2014, 06-18 Permit: BLD-2013-2754 Res. Energy Compliance Cert. •
Property Address: 6 i? S Set�Gt.is S Li.�v
i1e V'c (icy
Conditioned Floor Arca: i L5`3' Date: 6 / 1 /(y
Builder or registered design professional:
l`y I e 5;,.1 CA NSA.v. (0Q }z.) (Zeck) Cf6LI—� :t
Signature:
R-Values
• Ceiling: Vaulted R- Flours: Over unconditioned space R-
Attic R- y Slab on grade floor R-
y lQ
Walls: Above trade R-).1 Doors: R-
:
Below. int. R- r(t V R-
Fielmv,ext. R- R-
Lr-Factors and SHGC
ter_' NFRC rating(or) Windows U , �Z SHCiC- N/A
• Default rating 4 Arperdi\A V;SII 21;1_; Skylights U- SHCiC- N/A
• Table 4616..2 Option(s) Total 406.2 Credits
Heating,Cooling A.Domestic Hot Water
System Type Efficiency
- Heating Gas f
Cooling
:.n
DHW crs
.` Aurt do BI dl
ng,dir Leakage
All ducts& HVAC in conditioned space ( yep i no ) Insulation R-
Air handler present I yes no.t
Test"l arget CFM;u25Pa Test Result CFM(a 2SPa
Building air leakage target: ACHu <5.0-Tested leakage:PCH,, – L. 7
&Ore Renewable&t
eat Meanie rawer rt
System type: Rated annual generation Kwh
r__ WASHINGTON STATE UNIVERSITY
EXTENSION ENERGY PROGRAM
Support
Duct Leakage Affidavit
Permit#:
House address or lot number: (OfA 5 5C i l r K
City: Sciok;inne Uraey Zip:
Cond. Floor Area (ft2): 1` 0 Source (circle one): Plans stimate Measured
❑ Duct tightness testing is not required for this residence per exceptions listed at the end of this document
Air Handler in conditioned space? ❑ yes N no Air Handler present during test?t4 yes ❑ no
Circle Test Method: Leakage to Outside • al Leaka:e
Maximum duct leakage:
Post Construction,total duct leakage: (floor area x .08) = CFM@25 Pa
Post Construction, leakage to outdoors: (floor area x .06) = CFM@25 Pa
Rough-In,total duct leakage with air handler installed: (floor area x .06) = (Olc, CFM@25 Pa
Rough-In,total duct leakage with air handler not installed: (floor area x .04) = CFM@25 Pa
Test Result: q1Z CFM@25Pa
Ring (circle one if applicable): Open 1 C 3
Duct Tester Location: �0sy,c.c,e_. Pressure Tap Location: Bc_seiyvt..0.1\-- re r V\
I certify that these(duct leakage rates are accurate and determined using standard duct testing protocol.
Company Name: VJC_'AZ Technician: 4,1,A
Technician Signature: V Date: a�/(o/N Phone Number:(208) (06 4- C 76 y
Washington State Energy Code reference:
503.10.3 Sealing.All ducts,air handlers,filter boxes,and building cavities used as ducts shall be sealed.Joints and seams shall comply
with Section M1601.3 of the International Residential Code or 603.9 of the International Mechanical Code. Duct tightness testing shall be
conducted to verify that the ducts are sealed.A signed affidavit documenting the test results shall be provided to the jurisdiction having
authority by the testing agent.When required by the building official,the test shall be conducted in the presence of department staff.
Exceptions: 1.Duct tightness test is not required if the air handler and all ducts are located within conditioned space.
2.Duct testing is not required if the furnace is a nondirect vent type combustion appliance installed in an unconditioned space.
A maximum of six feet of connected ductwork in the unconditioned space is allowed.All additional supply and return ducts
shall be within the conditioned space.Ducts outside the conditioned space shall be sealed with a mastic type duct sealant and
insulated on the exterior with R-8 insulation for above grade ducts and R-5 water resistant insulation when within a slab or
earth.