Loading...
2014, 04-11 Permit App: APR-2014-0010 Secondary ApproachSpokane� jValley Development Engineering 11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.1000 ♦ Fax: 509.921.1008 ♦ cityhall@spokanevalley.org Approach Permit Application Review TO: Building Department Site Address: 4617 N Woodlawn Road Project No: APR -2014-0010 Reviewed By: Date: 441 14- Accepted Not Accepted Approach X Building Location Paved Access Notes: 1. Approach to be constructed pursuant to City of Spokane Valley Street Standards, Standard Plan R-112. 2. Saw cutting of existing curb to create an approach is not allowed within the City's jurisdiction. 3. Approach is to be inspected by the City's ROW Inspector prior to concrete placement. Reviewed By: Date: 441 14- 3/8' EXPANSION MINT s 3' 3' —PROJECTED TOP OF CURB ELEVATION r6" r1/2" UP '4 4. 6" PORTLAND CEMENT CONCRETE SECTION A—A GENERAL NOTES 1. EXPANSION JOINT MATERIAL SHALL BE PLACED IN THE CENTER OF ALL DRIVEWAYS OVER 20' IN WIDTH. 2. EXPANSION JOINT REQUIRED IF POUR INCLUDES ADDITIONAL DRIVEWAY AREA. 3. PORTLAND CEMENT CONCRETE SHALL BE CLASS 3000, AIR ENTRAINED. 4. ALL EXTERNAL EDGES TO BE TROWELLED WITH 1/4' RADIUS EDGER. 5. SIDEWALK TO BE SCORED EVERY 5'. 3/8' EXPANSION JOINT TO BE INSTALLED AT LOCATIONS WHERE SIDEWALK INTERSECTS OTHER SIDEWALKS AND DRIVEWAYS. 6. MIN. 4' THICK CRUSHED SURFACING TOP COURSE LAYER UNDER DRIVE APPROACH. 7. FIRST 2' OF DRIVE APPROACH (AT CURB SIDE) SHALL BE THICKENED TO MATCH BOTTOM OF CURB. THROAT WIDTH DISTANCES TYPE MIN. MAX. COMM. 30' 40' RES. 16' 30' EXPIRES q/2_9 /2 o/ o DEvELOPMENTSEAVIG6 SENIOR ENGINEER APPROVED FOR PUBLICATION l 2 /09 sitioorkanestift. a FValley® DRIVEWAY APPROACH ADJACENT SIDEWALK STANDARD PLAN NO. R-112 CIIY()F� Spokane galley. Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenterPsookaneva Ilev.orq (Staff Use Only) . PERMIT NUMBER: hP�e�I�T /D/�. PERMIT FEE: S.1. DO APPROACH PERMIT APPLICATION , PROJECT ADDRES �� ( • 1, 1J o � I a (A) l�� START DATE: 4-14/1 ANTICIPATED COMPLETION DATE: BUILDING OWN R NA((((ME: LAO ‘ k-,11/\.__ 40 n (• 1,DO0-8:2__QO _- CITY: STATE: V.A(4. ZIP: MAILING ADDRESS: 4-/W14 CONTACT PERSON NAME: PHONE: FAX: CELL: CONTRACTOR NAME: MAILING ADDRESS: CITY: C/ 14_,-> `N (- . s n,< t k �' �(Qq I _E • Win.) ZIP: R ! b.DS PHONE: 5:30C1'- 1 l ^ I IP6C;) FAX: CELL: CONTRACTOR LICENSE No.: V NO Q,/2 xPIRES: 411 i /t cp CITY BUSINESS LICENSE NO.: 'k 3 3,k, Rip PROJECT DESCRIPTION (Please Provide Site Sketch) 14) Residential Driveway ID Commercial/Industrial Driveway Existing Curb & Gutter ! Rural Road Section El Culvert Installation n Sidewalk Repair/Construction ❑ Other Conditions: Bond/Insurance certification must be on file with the City. DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit Is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner In this transaction. 4) All construction Is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional Information may be required to be submitted and subsequently approved before this application can be processed. �,, )0t4" °191Signature roiAct # Date: • "`.- AVIA1 1 2014 CSV PERMIT CE``:T�R SUB # L_.+- Updated 1-11-11 Page 1 of 1 http://www. spokaneva 1ley. org/filestorage/124/938/210/948/1496/Approach_Perm it_1-11-11. doc • APPROACH PERMIT APPLICATION REQUIRED SKETCH INFORMATION (Revised 1/25/10) Provide required measurements (in sketch boxes), and include street name. Check all existing conditions that apply: ❑ Sidewalk ft wide ft from back of curb ❑ Streetside Swale O Drainage Ditch ❑ Drywell (show location on sketch) ❑ Other (please describe below) w CURB' DISTANCE FROM NEAREST PROPERTY LINE MA BE LEFT OR RIGHT SIDE) FT (SEE TABLE) CONCRETE APPROACH 1-4'4—THROAT WIDTH EaFT--4--4' I WING (SEE TABLE) WINO STREET NAME w 0 a� r�.{ro STREET WITH CURB DISTANCE FROM NEAREST PROPERTY LINE MAY BE LEFT OR RIGHT SIDE) F—IFT (SEE TABLE) ASPHALT APPROA CURB RETURN NIF CORNER LOT, DISTANCE FROM CURB RETURN f3FT(SEE TABLE) 15' RADIUS RADIUS RETURN EDGE OF ASPHALT I-71ROATWID ' nFT (SE ABLE) STREET NAM STREET WITH ASPHALT EDGE \IF CORNER LOT, DISTANCE FROM RADIUS RETURN 0 FT (SEE TABLE) Approach Requirements: • Maximum 2 approaches per property frontage; one on arterials. • Total width of approaches not to exceed 50% of frottage valdth. • esidential Approac e Commercial Approaches Distance from Curb/Radius Return 15' minimum 75' minimum Separation between Approaches (measured from centerline to centerline of each a. .roach None specified See Page 7-27 in City Street Standards Throat Width flat •ortion 16' min. 30' max. 30' min. 40' max. Win• Width at curb line 4 feet t •ical 4 feet .ical Minimum Distance from Side Property Line @ r w 5.0' 5.0' Minimum Distance from Crosswalk 5' �' :•,'� { %-:Tiff i APPROACH PERMIT APPLICATION rz rREQUIRED SKETCH INFORMATION (Revised 1/25/10) Provide reiluired measurements (in sketch boxes), and Include street name. Check all existing conditions that apply: ❑ Sidewalk ft wide _ ft from back of curb ❑ Streetside Swale ❑ Drainage Ditch ❑ Drywell (show location on sketch) ❑ Other (please describe below) • DISTANCE FROM • NEAREST PROPERTY UNE (MAK LEFT OR RIGHT SIDE) tLj] FT (SEE TABLE) w CONCRETE APPROACH 1^4'41 --THROAT WIDTH&LIFT 4' WINO (SEE TABLE) WINO STREET NAME STREET WITH CURB DISTANCE FROM NEAREST PROPERTY LINE AY BE LEFT OR RIGHT SIDE) FT (SEE TABLE) ASPHALT APPROA NIF CORNER LOT, DISTANCE FROM CURB RETURN I� FT (SEE TABLE) 15' RADIUS RADIUS RETURN EDGE OF ASPHALT STREET NA THROAT WID (SE STREET WITH ASPHALT EDGE IF CORNER LOT, DISTANCE FROM RADIUS RETURN Q FT (SEE TABLE) Approach Requirements: • Maximum 2 approaches per property frontage; one on arterials. • Total width of approaches not to exceed 50% of fro ntaeawidt:h. esidential Approac)es\ Commerclal Approaches Distance from Curb/Radius Return 15' minimum 75' minimum Separation between Approaches (measured from centerline to centerline of each approach) None specified See Page 7-27 In City Street Standards Throat Width (flat portion) 16' min., 30' max. 30' min., 40' max. Wing Width (at curb line) 4 feet typical 4 feet typical Minimum Distance from Side Property Line (@ r/w) \ 5.0' 5.0' Minimum Distance from Crosswalk 5' 5' 0010 47.9 0 23.96 47.9 Feet 0 This map is a user generated static output from an Internet mapping site and is for reference only. Data layers that appear on this map may or may not be accurate, current, or otherwise reliable.