued Date: 08/14/2013
Expiration Date: 08/14/2014
Project Description:
Project Name:
Primary Contact:
Phone:
SEWER CONNECTION
W PONDEROSA
CORE, JAMES A & ANGELA T
509-926-5560
Applicant: CORE, JAMES A & ANGELA T
Address:
Phone:
Email:
4125 S WOODRUFF RD
SPOKANE, WA 99206
509-926-5560
SITE INFORMATION.
Site Address: 4125 S WOODRUFF RD
Parcel Number: 45324.1004
Assessor's Description: PONDEROSA ACRES 6TH ADD L4 B2
Inspection Area: : (509)-477-3675
Zoning:
Owner:
Address:
Phone:
Email:
Water District: Spokane County Water
District #3
CORE, JAMES A & ANGELA T
4125 S WOODRUFF RD
SPOKANE, WA 99206
509-926-5560
Fire District: Spokane Valley Fire
Land Area: 1.19 Acre(s)
CONTRACTOR INFORMATION'
OWNER, Exp. 12/31/2015
OWNER PERFORMING THE WORK
SAME AS SITE ADDRESS SAME, WA 00000
DETAILS.
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$26.32
$250.00
$276.32
2 $125.00 $250.00
$250.00
CONDITIONS.
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
•-� DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
Date Printed: 08114/2013 11:55:15 Project Coordinator: Kathy Cummings
i
1
r‹
t1 i
ME,,,
4 N
141
illggmaglE
n
3'
1.
ei
o
I
1
A
K
P
r
0
N
5
ad
0,
O
I
J
V
Y
4
8
0
®11
4P
§t
vt
u.
G
IIO
13
ai o a
0
W
0
H
t
a
ADDRESS: 41z5 S, Wmal) to;
REVISION
DATE:
` MMP
inewAPPROVED BY:
ununEs DIRECTOR
SPOKANE COUNTY UTILITIES DEPARTMENT
SIDE SERVICE CONNECTION
RECORD DRAWINGS
SHEET
NO.
U-16
• •
1
PP -
Cr,
CD
uJ
UJ
LLI
(1)
L! ,
c,
.51 lee
t.1
:, .•
O 0 .i.
.44(,)
)
0)
- _
.t - _
*
cY•
a
ILA 4i.
• N•••
v
• CZ% k`"`"
•4
Xibt 0— I
C.3? •
;
"..."'a• • 1 '( - - c'14 -....
< 1 >
I -.1
..,
-.4
I
ilk-- ,....,c5. .............!>
----, -->• • i» -:i L... cl
%..) • • i
L ...__ cot
. ( .
i 1
i ..,
V a I *
_... !
-.-----A-". -
• 45 • I :W
-4, /
1 41......M.111L.m........,
1:61 1
I Z
.1
jx.
.92
r--- • --'7 -.3 I i \-x, I J-- , ,7
i
...- 1
! °
..Y 144 0.
:/t) ,...-,4,-,.., — — ------.,a . __ t
,.. _, 0/ ._
_:' ........„,...,,
..)
'A --4- -
.......
--:
.1.
cs. :
.
-_:'\
• "" •-•-:
t4i Q ,
k7` • a:
L, ) , Nrs ,..r. — • -•.1
C I .....‘)
c?. .,...... , k
PLANNING DEPT. APPROVED
Br -744.27"
DATE. '7 hc, /zo