2014, 08-05 Permit: APR-2014-0060 Approach City of Spokane Valley
goo., ane Community Development
11703 E. Sprague Ave., Suite B-3
.0•0
Vdlr Spokane Valley, WA 99206
(509)720-5240
sermitcontor c' s okanevalley.org
APR-2014-0060 DE-APPROACH
PROJECT NAME: SFR APPROACH ISSUED: 08/05/2014
SITE ADDRESS: 19421 E 1ST AVE SPOKANE VALLEY EXPIRES:
PROJECT DESCRIPTION: APPROACH FOR NEW SFR-LOT 5 BLK 2 COVEY GLEN N PH 1 SUB-02-12
PARCEL: 55202.2805
APPLICANT: VIKING CONSTRUCTION INC OWNER: VIKING CONSTRUCTION INC
2605 W HAYDEN AVE HAYDEN, ID83835 2605 W HAYDEN AVE
HAYDEN, ID 83835
FEES: Paid Due
Approach $52.00 $0.00
Totals : $52.00 $0.00
CONDITIONS
* All approaches are to be inspected by the Development Engineering Inspector(John Johnson 509-599-6306)prior to
placing concrete or asphalt.
* Prior to excavation, it is the Contractor responsibility to contact the purveyor of any transmission pipeline that is within 100
feet of permitted work, as per RCW 19.122.033.
* Saw-cutting of existing curb in the right-of-way in order to create an approach is not allowed in Spokane Valley.
* Approach to be constructed per Standard Plan R-110
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit
applicant, by definition, is the property owner or an authorized agent of the property owner. It is the
responsibility of the applicant/permittee that the use described on the front of this permit complies with
applicable codes and that required inspections are requested. Failure to request inspections as listed
below and obtain the necessary approvals before progressing beyond the point where inspections are
required and may necessitate removal of certain parts of the construction are the applicant's/permittee's
or property owner's expense.
Owngt7Agen� �� _ �_ _ Date: ��\�
Staff Approval Date:
Printed by:Bryan Happeny on:08/05/2014 02:30 PM