Loading...
2014, 11-20 Permit: BLD-2014-1844 Res. Energy Compliance Cert. Property Address: 710 Selkirk Spo1CCAv e Vcos1\e4 Conditioned Floor Area: 1—)98 Date: 11/>i;O/J L( Builder or registered design professional: Kyle 3tidC.,.VCcA•t CDuCrz) CZO2) 96tl-5:58q Signature: / R-Values Ceiling: Vaulted R- �/9 Floors: Over unconditioned space R- Attic R- (71 Slab on grade floor R- Walls: Above grade R-..2/ Doors: R- Below,int. R- /d R Below,ext. R- /D R- s. v U-Factors and SHGC ."--INFRC`rating(or) Windows U- ,3a SHGC- N/A Default rating(Appendix A Wsrc 2012, Skylights U- SHGC- N/A Table 406.2 Option(s) Total 406.2 Credits Heating,Cooling&Domestic Hot Water System . Type Efficiency Heating 6—QS Cooling (ra,s ,r DHW ' Duct&Building Air Leakage , All ducts&HVAC in conditioned space()_.);--,'no) Insulation R- /0 Air handler present (yes no) Test Target CFM(a:25Pa Test Result CFM(425Pa Building air leakage target:ACHS„<5.0-Tested leakage:ACHS„= Li. g Onsite Renewable Energy Electric Power System System type: Rated annual generation Kwh , w WASHINGTON SI, I [ UNIVERSITY S ii p z nm n EXIEN YON ENERc:5 f'fa��;.;t?.•�V;I Duct Leakage Affidavit (New Construction) Permit#: House address or lot number: 110 S. St.:,1(.,,, rK. City: Spb c-kot, U, \ke1 Zip: Cond. Floor Area (ft2): li Lb Source (circle one): Estimated Measured ❑ Duct tightness testing is not required. The total leakage test is not required for ducts and air handlers located entirely within the building thermal envelope. Ducts located in crawl spaces do not qualify for this exception. Air Handler in conditioned space? [ryes ❑ no Air Handler present during test?154 yes ❑ no Circle Test Method: Leakage to Outside otal Leakage Maximum duct leakage: Post Construction,total duct leakage: (floor area x .04)= CFM@25 Pa Post Construction, leakage to outdoors: (floor area x .04) = CFM@25 Pa Rough-In,total duct leakage with air handler installed: (floor area x .04) = '70 CFM@25 Pa Rough-In,total duct leakage with air handler not installed: (floor area x .03)= CFM@25 Pa --I• Test Result: 63 CFM@25Pa -- J Ring (circle one if applicable): Open 1 ) 3 Duct Tester Location: .Fur VV.Cs2-- Pressure Tap Location: (34.-- %. I certify that these duct leakage rates are accurate and determined using standard duct testing protocol. Company Name: 0tJc.,7i Technician: v; Technician Signature: / Date: lU -rJ— (c/ Phone Number: IZDc6 664- (7O 4