1973, 03-01 Permit: K670 Residence SPOKANE COUNTY BUILDING CODE DEPARTMENT if. -- I NUMBER K 6 7 0
811 N. Jefferson, Spokane, Washington 99201
JOB 215
Land Use or Structure Permit Property Address... d .own* S. 1224
Group I Type y--Zone..-$1.4194--P- i y..-Rie114 Permit for..Reside,e' gyro__ tont
Ownerits-. .--. er , inc„ Address... .--... . . Phone
r 20 Pi nes
.� Architects Address Road, Phone 924- + Q
Contractor R. ii..-movers IN., Address Phone
Location Parcel--ti 22643.4202. ..Lin- 20 Block *So Opportunity Terrace Estates. Minim--set-tea
--Front yard of a't- least 2Sto side yard of at least 5 o 10' for 2 story builOing.x...1 ' nankin
streets--and--25-t teem yards are required.
84 Bldg.
Zone ii. Fire Zone-- Size
Lot Sewage aStories.--- ..-.
Material DY
' 0t2 Total Sq. Ft.. lsValuation-$-28,550.00
Rooms-C-4..2-.baths Basementful= Foundationconorete Chimney Fireplace....2.....Heating System... as--f:a:--
E Certificate of Occupancy Issued for- sidencei---gar ---at ;h --...,fin..-ale .
LL Remark ffA AGE..4 '...Cfl ' RUCT di--MUST- HAVE--1 RECTI S-C i t--F ti--AS- .IR D--BY--000E. MUS'
OXF 1RA-- 'b.ALL ..C+ UKTY.-Ct E--REQ -IR S,, Plumbing---ate#---heat$ errsfts---are---req<uiredd. tint----
i.ns lotion--est-.be--ca l3-ed--fill~r-upon-- tabor-end--trior--t a-- penc of-- rstdence.--Call
456..467.1._
THIS PERMIT is granted upon the express condition that the building or land use for which the permit is issued shall conform in allrespects to all the ordinances of the County of
Spokane, regulating the construction, use and occupancy of buildings in Spokane County, and may be revoked at any time upon the violation of any of the provisions of said ordinances,or
failure of plans as approved, to comply with said ordinances.
Gin consideration of the issuance of the permit for the erection of signs the grantee must place the said signs where directed by County Officials and shall remove the said sign at the
expiration of the permit unless regularly renewed.
This permit will be good only for commencement of work within six months, and the entire completion thereof within.-
from this date; after which time this permit will be void.
Authorized by Building Official
2�L-f/zri .) �.p.BUILDI,N�ADE DEPARTMENT
Permit Expires... R L../. 1.9?4 L By - - ' '=
INSPECTOR
Fee Paid $.3$,;00..x, Date Issued 3 '1/73 Building
_ ' �� _ ��� — '_ ___ _�_� __-— �� - - ___ _—_—_�__�_ —_�_ _—'
Cle) •
/fJ~~
7 » ! � ,
L. F0UND&lKlM -- �r
,•),„
� -
' ~
2. STEEL
4,w,/ ~^~eee:-^,�
'y
"
3. FRAMING. '°_ . �
4. LATHING - --___ _ _~,e°
•
^ '
5. FINAL
§.
7. F\REFL;',�[S _'___-__.'_,~�,�___�_,~
B.
8. H.'7KG
SYSTBM----'
.
(
- _ - '