Loading...
16-102.02 Cameron Reilly: Seth Woodard Sidewalks Spokane .....*Valley CHANGE ORDER NO: 2 DEPARTMENT OF PUBLIC WORKS CONSTRUCTION CONTRACT NO: 16-102 PROJECT: Seth Woodard Sidewalk Project CONTRACT DATE: 7/14/2016 PRIME CONTRACTOR: Cameron-Reilly. LLC CIP NO: 234 DESCRIPTION OF CHANGES This Change Order provides payment for bid quantity overages for the following two items: Schedule A Bid Item 111, SAWCUT ASPHALT CONCRETE PAVEMENT-8,207 LF-IN Schedule A Bid Item 129, CEMENT CONCRETE DRIVEWAY APPROACH-341 SY Item No, Description Unit Quantity Unit Price Total CO-2.1 SAWCUT ASPHALT CONCRETE PAVEMENT LF-IN 8207 1.00 8,207.00 CO-2.2 CEMENT CONCRETE DRIVEWAY APPROACH SY 341 55.00 18.755.00 Total Amount of this Change Order: $ 26,962.00 PHYSICAL COMPLETION Original Contract Working Days: 20 Revision By This Change Order: 0 Revisions by Prior Change Orders: 1 Total Revised Contract Working Days: 21 CONTRACT AMOUNT THESE CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF TOTAL CONTRACT AMOUNT: ORIGINAL TOTAL CONTRACT AMOUNT(Incl Tax) $ 335,026.00 TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT $ 3,160.50 TOTAL CONTRACT AMOUNT PRIOR TO THIS CHANGE ORDER $ 338,186.50 NET THIS CHANGE ORDER $ 26,962.00 TOTAL CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER $ 365,148.50 CONTRACTOR ACCEPTANCE: i . ` DATE: yc The contractor hereby accepts this adj ment under the terms of Section 1-04.4 of the original contract. RECOMMENDED BY: /.me . /%'. DATE: �!: 7• !(c., 666 Project, nager APPROVED BY: / / DATE: Ofr Public Works Director APPROVED BY: iY/lq- DATE: Cily Manager ATTACHMENTS: Distribution: ORIGINAL TO: City of Spokane Valley Clerk's Office COPIES TO: Contractor, PW Project File, Project Inspector, Finance Department Public Works Department Sp0,\.,„„„„ okaneCapital Improvement Program .•OValley11707 E Sprague Ave Suite 106 • Spokane Valley WA 99206 509.921.1000 ♦ Fax: 509.688-0261 • cityhall@spokanevalley.org Change Order Memorandum Date: September 8, 2016 To: Eric Guth Through: Steve Worley From: Craig Aldworth G4- Re: Change Order 2-Seth Woodard Sidewalk Project, CIP 0234 Budget Account No. 303.000.234.595.61.63.00 Cameron-Reilly Contract 16-102,c�a This is an administrative Change Order provides payment for overages in two bid items: a. Schedule A Bid Item 111,SAWCUT ASPHALT CONCRETE PAVEMENT The unit bid price is $1.00/LF-IN,the bid quantity was 1,000 LF-IN, and the measured quantity is 9,207 LF-IN. The resulting overage= (9,207-1,000)LF-IN x$1.00/LF-1N=$8,207. This overage will be paid for under Change Order 2 Item 2.1 b. Schedule A Bid Item 129,CEMENT CONCRETE DRIVEWAY APPROACH The bid quantity was 200 SY. This quantity did not include the wings on each side of the driveway. The unit price is$55.00/SY and the measured quantity is 541 SY. The resulting overage=(541-200) SY x$55.00/SY=$18,755. This overage will be paid for under Change Order 2 Item 2.2. Total change order cost is$8,207+$18,755 =$26,962.00. This project is 80%funded by Community Development Block Grant 15-17. The 20%match is funded by Spokane Valley Fund 301. Stormwater improvements are funded under Spokane Valley Fund 402. There are sufficient funds in the project budget to cover these costs. Original Contract amount= $ 335,026.00 Previous Change Order Cost=(Ped wall @ SE corner Bowman & Mission) $ 3,160.50 Change Order#2 Cost= $ 26,962.00 Project Cost including Change Order#1 = $ 365,148.50 15%of Original Contract amount= $50,253.90 Max Public Works Director Contract authority= $50,253.90 Change Order Cost to date= $30,122.50 Remaining P.W. Director Contract Authority after CO #/Z $20,131.40 Cc: Finance Department, Clerk's Office CITY OF Public Works Department pokane Capital Improvement Program 4••••*Valle 1 11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.1000 ♦ Fax: 509.921.1008 ♦ cityhall®spokanevalley.org Change Order Memo Date: September 8, 2016 By: Craig Aldworth Re: Change Order 2 Seth Woodard Sidewalk Project, CIP 0234 1. Describe the Change This Change Order is an administrative change order providing payment for overages in saw cutting asphalt pavement and constructing cement concrete driveway approaches. 2. Evolution of the Change The overages are a result of quantity measurement errors during bid document preparation and of extending quantities during construction to tailor the project to the field conditions. The project design was completed with the drafting and final quantity measurements made by a technician working for a consultant in the Tri-Cities who was not familiar with the way typical CIP projects are assembled. The quantity measurements were not double checked prior to putting the project out to bid because in house staff was busy meeting other project deadlines and the project needed to be bid in order to be constructed during the school summer recess. Additional pavement cutting was ordered in the field to ensure finish pavement was well drained and that the pavement joints were located out of wheelpath areas. Additional driveway approach area was added during construction to better fit the existing conditions and adjacent property owner preferences. 3.Payment a. Schedule A Bid Item 111, SAWCUT ASPHALT CONCRETE PAVEMENT The unit bid price is$1.00/ LF-IN, the bid quantity was 1,000 LF-IN, and the measured quantity is 9,207 LF-IN. The resulting overage = (9,207 - 1,000) LF-IN x$1.00/LF-IN = $8,207. b. Schedule A Bid Item 129, CEMENT CONCRETE DRIVEWAY APPROACH The bid quantity was 200 SY. This quantity did not include the wings on each side of the driveway. The unit price is $55.00/SY and the measured quantity is 541 SY. The resulting overage = (541 -200) SY x$55.00/SY= $18,755. Total change order cost is $8,207 + $18,755 = $26,962.00. 4.Time No additional time is granted. The project is substantially complete. 5.Prior Approval The Public Works Director approved this Change Order before the first pay application was executed. 6.Attachments Change Order 2, Pay Application 1 tioka Public Works Department ne Capital Improvement Program Valle 11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.1000 • Fax: 509.921.1008 ♦ cityhall®spokanevattey.org Change Order Memo Date: September 7, 2016 By: Craig Aldworth Re: Change Order 2 Seth Woodard Sidewalk Project, CIP-0.234 1. Describe the Change This Change Order is an administrative change order providing payment for overages in saw cutting asphalt pavement and constructing cement concrete driveway approaches. 2. Evolution of the Change The overages are a result of quantity measurement errors during bid document preparation and of extending quantities during construction to tailor the project to the field conditions. The project design was completed with the drafting and final quantity measurements made by a technician working for a consultant in the Tri-Cities who was not familiar with the way typical CIP projects are assembled. The quantity measurements were not double checked prior to putting the project out to bid because in house staff was busy meeting other project deadlines and the project needed to be bid in order to be constructed during the school summer recess. Additional pavement cutting was ordered in the field to ensure finish pavement was well drained and that the pavement joints were located out of wheelpath areas. Additional driveway approach area was added during construction to better fit the existing conditions and adjacent property owner preferences. � 3.Payment � ‘Q, 01454)'(11 , a. Schedule A Bid Item 111, SAWCUT ASPHALT CONCRETE PAVEMENT The unit bid price is$1.00/ LF-IN and the measured quantity is 9,207 LF-IN. The resulting overage = (9,207 -1",000)LF-IN x$1.00/LF-IN = $8,207. b. Schedule A Bid Item 129, CEMENT CONCRETE DRIVEWAY APPROACH The bid quantity was 200 SY. This quantity did not include the wings on each side of the driveway. The unit price is$55.00/SY and the measured quantity is 541 SY. The resulting overage = (541-200) SY x$55.00/SY= $18,755. Total change order cost is $8,207 + $18,755 = $26,962.00. 4.Time No additional time is granted. The project is substantially complete. 5.Prior Approval The Public Works Director approved this Change Order before the first pay application was executed. 6.Attachments Change Order 2, Pay Application 1 0234-Seth Woodard Sidewalk Improvements All Activity as of Sep 8 2016 Project Prior Life Original Adjusted Years 2015 2016 To Date Available REVENUES Budget Budget Actual Actual Actual Actual Encumbered Funds 0333.1421 CDBG 358,790.00 358,790.00 0.00 0.00 19,241.83 19,241.83 0.00 339,548 17 0397.3010 301 31,197.00 31,197.00 0.00 6,203.70 0.00 6,203.70 0.00 24,993.30 0397.4020 402 40,000.00 0.00 0.00 0.00 0.00 0.00 40,000.00 Total Revenue 389,987.00 429,987.00 0.00 6,203.70 19,241.83 25,445.53 0.00 404,541.47 Original Adjusted Prior 2015 2016 Life Available EXPENDITURES Budget Budget Years Actual Actual To Date Encumbered Funds Preliminary Engineering 303.000.234.595.10.10.00 Salaries&Wages 20,000.00 15,000.00 0.00 883.43 14,909.95 15,793.38 0.00 -793.38 303.000.234.595.10.10.99 Overtime 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 303.000.234.595.10.20.00 Employee Benefits 7,000.00 6,000.00 0.00 401.71 5,270.36 5,672.07 0.00 327.93 303.000.234.595.10.20.99 Employee Benefits 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 303.000.234.595.10.41.02 Engineering&Architectural 0.00 10,000.00 0.00 0.00 10,365.47 10,365.47 0.00 -365.47 303.000.234.595.10.41.06 Prof.Svcs-Survey 8,000.00 5,500.00 0.00 4,918.56 0.00 4,918.56 581.44 0.00 303.000.234.595.10.41.07 Prof.Svcs.-Geotech 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 303.000.234.595.10.41.17 Advertising 1,997.00 0.00 0.00 0.00 1,088.38 1,088.38 0.00 -1,088.38 303.000.234.595.10.49.03 Printing&Binding 1,000.00 0.00 0.00 0.00 835.51 835.51 0.00 -835.51 303.000.234.595.10.49.06 Miscellaneous Services 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 303.000.234.595.10.99.99 PE Contingency 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total Prelim.Engineering 37,997.00 36,500.00 0.00 6,203.70 32,469.67 38,673.37 581.44 -2,754.81 Right of Way 303.000.234.595.20.10.00 Salaries&Wages 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 303.000.234.595.20.10.99 Overtime 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 303.000.234.595.20.20.00 Employee Benefits 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 303.000.234.595.20.20.99 Employee Benefits 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 303.000.234.595.20.41.05 Professional Services 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 303.000.234.595.20.61.01 ROW Acquisition 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 303.000.234.595.20.61.02 RW-Land Improvements 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 303.000.234.595.20.99.99 RW Contingency 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total Right of Way 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Construction 303.000.234.595.61.10.00 Salaries&Wages 20,000.00 20,000.00 0.00 0.00 10,005.16 10,005.16 0.00 9,994.84 303.000.234.595.61.10.99 Overtime 0.00 0.00 0.00 0.00 2,649.60 2,649.60 0.00 -2,649.60 303.000.234.595.61.20.00 Employee Benefits 7,000.00 7,000.00 0.00 0.00 5,044.82 5,044.82 0.00 1,955.18 303.000.234.595.61.20.99 Employee Benefits 0.00 0.00 0.00 0.00 111.26 111.26 0.00 -111.26 303.000.234.595.61.41.08 Prof.Svcs.Mat.Testing 10,000.00 10,000.00 0.00 0.00 0.00 0.00 0.00 10,000.00 303.000.234.595.61.41.10 Prof.Svcs.-Consulting 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 303.000.234.595.61.41.17 Advertising 1,000.00 1,000.00 0.00 0.00 0.00 0.00 0.00 1,000.00 303.000.234.595.61.49.03 Printing&Binding 500.00 500.00 0.00 0.00 0.00 0.00 0.00 500.00 303.000.234.595.61.63.00 Construction:Sidewalks 294,886.00 299,396.00 0.00 0.00 689.75 689.75 302,556.50 -3,850.25 303.000.234.595.61.99.99 CN Contingency:Sidewalks 18,604.00 15,591.00 0.00 0.00 0.00 0.00 0.00 15,591.00 Total Construction 351,990.00 353,487.00 0.00 0.00 18,500.59 18,500.59 302,556.50 32,429.91 Other Construction 402.000.234.595.40.63.00 Construction-Drainage 35,630.00 0.00 0.00 0.00 0.00 35,630.00 0.00 402.000.234.595.40.99.99 CN Contingency 4,370.00 0.00 0.00 0.00 0.00 0.00 4,370.00 Total Other Construction 0.00 40,000.00 0.00 0.00 0.00 0.00 35,630.00 4,370.00 Total Expenditures 389,987.00 429,987.00 0.00 6,203.70 50,970.26. 57,173.96 -338,767.94 34,045.10