SP-1308
~
S P O K A N E ~ C O U N T Y
A DNISIUN OF THE PUBLIC WOKKS DEPARTMENT
DNISION OF PLANNIIVG
MEMORANDUM
TO: Division of Engineering and Roads, Dave Berto
Division of Engineering and Roads, Development Services, John Hohman
Division of Utilities, Information Services, Jim Red
Division of Utilities, Stormwater Utility, Brenda Sims
Division of Building & Code Enforcement, Ron Hand
Spokane Regional Health District, Steve Holderby
Spokane County Auditor's Office, Recording Dept., Tom Perkins
Spokane County Fire District No. 1
Hutchinson # 16
1
FROM: David Jensen, Associate Planner ` t
DATE: August 22, 2002 -
SUBJECT: Proposed Final Plat of Short Plat-SP-1308-02
Parcel No. 45083.0318
Attached are copies of the above referenced final short plat. Please review and forward
any comments to me by September 4, 2002. If you have any questions please contact me
at 477-7237.
enclosure(s):
copy without enclosures to: Mitchell Duryea, c/o Thomas, Dean & Hoskins, Inc., 303
E. Second Ave., Spokane, WA 99202. Patrick & Melissa Barclay, 892 N. Knights Lane,
Post Falls, ID 83854
~
MAIL STOP PWK-1 • 1116 W. BROADWAY AVENUE • SPOKANE, WASHNGTON 99260-0220
PHONE: (509) 477-7200 • FAX: (509) 477-2243 9 TDD: (509) 477-7133
~
S 0.-;c C> u N Tt2CE VED
A DIVISIOl\ OF CHE PI;BLK IVOi:hL- DEI'ARTMENT SEP 2 3 2002
Dt4'ISION OF PLAl~I~[NC
SPOKANE CI-„ ••r ~~R
a,....
MEMORANDUM P99&ftffJPD
TO: Division of Engineering and Roads, Dave Berto 0*2
FROM: Davici Jenscil, Associate Planner . @ER
DATE: September 23, 2002 .
SUBJECT: Proposed Final Plat of Short Plat-SP-1308-02
Parcel No. 4508 -3.0318
'I'he applicant and engineer are considering changing the lot design to enable water access
irom Marguerite rather than Boone. Do you have any issues re: this 10' foot dog-lcg visa
vi no driving on etc? Would we need to restrict access and show it on the face and/or
cicdication? Thank you
enclostire(s):
copy without enclosures to: Mitchell Duryea, c/o Thomas, Dean & I loskins, Inc., 303
E. Second Ave., Spokane, WA 99202. Patrick & Mclissa Barclay, 892 N. Knights Lane,
1'ost Falls, ID 83854
i
'~1;~it_ STUP PW'K-1 • 11 lh I'V. BRUAI)WAY AVENUE • SPOKANE, WASHIhGTOti 99260-0220
I'I IO\E': ftillyJ 47/7-7/2(1(1 • FAX: (509) 47-2243 • mn: (509) 477-7133
SP-1308-U1
V'icinity Map
*4i~ar~-~V senar~
S
ckcre ~ • 1~~-- `
\
_...r~ ~
{ad~ar ~ ~ ~ ~
~4adirM~ ~
08 X'.
Kmn
~ V
5►ss ~ - '
4w !
- ; ~ 17
]lrr 1
1-4;b ~ ~ _ 1~►+~~, ~-Ei ~ •
~
S~ S~rAa ~
. ~ ~
~
~ - ~
f
1Wfftr
~
qrthi#'8 Ness ElementarN
dte ~ ~ ~ --z
17 ~
~
18 ~ ' ~ ~•,nerwsy
~
~ kAne ell - Hl
~r---"~'"_~ , • i .
19
~
~
5cale inch ~ 1250 ft (roundca 05/31101 ~finntv .titiap
' PRELIMINARY SHORT PLAT
NE 1/4 SECTION 18, TOWNSHIP 25 NORTH, RANGE 44 EAST, W.M.
OWNER: LECAL DESCRIPTIQN
PAT BARCtAY EKIS7iNC ZONING: UR-3.5 ELECTRICITY PROVIDER: AVISTA nHE EAST 14.31 rtEr OF ar 9, D(CEPT THE NORiH 127.85 FEET
892 N. KNiCHTS LANE PROP05ED ZONING: UR-3.5 GAS PROVIDER: AVISTA n+EREOF; uNn. Lot 10, EXCfFf TNE NORTFI 127.65 FEET THEREOF.
POST FALLS, 10 99204 COMP. PLAN CATEGORY: LOW DENSITY RESIDENTIAL PHONE PROVIDER: QWEST BLOCK 7H~~~son's womoN, AS PER PtAT RECOROfD IN
CELL (509)-991-6468 PROPOSED PLAN: 2 RESIDENTIAL LOTS FIRE OISTRICT: #1 v0l.u►E ~O' OF PlATS, VAr,E 4, RECORDS OF SPOKf►IE oOUNiv;
HOME (208)-773-7422 WATER PROVIDER- HUTCHINSON IRRIGATION OISTRICT #16 SCHOOL DISTRICT: #363 SMAh w n+E Cour+n' OF SPOKANE. srAh OF wAs►iINCroN.
SEWER PROVIDER: COUNTY OF SPOKANE
MM iLEGAL a A. TAKEN rTU 4 ~
~
H TLH~1l~uf~ ADDITION ~
W
` LEGEND
~r S 89' 9'24" E N 89'56'07' W ;In ~OMM PROPOM UNE
9 .89' 138.83' "0 r DED"TM UNE
I o = _ - - tcTehac uNE
~ z ~ - eooe a AewXT
awH uNC rEW=
~ ~ EDU OF auvEL
~ ~ • rouND raoveRrr ooreeR
o vAOPeR►r coaEn P+m Poue►
W~ SCALE: 130' e oam+o MoNUrcrrt
~ Loerno unun POLE
n o o c~v TOTAL OWNERSHIP tnv I a~'~
o 25388,8 SQ. FT. I q oaenronne"rowwr
Z 0.58 ACRES y
eLEcnec ewX
V) o SMFDA
~ oeaouous ou~
euLara
IN 89'58' 4' W N 89'58_34" -W -~a I O
69.4 64.43 N O VICINITY ~IAP
LJ ' •
N 89'57'06" W F Not ro scuE
' 112 sG. rr.
84.88
iz o. JACRES
0
12518.1 SQ. R. I M I 1 Q
0.29 ACRES ~ Q -
i O
NOTE A: (PARCEL 'AJ) ~PARCfI '61 w°,u~sk~,,,rtm ~
HoMe
~ J
W 3 BE ^I • ` ~ ~ ~r l I '
g 52. I
00' °o 0 1Dn a,~i~
TOa~to J 1`" ' ~j • I I ? I I -
n I
M ~ ~ L ~L
N 52.00' Q
Z
1456.0 SQ. FT. V1 SEf NOTE A I ~ I ~ ; ~ _ •
0.03 ACRES
124.55' S 89'54'10" E - 90'00'00` E`
7--17-1
N 90'00'00' W
- - oMwwn Fu ah sa+~ asac ~a
662.79' '~.e''e° ~r E ~ „ ~ ~
BOONE AVENUE (40' ROW) ~~►,~„~r TD& Teo~s,DEAN&HOSIQNS,nvc.
3oo~ u~ OF ~nscc,nN a e~ca~c ca+s~n.TAxrs
modoom
~
Parcel: 45181.0318
Owner: BARCLAY, PATRICK L& MELISSA A
CoOwner:
Owner Address Z9 E
8821 E BOONE AVE SPOKANE WA 99212 N
~Site Address
8821 E BOONE AVE SPOKANE
IT 1
_
.
Legal Description
HUTCHINSONS ADD PT OF 1-9-10 B7 E14.31FT EXC N127.85FT
L9&10
J
Exc
N127.85FT
,
%
,
- - ne -r---
_
~
~
~
I
-
- r B~__ - "
I ~ 4
Notice: This is nol a legal document. Data depicted on this map is general & subject to constant revision. It is intended '
for reference use only. Legal documents should be obtained from the appropriate agency.
10 i 1
~ ~ ~ ~ ' ~ • ~ ,1
N'f0
r "ti N y ~
t~ i.1 ~ ~r
. •
« + ~ f ~ ~ ~ . ~ ~
~ • ~ ~
Z ~
, ,.t:: r J~ - c~ ' S
. . 1 ~
- ~'t-7i ij r ,
4 ~
~ j ~10 6 7 A 9 ` oC
~ : ~ ~ ' 8 : : ~ ~ ~ ~0
ri ' l3~ ' z„ i ~ N ~ ~ ~ ' ~ ~ ` y ,
~ ; , • I rr
_ ~ r ~ •
~ ODN L"'
~ "f •j ' - ~ :,s..~~ ~ Z'~. ~
~ f~: I . " • ' ti "
~ j Q T • N ~ „ E►aa -
.
• ^-at . ` ~ 6
f0' y ~ .
i ~ ~ •
0 ~ " i ,
91 0.5 AN
I ,~r ~ ♦ ~ X
0
d.9
~ ~ d~, ~ r ;v o~0
, ~ , ~ p
A ,yYh~'E
' { ■(Ij~
j ~
~ ~ ~ ~ c,,, ~►,~.~p o `
•
. ~ 1 ,
, • ~t
N 12
1 k - " ~
~ _...e
.
~ , • ' • ~ t+i' ~ { • v,8, ~ ~l77-V~~^ ~ •
~l•1„ t~.•~ ~ F ~ -rRy 4~ Z , ~
• - . P ~ ~ ~ ~ i k+t d~ 1~'~ • ^ ~
`t
~ ~ ~ ~y►~`r • ~
. ~ , , • ~ ,
►ro C ' ~ ~
r+fR'~IMr r_. . . ~ ~
, .
; . F- ~x
rdgLp%~+ ~ • j ~ , lp ~S
~ 7,~,,~ ~ ~ ~ ~ ~~'fi ~ ' j ' ~ ~.,c • ~ ~ : -
~ ~ ~ r, . ~ ~ R~ ~ , j, '
~
~
• s ' ~
/ ' ' s~i ~ ~y1~ ~ rt..
t . :
r
: . rt ~ ' 11•.~s~ ~M ,~2 , x ` ~
„
' ' .a ~e 4` I tt . 8 ti', ~ , ~ ~ ~ ~ . • . ..ti Y ~ F .
ti K 1 ~ ' - ; ~ i . t ` `
t_ , F ~ ~ \r. I ~ : . ~ Y i o
.
~ W4.: • ~ . , ~ ~ ~ l ' _ ~c~ e..., ~ .
.
,
~ G ~ ' ~ ~f` ~'~j ~ ~
.~i{ ~ - . • ~ • 't. ~ ~ -
K
~ ?';tT ~ ~ ~ ~ ~ y . ~ ~ ~ ~ ~ ~ •
. , c.. .
~ ~ • . ' ~ - r ' . . " ',.7/+ !~t : - ~ • IN . y~ ~
~ ` i ~ ~ ' ~ ~ 9~ur1., r'4. '1 • ~1V. • ~
•r~ • E~ ~ ~a' ~ w . ~ ~ ~ ~ f,~a
T ! d
~ ' i/ 1'1 ~ . ~ • ~ ~ ~t r r r. ~ ~ ~ v ~ ~
d~.~
,.~,..~~.~r + f • t - ! t~~ t.~•~. 'N x'~~~
L i
1~YI1Mk
~w
.
.
. ~ ~
i
~
~ ~ 3 .r. . ` • , - ~ ~ ~ ' ~ ..Y.
~ ~~~Y.,...• ~"f ~ : ~ . . . ~ ~ f
l. ~
„ , , ~ . ~ ~ ~
' i. .r •S ~ ~ ,
e
j.
4 ~f
~
~ ,
~
~ t
..j : , ~ ~~t ► ± ' ~
-
_ . ~ i .
~ ~~a. . ~ ' _ :
. ~ ' . . ~ - ~ r;;~,;... . i ~ ••t . ~r ~ ~ : w ~w~ur.- . 1
~ . • . . . ~ ~l~ t. ~ .
,
. f . t ~ - 3 • ♦ . . ~ ~a {I.e~
'i ~ a ~ ~~i ~ : a - ~ ~ a .;.~.s•:..:.'.
M ~ ~ t ~ ~ ~ • ~ ~ . ~ . ~ *t _ t'"' .i ~ ~ ~ ~ ~ ~ " .r ~ -
. . , . ,
11F# °3""`f' ~ tAP
:
; . ~ . : ~
~
iQ
~ . ' ~ ^ . C~ ~ • ~ . ~ ~ _...t _ ;
1'r„jcct i:atu, arti~c ENGINEER'S REViENN' SHEE",
15 E3uilt Plans Ftcccivc:d Short Plats File SP-1308 -02
Itoad Ylans :1},pruN cJ C'ompaniun Filcs
\c~ti Road ti~ankia:d. ',-1 M% la:
Kelated T'ilcs:
liearin~: [3uilding. [)rpt:
l echnical Review
' Harvard RtI Plan Eng Special Fce:
Preliminary Revir%%: 06,14'2002 fype: Schrduled Fut
i I.argc Lut 131dg. Syuarr Feet
I_)ate KecciVctj: Uj.'i f '_'ll(I?
Nu. Luts: 2 No. ,Acres: 0.58
}'roject \ame UR-3.5 SINGI.E IZFS
te :~~fdi-css V RUC)til`. W 11:\RG11-RIT1;. I. S.altGl:h T. s. 5IN 1'0,
Applicant ('onditions h'taileJ Flood "/_one Vo Yhonc I)ist Vwest Sch(iol [)ist 363
Firc nist Ol Rangc-'I'on-nship-Seclion: 44 -25 - 18 PANCEI.(S): (1irst20)
ff{c)M:1S UEAN& H()tiKlvS ly(' 1'l'atcrSuurcc PL.blic 45I8I.0318
L. ?nJ r1v Sr%~er Suurcr Pt.hlic
til'OKAVL. WA 99202
Phune (509) 622-2888
f'ax (;04)) 622_2ti,89
Eng Billing
('atri,:tl. L & Nlrii~oa ,1 I;arrla%
102S L l)\crblulTIZd C1isncr
I'a;rictk L 5: Mclisaa 2% L3arclay ('ompam- Survcyor f'iitw.r i;(;q) Q24-Wn:il) (20X~ 77__14I{l21 F. O~crblufTlZci Tf1UMA5 UL•'A1 & ffO~KItiti [Vi'
303 F. ?nd A~
til'OKANF:, WiV 99203- SP(7K:1N1', VdA 99202
tiigttcLi Nattir: 1'hun~ (509) 924-6000 (20S) 7 73-74221 Phanc (5 09) 622 -?8'.-, N'
I'A 1'ILI('K L B;1RC'f ,1ti' Fax (S09) 022-2~~9
13uilding, 477-367> I'lani~in~-11~- ~'w~ l•n~~inrrr •1"-?hflii C'unlact BiP C:ontacl En-,
Datc Submittcd Dcscription Initials
(-ne Ncetj 1 cchnicalk ('o:nplctc f n~~ Nrr(i Harvard Rd i'vliti_atic,n
Lng Nced Urainagc Plans Eng Nccd 'I'raffic Analysis Cng Nccd Othcr
05 24i2002 fng Agrec Pay Fees ltecei%ed C 9\ Eng I'inal Plat fcas Completed
Cupy tu Accuuntin-
Eng :1gnc Priority Fees }teced ~ tl472 I:ng I'rclim k'lat k-ecs Cumplrtccl
Notice to Public / Vutire tu 1'ublic :1 1 - -3 -4 0 ('omrletcd - or heeds tk) ht: .i:,nrd -
I )r,wn f)eviation [)atc: fn-c )ut 1
I ! l l I i ' '
/ f J tsond quantics tor
drainagc itcm ca]culateJ
I learirg [)atc llccisiun App - L)en ('ond Applei !3CU
AppcalrJ to H('(' Urcision .App Uen CunJ Appld Cc,u11
AppealcJ tu Court I)ecision .App [)cn CunJ Appld
StarnpcJ ~tilylar, tu Serrrtary (San~ly)
tita►npcJ 208 Lut I'laiis tu 5ecretarv ( Sandy)
A
~ -~-cl 2 C
KL - ~ ~
/
V?S ~ v ~~~~l ff l✓C'_QL~ Dc 1- Cc;~AKP~.?1t C~ n/ -"F 1.~,' A~P , P
- _ ~
PLAT NAME. -NO.
STATISTICS DA1'E
-Ptai. Checkfee N) - - - - 449
~
Number,of Lots
i - - - - ' '
Road Miles. (New) N_
.
Total Area _ a S ~cR~
MAP
`Nortli'Arrow'
Scale ~ eC~t~
Ixgend
Procedures & Equipment v
8asis of Bearings.
~ - ~
Plat, Locatioa By Tide
Official.Signatuie Blocl:s'-- ,xk:!ffc_* e -
.Swveyor's Certificate ~
; _
. Road Names
Road Widths
._Adjacent Area
_
Lot &,Block-Numbers
R1W 'Dedication , C~
aesi~ai~a- ~
t Foot Svip"s t ,
.3 APS on GLO 'Corners. - -'Tract X ,r~
Iot Areas ~(?AeT M ~ ~ _T_12-/'C.T [S
_ • ~
Bench' Mark
Closure
DEDICEITION
Description, (To Map)
; Description (To~ Cen)
_ - „
I ~ .
:
Owners A•c-kC~ (1,,~0'~(-P ~ t,Tl ~L 5 ~
Ceccii`icate to Plat 7
.
I Foot Strips
RID - CPR Statement r
Access..Frofiibited
R7W" Dedication
Drainage -L,anguage
_
Driinage Cbvenant
~ . ~
-Flood_ [nsurance
- -
208 ,Boa&- $1,000.00 ea 208 PLANS:'APPROVED
Priv,ate Road Doc.. # ',s .
Private Road Waming
Roacl; Plans
Road 'Bond Improvement,
Road Bond_InsPection
/UI
_ , -
SigaediBy Engincer C,/C)2~~
- ~ ) c~~ ~ f ~ 7 ~
~
klti1t1p1ut1is1.ek4J00
s
S P A K A N E C O U N T Y
A DIVISICaN QFTHE P'IaBLIC WORKS DII'AR'iMEDVT
DIVISlO\ OF FLAd`N1NG
MEMORANDUM
TO: Spokane County Assessor's 4ffice; Aadrea Sandvik
Spokane County Engineers, Scott Engelhard, c/o Sandy Kimball
FROM: Jody Fisher
For David Jensen, Associate Planner
DATE: August 22, 2402
SUBJECT: Proposed Final Short Plat - SP-1308-02.
Attached is a copy of the Plat Certificate for the above-referenced proposed final Elat.
Review and forward any comments you may have by September 4, 2Q02. If you ave
any questions you may ca11477-7237.
Thank you.
Attachment: Plat Certificate
MAI1.5WP PWK-1 • 1116 W. BROADWAY AYENUE • SPOKAAJE, WASI°IINGTON 99260-0220
PHONE: (509) 477-7200 o FAX: (509) 477-2243 9 TDD: (549) 477•7133
IN
.
.
GUAR.ANTEE
GUARANTEE NUMBER
30'+-103103
Labdity = 1, 000 . 00
,
Fee S 150.00
SUBJECT TO THE EXCLUSIONS FROM COVERAGE, THE LIMITS OF LIABILITY AND OTHER PRbVISIONS OF
THE C4NDITTONS AND S'I'IPULATTONS HERETO A,NNEXED AND MADE A PART OF THIS GUARANTEE, AND
SUBJECT TO THE FURTFER EXCLUSION AND LMTATIQN THAT NO GUARANTEE IS GIVEN NOR LIABILITY
ASSUMED WITH RESPECT TO THE IDEN7TTY OF ANY PARTY NAMED OR ItEFERRED TO IlV SCHEDULE A
OR WITH RESP'ECT TO THE VAI.IDITY, LEGAL EFFECT OR PRIORTTY OF ANY MATTER SHOWN THEREiN,
Commonwealth.
Land Title Insurance Company
a corporation, herein called the Company
GUARANTEES
the Assured named in Schedule A against actual monetary loss or damage not exceeding tbe liability amount stated
in Schedule A which the Assured shall sustain by reason of any incorrectness in the assurances set forth in Schedule A.
Dated: Ju ly 30, 2002 at 8: 00 a. m.
COMMONV1aEALTH I,AND TITLE INSURANCE COMPANY
Countersigned
` By• ✓
Pcesident
, Attcst:
, .
BY j
ut rized Offic r Agent Seccetary
loD Lynch
CLTA Guarantee Face Page (Rev. 6-6-92)
Fornn 1025
nnn....
,
SUBDIVISION GUARANTEE
SCHEDULE A
Office File Number Amount of Insurance
104475 $1 t000.00
Reference Number Premium
Policy Number Date of Policy $150.00
304•103703 July 30, 2002 at 8:00 a.m. Tax
$12.15
Total
$162.15
Name of Assured:
PATRICK L. BARCLAY and MELISSA A. BARCLAY, husband and wife
The assurances referred to on the face page are:
That, accordfng to those public records which, under the recording laws. lmpart constructive notice of matters
reiative to the foliowing described real property:
See Exhibit A attached hereto and made a part hereof.
Tide to said reai property is vested in:
PATRICK L. BARCLAY and MELISSA A. BARCLAY, husband and wife
Subject to the matters shcwn below under Exceptions, which Exceptions are not necessarily shown in the
order of their priority.
EXCEPTIONS:
1. Taxes or assessments which are not shown as existing liens by the records uf any tax+ng authority that levies
taxes or assessments on real property or by the pub{ic records.
2. Unpatented mining cfaims, reservations or exceptions in the United States Patents or in Acts authorizing the
issuance thereof; water righis, ciaims or title to water.
3. Title to any property beyond the lines of the real property expressly described herein, or title to streets, roads,
avenues, lanes, ways or waterways on which such real property abuts, or the right to maintain therein vaults,
tunnels, ramps, or any other structure or improvemenh or any rights or easements therein unless such
property, rights or easements are expressly and specificaiiy set forth in said description.
Subdivislon Guarantee Page 1
, • / _
ExhibitA
'Title Order No:: 104475
The`East,14.311eet.of, Lot.9, EXCEPT"the North 92T:85.feettthereof; and,,Lot:10, EXCEPT
4he; Nortft 127.85 'feef-thereof, Block 7jiUTCHINSON'S ADDITION, as pet-.plat recorded1n
Yolume "Q" of Plats, page 4, records~of Spokane. County;
tSituate-in:the County of Spokane, State of Washingfon.
. • (
' .
SCHEDUI;t A fContinued)
File4Number: 104472 Policy Number: 304-103703
Additiotial , Exceptions:
14. AGREEMENT, including,the terms, and conditions thereof; '
Between: Hutchinson Electric: Water Company, _a corporatfon
And: R.A.,, Hlutchinson andVarguerite *Hutchinson, his -wife and
W.H. Hutchinson
And:. Tlie Hutchinson Irrigation A Land Company, a corporation
Recorded: September-15, 1909
Recording No.: 252472- Recarde4 in:- Book "J"~of,Contracts,.page.618:
For:. Rights of wayL,to, lay. and maintain a system, of ditches,
pipelines and fiumes~for the-furnishings ofwater
COVENANTST COiVD1YiONS AND'RESTRICTIONS•contained-in°instrument;
. Recorded: January 14,"'i 915
`Recording'No.:. 450790
' Executed -tiy: The Hutchinson' Irrigation & Land' Company; azorporation
Asfollows:
"That-no- building erected on said land shall-be_used'for saloon purposes or for:the sale.of intozicating
liquor."- _
_
1. :EASENIENT, inciuding, the_ terms, covenan _ nd pro~ sions-thereof, as granted by instirument; ,
.Rec.orded:-~ ~ May 24,, ZO 20 •
Rec.ordtng No.: 473111,7
~For: Maintenance: of and, for,~an under8round;~sewer, line
.Affects: Tlie'Southerl'y-25 feet of the Easterly 20-feet.of.said premjs
Subdivisioo 'Guarantee Page 2
~ r
.S . ~
--r ~ ~ ~ . 3 • • ~o ~ ~ ~
~ ~S ~ ~ - ` ~ , ° t 1
_ _l-
~ ~ ~ . : N „ -e ~
A ~
~ - ~ 1. e e~ 3 ~
- . 4 ~ 1 M*:' ~ , ~ ~ ~ ~.~1 s ~
t q~ ~ . ~ .
• v
_ ..~'1 ; ~ ~ • 7 ~ .5' RE
►1 ,
(D ~ 1 ~ . ` • ' '
j
~ • ~ ~ L~• r . t r ' ~ ~ 1 1~ ~C • .°t 9 0 , _ . - ~+1 w
~ r ~ t+ •ty ~ : . - - - , ~r E ~rE s '
: d + • ~ a ~ ~ . - ~ J p4 ~t.3J .~s . -J~-, ~~~p K . - .
~i ~j~.:,. . . • . v . , ' --ti - _ a
' ' • . ~ •
~ t' ' t , ~ " ~ . • .~43
Lj 43~ ~z
S . ~ ~ ~1Z,Q 43. : 16.:s~,' v 2~
f~~+~, , • ~ .3
1 , 4I . ~ a" ~ . • ) . ~ . . ~ • /f~~,~
~ T ` • .1~'~ , ~1 ~ ~ ~ ~ . . ~ ~.I •
43 ~ I ~ • . ~ ~ : , -
s.~ s
~ ' •
Q ~
:y
~ •S • ~ ~ ~ vt
3 • . . . ~ Q~,.. . ~ ~ . •
706 r . . t'.,,1 ' • ~ ~ , +1 ` . ~f ' . - ~ ~ .
rl 1~1' ,2 ' ~ !11 ~ ~ ~ 1 ~ 1 ~ ~ • • . . .
. s• R :a '°~,l t . .
! ~ ~ e^ ; j ~ ~tr f t ' _ - 'f •
l~ tz, l~ q ~p - ° ~ /~~~~jy
~ ' i ~ ~ , • t~ S.J
/D ~ ~ ~ - r : . ~ ' , q 4 ~ ' °
7t~► ~i ' ~ ' ~ ~ ' . • • ~ 1 t - ~ - ~ ~ . , ~ 1
. R y , ~ 1i o ; ~ 8 ~
;p '~s' ' . , ~ ~ ~ ~ ~ • '
;t:
LIZ4S4
, a ~ • ; - ' . ~ _ ` ~1Z~ , ~ • r
1~9 G' ~ t, ' . ,o. , 1 • 1:
o
L~rr • 1~~ ~z.a ~ • 1 3. .
- ~ . f~ ~ ~ ~ ' •
. ~ ~ a r , ~ ~ ~ ~ ,
► * ~ `.yr~~rs-rr~- ~ ~ Z4.
a ~ ~ % . Q 6
. .
t ^ 2~ • ' ~ ' ' ~ 1 l:`~ ' ~ ' . 1 ' .
4& 1 ,d2t', .3 ~ . ~ ~ r . ~ ~ , f . ~ q(~ ~ r
1 • ~ ~ ' ~ i ~j , ~
+ ~ • ~
! A ' . . ~ ' . ~ ' ` • ~ •
7~ t ~ ~ ~ ~ ~~t
r t . E
+ ~ ~ ~ ~ - "C • ~ ~ ~ ' ' ~I f'+'' ~ typR'~ ~ ~G
TpOSt~Ig
t't
~ ~ ~ • ,,~~'t u ` ,F SEC~T,OL3
i 1
p ~E ~ . .
A o'F'TI`0 a OE
. • ° .
olk
.Y
COUNT
~ .
TITLIE
1 k
~ ~e~ - •~rr~~=` . . , - - r j}llr~:+C? ~~~~-',}r -r~ ' ~
' • _ ~ ~ , ~~S • ~ _ - s.- ~ s~ ~ ~ ' ~
~ y~~ ~ 1 ~ ,
4v.lti=~ ~ta1• -~'a i ~ c~ 1 ~9'~`'.+ .
A '7 E10tfi c} 1 • J ~ ~ d#~
~ y7... .
~~~t~•-~6C~►j~:
iC' • ~1 ~ t r~ ~ •
~ O 4
B4ti
tA t~, xi~ r ~ E - • ~~,`2 ~E3•~~ 1'►• J~'~'~1
,~i, ,~~r' ~ L3 ,S`'33• ~~~b ,~.~,;~N•~`-~~~1..,..
i • t.~ ~ •
a { 1
~ .J . W , • i~ r '~l~by : r
~ n'~ `ZEf • 10 ~ ..~b ~'°,~"~4'~F J j~y• ~~►'t
, • ~ ry~ ~ ` 1.0 • ~(~j~~ ~ ~ w ~ * F e1~• L-
• ~y ~ ~ l 'rYli ~n { ~ ♦
~
• ~a,_ ~ ;
10.0
r~I ~~x~ ~ ~ = ~ ~ 1 ~ 7 ~ • a ~ ~ ~~=~,ssz=
.
g D f . !x # a
~.-~1'~ _ . ~ ~.c' ~~P ~ ~ , ' '~.1.
_ . •3`, -~4' ~~;.e~ ' 1
~l ~ 1 ~ ~ r► ~ 5 c~ 1 t • rr.. ~ ~
0:a• 4n owe
a . r ~~.~~...w""r . . . . ~i ~ ~y~, yr 1 a ~
' ` , ~±~"j~'' y ~ ! ~'~j~"..5~ ~~6.`~"S• ~ ~45
. , • ~ ~ J~~ , 3c, ~~t t g-~t~.'• ~ ~ i.,~j~
9
1 04 ~T rA i ~t ~ ~ ~ ~ ~~4..~ • :y'~~~
~ ~i~ ..J~ • .
et ~
49 , 1z
tr`~'~ Y A~-- g9 ~ + _ . ~~,~~v'~ ~ ~ • ~ 141;
iz
y
i~''~~' ~ _ ~r~,1 . r, ~ ~ 1 . ~ 1 r, ~
j jt ~o,..
~a ~1 ~ ~L• r My~~r►`, yrt~
7 J~1~• ~.r^.~.~% '
~ ' ` y r s
.
~ t's ' c~ ~t r ~j, W ~ : _ i ~y,,.,..: = = ° • y~ .~,y ,
~ ,~r.,iP!• ~.7~~ ~G ,
83
W
~
,r~s . 1 .~.1 ~~3 • - ~ ~
G ~ ~ f' . ,~-r+~
c
~
z
~~4~ v 'J ~Q ~ •
~ .
ta O~ 4 • '"~t' ~j~, _ ~
~ G W ;;~sa• ~J3_ ~ ~i~2'ct+~g ~,i
~ ` w J W t''~G? ~'.1~~ ~ ~ ~ . ' •
45
~ • ~ ~
oii • y ~ ~ f
N go ~..>4 4~~ '
. ~
00 ` ~
ft
~ E _ y J~~='•62 sXi ~OVI.T N
~
w y .r''► ~ •
~
~,r1C►t-~ 4~c 4E, 49
;
80
~~,r~, • ~yit~
bLF`
D13,
yy ~ ~~,1
4;=,P,~3 g~..s.
~ 0+2l~'! I . ~ 4
I~VE.~~~ ~ ~`',~:7~;~►~+ ~,4`;.~
~
~ La! ;,y„~• cc`'~' 914'
~ ■ ~ ~ ov c 8 ~,.~+Q~ ~,1~' ► `~,-^-z
Q t~k, ~try1 1~ a - ~ ~y J ' _ , ~
~,,5~t'1i~ 3ctg• %"cl
ta ,;;4 ~
• ~ 3b
~,12k '
CJ ~ a~~ 1 ~
10 14.0 ..-Az.
5 1? OtD' 0 44(" 6 .
~ 4
~
a&7
~
`~J
• r
ft r
•j ~ s 49 • ~ r~r~~~~
r
1 it k{ • r~ ~ 'T
C3VJat ~~~~~g~' ~j,;}1t►V~ stt1•. 19
aF~fl v ~ RS'~ ~b ~ ~ loo ~ , ~
~u*T(3 14. ~ w 148 :8~. ~4y~
~1 Z~.Q►
1.7 ~ '
PAI E~
INQ N ~4 t 0 ~ g ~t~
W
ay ~J 11 . ~
~
I~V $9 49 - ~RJ
t
R f~"' ~ • ~ ~}g ti"4 ..,.?►`.0000 ~ ~ • 1+
~~~,Z ~ ~ ~9 . l1 hy u
Rfl~~' 4L% • ;GB, ~
~
• ~ 7 14.
0 1~~ ~ 4i.•
~ a ~ ~ W ~ a, `s • - s "'1L,
~ . c
CS d'"J 0 ~F~. ~ L"• j~. 004'`M'"" cj 14.
~ ,
C~A3Rn 0 00.0
-,~A,,a,l~~ 3~-'~ r-.g7
lV ~&c
f t
~''~j 79 ,
~ ~
1c=ar
~_s~'-;"" ~ ~ • ~ ~
N~La~E ~ 3
1~
F~-C "
q j:, t7 ro OZ S
OC'I,E> ~~ty~' .147 ~ ~ L2 0.9s 61
~og-
, •~,~b J,~'' ~r.,~
r_•~~,~~ _ W~ti 4
9
~ CB
t
MI ti
bs m
-~C' a~
~'C~~~`'` ~ 00
,gir., •}'C9 ~...-..-,a=-'""_ M r C~` •9~ ~ tti ~ ~ ' Fa
if~~'~~ M C` QG E8
gt~ 6~ ~ nrtl
~ 0
,?t+~ • - 9r. 1 ~,t3 tf,L-c~ ak
~ Qli1~
~T • r,t~b
~ • $ W } J' ".:''..,rL►
g
7~~`•~£~ •9~~
-+r£8
a,,,~~
bas
~ ~ r "'f " ~
~`~~R~ Q► ~s~=------_
s S
-=r~=~" M ,7j • t t` ~ 0 S nN
•qG L~ 6-'
~ n
L~~ ~ _ - - ~ ~ •
7~ 1
~e ,9`OL~
= - ~
.r, r " r • f'" • ~ ~ t ~ ~ L1
~,Le,~{?ta f~~
~ a • t ~ • S ~ ~(ti~! I 41i~t~
ti~ cj
. g~
~ ~ 'a- ~ ~.'1,~ Cl~la
" ~r.~,~' ,~~ljhr~-,, Q~~
~ ) ~l '~'1 • v~~ -3^('~`'
L.~+,,.,, ~•,,+r r- f3
~ + ~C~ c,~ ~ = =
~9~~~
~,iL~c~ b s •^t~~'~-~~
~c
~ Z L ' ~.=--~r' ~
•~,s~ _l~~--r='-- 3
.,.^,a yT
bL EO L6
L
~o~ 00
_r,-- r^~~~-- ~f.
M ~Z► * S~' ~ ~
- Y Z
• ~ • t~,B ~ ' ~
-'t ~~j'E?L ~~r., {1 ~ hb~ •~~s£ {~r$ 9 ' ~ ~ Q' m
LC'P
~ ~
=
. ~
(0
' b1_E>
t ~~i6~
~0rs^ ~ "t'-~= ao h3
_
aL'Z~,O 0 Z~.~'r M ~
I1 rO ,~5 0 6 6~ L..b~:-
; ~ -3(
L9 9*7 • LEr L
s3e I
,E
Q~!L~~?
a1 Y ~ ~ r G ~~rnt~11~ ` r~~H~,_..r...-'~'c~°'"
~
~ __~~'r~^~~~~ ~ ,3 • . !
OFFICE OF THE COUNTY ENGINEER
SPOKANE COUNTY, WASHINGTON
TO: MITCHELL DURYEA
FROM: DAVE BERTO
DATE: September 4, 2002
SUBJECT: language for SP 1308
The Border Easement as shown hereon are hereby granted to
Spokane County and its authorized agents, and to the public for
road purposes, including but not limited to curbs, sidewalks,
drainage, signage, and other usage deemed necessary by the
Spokane County Engineer for the safety and welfare of the Public.
No fence or portian thereof will be constructed within said
easement without permission of the Spokane County Engineer, nor
will any objects be placed in said easement that would obstruct
the sight distance necessary for safe and efficient vehicular
movement. A.ny other easements granted or dedicated within this
Border Easement area will be subordinate to the rights created by
this easement and are subject to Spokane County Engineers permit
process prior to usage.
. ~
~
BEFORE
THE SPOKANE COUNTY OIVISION OF PLANNING
IN THE MATTER OF SHORT PLAT ) FINDINGS OF FACT,
NO. SP-1308-02 ) CONCLUSIONS AND
APPLICANT: PATRICK BARCLAY ) DECISION
THIS MATTER, an application for short subdivision of land from Patrick & Melissa Barclay has been
received and was decided upon, pursuant to Spokane County Subdivision regulations, on the 5'hday
of July, 2002.
FINDINGS OF FACT AND CONCLUSIONS
1. The individual signing below has further been properly delegated the responsibility for
rendering the decision by the Director of Spokane County Division of Planning.
2. The proposal is to divide approximately 25,131 square feet into two (2) single-family
residential lots for those uses permitted in the existing Urban Residential-3.5 (UR-3.5) zone.
3. The proposal is generally located at the northwest comer of the intersection of Boone Avenue
and Marguerite Road in the NE% of Section 18, Township 25 North, Range 44 E.W.M.,
Spokane County, Washington. Parcel No. 45181.0318.
4. The existing zoning of the property is Urban Residential-3.5 (UR-3.5), which was established
in 1991 and has remained the same through the adoption of the Comprehensive Plan and
imptementation of the Phase I Development regulations. Pursuant to the Revised Code of
Washington (RCV1) 58.17.195, this proposal conforms to the requirements of the existing
Urban Residential-3.5 (UR-3.5) zone.
5. The Spokane County Comprehensive Plan designation, implemented as a result of the
adoption of the Phase I Development Regulations by the Board of County Commissioners on
January 15, 2002, (Resolution #2-0161), is Low Density Residential (LDR). The development
and uses, as proposed and conditioned, are in compliance with the Low Density Residential
(LDR) category.
6. Surrounding uses are primarily single-family residential and currently zoned Urban
Residential-3.5 (UR-3.5).
7. The Spokane County Arterial Road Plan identifies both Boone Avenue and Marguerite Road
as County Local Access Roads. Spokane County Division of Engineering will require the
installation of additional asphait on Boone Avenue and Marguerite Road and dedication of the
applicable radius for the intersection. Therefore, as conditioned, the proposal conforms to the
Arterial Road Plan.
8. The proposed site is located within the Public Transportation 6enefit Area (PTBA).
9. The proposed short plat will be served by Hutchinson Irrigation District No. 16. Wastewater
disposal will be as authorized by the Director of Spokane County Division of Utilities.
11. The required public notice was provided for this proposal and agencies having a potential
interest in the project were notified and recommendations solicited.
12. Three (3) letters of opposition were received from adjoining property owners. Concems cited
in the letters include, potential placement of a manufactured home, property values and
income property vs. owner occupancy.
13. Recognizing the recommended conditions and Spokane County development standards, the
proposed short plat makes appropriate provisions for the public health, safety and general
welfare and that the public use and interest will be served by platting the subdivision.
~
The subdivision proposal is generally consistent with RCW 58.17 and the County subdivision
regulations, promoting the public health, safety and general welfare in accordance with
standards established by the State and Spokane County. The County Division of Planning
has considered the provision of adequate public facilities as cited in RCW 58.17.110 (2).
More spec'rfically:
a. open spaces f. sanitary waste disposal
b. drainage ways g. parks and recreation facilities
c. public and/or private right-of-ways h. playgrounds
d. transit i. schools and school grounds
e. potable water j. sidewalks
14. The preliminary short plat lies inside the Aquifer Sensitive Area (ASA) Overlay Zone
and the Priority Sewer Service Area (PSSA). ASA Overlay Zone standards for
residential development activities, as defined in Section 14.706.100 of the Spokane
County Zoning Code, shall apply to the proposed residential development of the site.
15. The project site is located inside the Urban Growth Area (UGA) boundary,
established by Board of County Commissioners' Resolution No. 2-0037 in response
to RCW 36.70A, the Growth Management Act.
16. The subject property is located within the 30,000 foot Conical area for Felts Field.
17. The project is exempt from environmental review under the State Environmental Policy Act
pursuant to WAC 197-11-800(6)(a).
DECISION
Based upon the above noted Findings of Fact and Conclusions, Short Plat Application SP-1308-02 is
hereby APPROVED for five (5) years, specifically to July 5`", 2007 and subject to conditions noted
below. This decision is final unless appealed in writing consistent with adopted appeal procedures.
CONDITIONS OF APPROVAL
All the below conditions imposed shall be binding on the "Applicant," which term shall include the
owner or owners of the property, heirs, assigns and successors.
SPOKANE COUNTY DIVISION OF PLANNING
1. The proposal shall comply with the Urban Residential-3.5 (UR-3.5) zone and other applicable
Zoning Code chapters, as amended.
2. The final short plat shall be designed substantially in conformance with the preliminary plat of
record. No increase of density or number of tracts shall occur without a change of condition or
subdivision application submittal and approval.
3. The preliminary short plat is given conditional approval for five (5) years, speciflcally to July 5,
2007. The applicant may submit an extension of time application at least thirty (30) days
prior to the above expiration date, but no later than June 5, 2007. Application(s) for
extension of time shall be processed under the provisions of Chapter 12.100.118 (Extension
of Time) of the Spokane County Subdivision Ordinance, as amended.
4. Prior to filing the final short plat, the applicant shall submit to the County Division of Planning
Director/designee for review any proposed final short plats to ensure compliance with these
Findings and Conditions of Approval.
Findings and Decision SP-1308-02 2
~
5. A sunrey is required of the subject property prior to filing the final short piat.
6. Appropriate road names and street addresses shall be indicated on the final short plat map.
7. Appropriate utility easements shall be indicated on the final short plat map. Approval of utility
easements by utility companies must be received prior to filing the final short plat.
8. The dedicabon shall contain the following statement:
"Setbacks shall be determined at the time building permits are requested unless these
setbacks are specifically drafted on this final short plat. The setbacks indicated on this
subdivision may be vaned from if proper zoning or variance approvals are obtained."
9. Four (4) current Certificates of Title shall be furnished to the County Division of Planning prior
to filing the final short ptat.
10. A filed Avigation Easement satisfactory to the Spokane Intemational Airport Board shall be
provided prior to frling of the final plat.
SPOKANE COUNTY DIVISION OF ENGINEERING AND ROADS
1. Conditional approval of the plat by the County Engineer is given subject to dedication of right-
of-way and approval of the road system as indicated in the preliminary plat of record.
2. No construction work is to be performed within the existing or proposed public right-of-way
until plans have been accepted by the County Engineer and a permit has been issued by the
County Engineer. All work is subject to inspection and approval by the County Engineer.
3. Approach Permits are required for any access to the Spokane County road system.
4. Dedication of the applicable radius on Marguerite Road and Boone Avenue is required.
5. The applicant shall grant applicable border easements adjacent to Spokane County Right of
Way per Spokane County Standards.
6. To construct the road improvements stated herein, the applicant may, with the approval of the
County Engineer, join in and be a willing participant in any petition or resolution which
purposes is the formation of a Road Improvement District (R1D) for said improvements
pursuant to RCW 36.88, as amended. At such time as an RID is created or any Road
Improvement Project is sanctioned by Spokane County, the improvements required (curb,
sidewalk, drainage control and paving to existing pavement) wiil be at the sole expense of the
undersigned owner, their heirs, grantees and assigns. This provision is applicable to Boone
Avenue and Marguerite Road.
7. As an altemative method of constructing the road improvement stated herein, the applicant
may, with the approval of the County Engineer, accomplish the road improvements stated
herein by joining and participating in a County Road Project (CRP) to the extent of the
required road improvement. At such time as an RID is created or any Road Improvement
Project is sanctioned by Spokane County, the improvements requfred (curb, sidewalk,
dramage control and paving to existing pavement) will be at the sole expense of the
undersigned owner, their heirs, grantees and assigns. This provision is applicable to Boone
Avenue and Marguerite Road.
8. The following statements shall be placed in the dedicatory language of the final plat:
The property owners within this plat shall be held responsible for keeping open and
maintaining the surface path of natural or man-made drainage flow over and across their
respective properties. If the property owner(s) fails to maintain the surface path of natural
or man-made drainage flow, or the drainage swale, a notice of such failure may be given
to the property owner(s). If not corrected within the pedod indicated on said notice,
Spokane County has the right to coRect the maintenance failure, or have ii corrected, at
the expense of the property owner.
Findings and Decision SP-1308-02 3
~
There may exist properties, located uphill and adjacent to this subdivision, which
periodicaliy discharge stormwater runoff onto indNidual lots within this plat. Runoff from
nearby uphill properties should be expected, and during snowmelt periods or wet seasons
the Iots may be subjected to higher amounts of stormwater runoff that what is normally
obsenred or anticipated. Because stormwater runoff from adjacent ri roperties have
discharged onto this plat prior to development, stormwater runoff wilikely continue to do
so after development. It is the responsibility of the individual lot owners to maintain
existing surtace paths of runoff through their respective lots and to grade the lots in
accordance wfth applicable rules and regulations, so as to prevent property damage.
Any building that is constructed on a lot in this plat shall be set at such an elevation so as
to provide positive drainage away from any drainage entry point to the building (including
but not limfted to a window well, a window unprotected by a window well, or a doorway).
Said positive drainage shall consist of a minimum slope of 3% away from #he building for a
distance of at least 10 feet from the building. The lots shall be graded so that either a) all
runoff is routed away from the building, and conveyed over the lot to a naturat drainage
swale or approved drainage facility, or b) drainage intercepted on the lot is disposed of on
the lot in an approved drainage facility. The approved drainage facility shall be
constn.icted in accordance with any applicable accepted plans on file at the County
Engineer's Offlce. 8Wice revisions to the accepted drainage plans must be accepted by the
County Engineers prior to construction of said revisions.
Spokane County does not accept the responsibility of maintaining the drainage course on
private lots or floodplain areas within private lots, nor the responsibility for any damage
whatsoever, including, but not limited to, inverse condemnation to any properties due to
deficient construction and/or maintenance of drainage courses in drainage easements on
private property.
The owner(s) or successor(s) in interest agree to join in any County-approved stormwater
management program and to pay such rates and charges as may be fixed through public
hearings for service or benefit obtained by the planning, design, constructing, maintaining
or operation of stormwater control facilities.
This short plat is located within the Aquifer Sensitive Area (ASA). Treatment of storm
runoff from driveways shall be provided. The preferred method of treatment is to have the
runoff from driveways sheet flow over lawn turf or native-type grasses. If a ditch is to be
used to collect runoff from driveways, then the ditch is to be grass-lined.
That in consideration of Mutual Benefits now or to be hereafter derived, do for themselves,
their heirs, grantees, assigns and successor(s) in interest hereby request and authorize
Spokane County to include the above described property in a Road Improvement District
(RID) and to support the formation of a Road Improvement District for improvement of the
road(s) described below by requesting and authorizing Spokane County to place their
name(s) on a petition for the formation of a Road Improvement District pursuant to RCW
36.88.050, or by requesting and authorizing Spokane County to cast their ballot in favor of
a RID being formed under the resolution method pursuant to RCW 36.88.030, and/or by
not filing a protest against the formation of a RID being formed under the altemative
resolution method provided for in RCW 36.88.065 and Chapter 35.43 RCW.
Findings and Decision SP-1308-02 4
if a RID is proposed for improvement of the road(s) described below, said owner(s) and
successor(s)further agree: (1) that the improvements or construction contemplated within
• the proposed RID are feasibte and (2) that the benefits to be derived from the formation of
the RID by the property included therein, together with the amount of any County
participation, exceeds the cost and expense of formation of the RID, and (3) that the
grgperty within the proposed RID is sufficiently developed; provided, themselves, their
eirs, grantees, assigns and successor(s) shall retain the right, as authorized under RCW
36.88.090, to object to any assessment(s) on the property as a result of the improvements
called for in conjunction with the fonnation of a RID by either the petition or resolution
method under Chapter 36.88 RCW and to appeal to the Superior Court the decision of the
Board of County Commissioners confirming the final assessment roll; provided further, it is
recognized that actual assessments may vary from assessment estimate so long as they
do not exceed a figure equal to the increased true and fair value improvement(s) add(s) to
the property.
It is further acknowledged and agreed that at such time as a RID is created or any County
Road Improvement project is authorized by Spokane County, the improvements required
shall be at the sole expense of the owner(s) of property within the RID or served by the
improvements without any monetary participation by Spokane County.
The RID waiver contained in this agreement shall expire after ten (10) years from the date
of execution below. This provision is applicable to Boone Avenue and Marguerite Road.
1. The County Engineer has designated a Local Access Roadway Section for the improvement
of Boone Avenue which is adjacent to the proposed development. This will require the
installation of 3-5 feet of asphalt. The construction of curbing and sidewalk is also required.
2. The County Engineer has designated a Local Access Roadway Section for the improvement
of Marguerite Road which is adjacent to the proposed development. This will require the
addition of approximately 3-5 feet of asphalt aiong the frontage of the development. The
construction of curbing and sidewalk is also required.
3. The proposed plat shall be improved to the standards set forth in Spokane County Board of
Commissioners Resolution No. 1-0298, as amended, which establishes regulations for roads,
approaches, drainage and fees in new construction.
4. The County Engineer has examined this development proposal and has determined that the
impact of this proposal upon the existing County Road System warrants the dedication of
additional right of way and the roadway improvements herein specified.
5. uThe applicant is advised that there may exist utilities either underground or overhead
effecting the applicant's property, including property to be dedicated or set aside future
acquisjtion. Spokane County will assume no financial obtigation for adjustments or relocation
regarding these utilities." "The applicant should contact the applicable utilities regarding
responsibility for adjustment or relocation costs and to make arrangements for any necessary
work."
6. The Spokane County Engineer has reviewed this project for transportation concurrency and
determined that it is exempt under the Phase I Development Regulations - Section IV (B)
(2c).
Findings and Decision SP-1308-02 5
SPOKANE COUNTY DIVISION OF UTILiTIES
1. Side sewer easement with a width acceptable to the Division of Utilfties shall be shown on the
face of the plet as "Sewer and Utilities Easement".
2. As per the Spokane County Zoning Code Phase One Development Regulations the dedication
shall state: .
Public sewers shall be constructed to provide for the connection of each parcel to the
County's system of sewerage. Uses on properties within the project shail be required to
connect to the sewer and pay appiicable charges per the County Sewer Ordinance.
Sewer connection permits shall be required.
3. Applicant shall submit expressly to Spokane County Division of Utilities "under separate
cover', only those plan sheets showing sewer plans and specifications for the public sewer
connections and facilities for review and approval. Commercial developments shall submit
historical and or estimated water usage as part of the sewer plan submittal.
4. Sewer Qlans acceptable to the Division of Utilities shall be submitted prior to the finalization of
the project.
5. Any water service for this project shall be provided in accordance with the Coordinated Water
System Plan for Spokane County, as amended.
SPOKANE COUNTY DIVISION OF BUILDING AND CODE ENFORCEMENT
1. The applicant should contact the Division of Building and Code Enforcement at the earliest
possible stage in order to be informed of code requirements administered/enforced as
authorized by the State Building Code Act. Design/development concems include addressing,
fire apparatus access roads, fire hydrant flow, approved water systems, building accessibility,
construction type, occupancy classification, existing exterior wall protection and energy code
requirements.
2. Prior to the issuance of the initial building permit(s), the applicant shall submit to the Division
of 6uilding and Code Enforcement documentation signed by the water purveyor and the
applicable fire district stating that the public water system has been installed, tested and
accepted as operational pursuant to the approved water plan.
SPOKANE REGIONAL HEALTH OISTRICT
1. The final plat shall be designed as indicated on the preliminary plat of record and/or any
attached sheets as noted.
2. Appropriate utility easements shall be indicated on copies of the preliminary plat of record for
distribution by the Planning Department to the utility companies, Spokane County Engineer,
and the Spokane Regional Health District. Written approval of the easements by the utility
companies shall be received prior to the submittal of the final plat.
3. Sewage disposal method shall be as authorized by the Director of Utilities, Spokane County.
4. Water service shall be coordinated through the Director of Utilities, Spokane County.
5. Water service shall be by an existing public water supply when approved by the Regional
Engineer (Spokane), State Department of Health.
6. Prior to filing the final plat, the sponsor shall demonstrate to the satisfaction of the Spokane
Regional Health District that an adequate and potable water supply is available to each tract of
the plat.
7. Prior to filing the final plat, the sponsor shall present evidence that the plat lies within the
recorded service area of the water system proposed to serve the plat.
Findings and Decision SP-1308-02 6
!
8. A public sewer system wili be made available for the plat and individual service will be
provided to each tract prior to sale. Use of individual on-site sewage disposal systems shall
not be authorized.
9. A statement shall be placed in the dedication to the effect that:
"A public sewer system will be made available for the project and individual service will be
provided to each tact prior to sale. Use of individual on-site sewage disposal systems
shall not be authoriaed."
10. The dedicatory language on the plat shall state:
"Use of private wells and water systems is prohibited."
11. The final ptat dedication shall contain the following statement:
"The public water system, pursuant to the Water Plan approved by county and state health
authorities, the local fire protection district, County Building and Safety Department and
water purveyor, shall be installed within this subdivision and the appficant shall provide for
individual domestic water service as well as fire protection to each tract prior to sale of
each tract and prior to issuance of a building permit for each tract."
Approved this 51 day of July, 2002.
. •
eanna Walter
Assocaate Planner
Under State Law and County Ordinance, you have the right to appeal this decision to the
Spokane County Hearing Examiner. If you desire to file an appeat, you must submit the
appropriate Appeal Apptication together with the required Fee, payable to the Spokane County
Division of Planning, within fourteen (14) calendar days from the date this decision is signed.
Upon receipt of a complete appeal application, a public hearing will be scheduled.
If you have any questions, ptease call the Division of Planning at 477-7200.
c: Spokane County Division of Engineering and Roads, Traffic Circulation
Spokane County Dwision of Engineering and Roads, Development Services
Spokane County Division of Utilities/Information management
Spokane County Division of Utilities/Stormwater utility
Spokane County Division of Building and Code Enforcement
Spokane Counry Assessor's Office
Spokane Regional Health District
Spokane County Fire Protection District No. 1
West Valley School District No. 363
Hutchinson Inigation District No. 16
Patrick & Melissa Barclay, Owners
Thomas, Dean & Hoskins, Surveyor
Parties of Record
Findings and Decision SP-1308-02 7
Page 5., Engineers
06'/14%2002 ` . .
i•308
` o; e . y, .e,, _ o
• • , o gi . e; i-on
D ' ,e o o n o . _ r ,a,
Ovw-Z
0 . .
. . d
,11 •O . . .0~,0 t
094 .00 . 09., .
M.e, 0
To: .:Spokane County Division -of Pianning
Planner: David Jensen, Associate PI anner
From: Greg Baldwin
- -
Zubject: :SP-1-30,8-02 ~
Applicant: Thomas Dean & Hoskins, INC.
,Date: September:23,2002-
RE: 'Watec'LiriefAccess,,:fcom.Margue6te~*fathevtti9n Boone
'We:' have reviewe.d tii;e above- re.ferenced proposal and 'have 'ho cornments to make concerning,the
modification:
OFFICE OF THE SPOK:.ANE COUNfiY ENGINEER
PW'K-2
1026 W Broadway Ave (Lneation)
~ 1116 W I3roadway (Mail)
Spokane, WA 99260-0170
SlCc~t,~'r1 (509) 477-3600 Fax (509) 477-2243
"ENGINEER'S CQNDITIONS OF APPROVAL" SHORT PLATS
TO: Spokane County Division of Planning
FROM: Division of Engineering & Roads i' -DATE: June 12, 2002
~
PROJECT: UR-3.5 SINGLE RES
FtLE SP-1308-02
Review Date: 06/14/2002
Planner: DEANNA WALTER
Hearing Date
Sponsor/Appiicant: THOMAS DEAN & HOSKINS INC
Section Township Range: 18-25-44
Technical Review Date: ( @ )
The Spokane County Division of Engineering and Roads has reviewed the above referenced
application. The fol(owing "Conditions of Approval" are submitted to the Spokane County Division of
Planning for inclusion in the "Findings of Fact, Conclusions and Order/Decision" should the request be
approved.
1. Conditional approval of the plat by the County Engineer is given subject to dedication of right-of-
way and approval of the road system as indicated in the preliminary plat of record.
2. No construction work is to be performed within the existing or proposed public right-of-way until
plans have been accepted by the County Engineer and a permit has been issued by the County
Engineer. All work is subject to inspection and approval by the County Engineer.
3. Approach Permits are required for any access to the Spokane County road system.
4. Dedication of the applicable radius on Marguerite Road and Boone Avenue is required.
5. The applicant sha11 grant applicable border easements adjacent to Spokane County Right of
Way per Spokane County Standards.
6. To construct the road improvements stated herein, the applicant may, with the approval of the
County Engineer, join in and be a willing participant in any petition or resolution which purposes
is the formation of a Road Improvement District (RID) for said improvements pursuant to RCW
36.88, as amended. At such time as an RID is created or any Road Improvement Project is
sanctioned by Spokane County, the improvements required (curb, sidewalk, drainage control
and paving to existing pavement) will be at the sole expense of the undersigned owner, their
CC: Appl3csnt '"N0I4AS I:FA.'J b HQaKIP1S .NG
EngineeriSurveyor
Alanner DERNNA wAL'TER
Page 2 Enqineers
06/1412QQt
1308
heirs, grantees and assigns. This provision is appiicabie to Boone Avenue and Marguerite
Road.
7. As an alternative method of constructing the road improvement stated herein, the applicant
may, with the approval of the County Engineer, accomplish the road improvements stated
herein by joining and participating in a County Road Project (CRP) to the extent of the required
road improvement. At such time as an RID is created or any Road Improvement Project is
sanctioned by Spokane County, the impravements required (curb, sidewalk, drainage control
and paving to existing pavement) will be at the sole expense of the undersigned owner, their
heirs, grantees and assigns. This provision is applicable to Boone Avenue and Marguerite
Road.
8. The following statements shall be placed in the dedicatory language of the final plat:
• The property owners within this plat shall be held responsible for keeping open and maintaining
the surface path of natural or man-made drainage flow over and across their respective
properties. If the property owner(s) fails to maintain the surface path of natural or man-made
drainage flow, or #he drainage swale, a notice of such failure may be given to the property
owner(s). If not corrected within the period indicated on said notice, Spokane County has the
right to correct the maintenance failure, or have it corrected, at the expense of the property
owner.
• There may exist properties, located uphill and adjacent to this subdivision, which periodically
discharge stormwater runoff onto individual lots within this plat. Runoff from nearby uphill
properties should be expected, and during snowmelt periods or wet seasons the lots may be
subjected to higher amounts of stormwater runoff that what is normally observed or anticipated.
Because stormwater runoff from adjacent properties have discharged onto this plat prior to
development, stormwater runoff will likely continue to do so after development. It is the
responsibility of the individual lot owners to maintain existing surface paths of runoff through their
respective lots and to grade the lots in accordance with applicable rules and regulations, so as to
prevent property damage.
• Any building that is constructed on a lot in this plat shall be set at such an elevation so as to
provide positive drainage away from any drainage entry point to the building (including but not
limited to a window well, a window unprotected by a window well, or a doorway). Said positive
drainage shall consist of a minimum slope of 3% away from the building for a distance of at least
10 feet from the building. The lots shall be graded so that either a) all runoff is routed away
from the building, and conveyed over the lot to a natural drainage swale or approved drainage
facility, or b) drainage intercepted on the lot is disposed of on the lot in an approved drainage
facility. The approved drainage facility shall be constructed in accordance with any applicable
accepted plans on file at the County Engineer's Office. Any revisions to the accepted drainage
plans must be accepted by the County Engineer's Office prior to constnuction of said revisions.
• Spokane County does not accept the responsibility of maintaining the drainage course on private
lots or floodplain areas within private lots, nor the responsibility for any damage whatsoever,
including, but not limited to, inverse condemnation to any properties due to deficient construction
and/or maintenance of drainage courses in drainage easements on private property.
Paqe 3 Engineers
O6/19/2002
1308
• The owner(s) or successor(s) in interest agree to join in any County-approved stormwater
management prvgram and to pay such rates and charges as may be fixed through public
hearings for service or benefit obtained by the planning, design, constructing, maintaining or
operation of stormwater control facilities.
• This short plat is located within the Aquifer Sensitive Area (ASA). Treatment of storm runoff
from driveways shall be provided. The preferred method of treatment is to have the runoff from
driveways sheet flow over lawn turf or native-type grasses. If a ditch is to be used to collect
runoff from driveways, then the ditch is to be grass-lined.
• That in consideration of Mutual Benefits now or to be hereafter derived, do for themselves, their
heirs, grantees, assigns and successor(s) in interest hereby request and authorize Spokane
County to include the above described property in a Road Improvement District (RID) and to
support the formation of a Road Improvement District for improvement of the road(s) described
below by requesting and authorizing Spokane County to place their name(s) on a petition for the
formation of a Road Improvement District pursuant to RCW 36.88.050, or by requesting and
authorizing Spokane County to cast their ballot in favor of a RID being formed under the
resolution method pursuant to RCW 36.88.030, and/or by not filing a protest against the
formation of a RID being formed under the alternative resolution method provided for in RCW
36.88.065 and Chapter 35.43 RCW.
If a RID is proposed for improvement of the road(s) described below, said owner(s) and
successor(s)further agree: (1) that the improvements or construction contemplated within the
proposed RID are feasible and (2) that the benefits to be derived from the formation of the RID
by the property included therein, together with the amount of any County participation, exceeds
the cost and expense of formation of the RID, and (3) that the property within the proposed RID
is suffrciently developed; provided, themsetves, their heirs, grantees, assigns and successor(s)
shall retain the right, as authorized under RCW 36.88.090, to object to any assessment(s) on
the property as a resuit of the improvements called for in conjunction with the formation of a RID
by either the petition or resolution method under Chapter 36.88 RCW and to appeal to the
Superior Court the decision of the Board of County Commissioners confirming the final
assessment roil; provided further, it is recognized that actual assessments may vary from
assessment estimate so long as they do not exceed afigure equal to the increased true and fair
value improvement(s) add(s) to the property.
It is further acknowledged and agreed that at such time as a RID is created or any County Road
Improvement project is authorized by Spokane County, the improvements required shall be at
the sole expense of the owner(s) of property within the RID or served by the improvements
without any monetary participation by Spokane County.
The RID waiver contained in this agreement shall expire after ten (10) years from the date of
execution below. This provision is applicable to Boone Avenue and Marguerite Road.
9. The County Engineer has designated a Local Access Roadway Section for the improvement of
Boone Avenue which is adjacent to the proposed development. This will require the installation
of 3-5 feet of asphalt. The constn.iction of curbing and sidewalk is also required.
Page 4 Engineers
06/14/2002
1306
10. The County Engineer has designated a Local Access Roadway Section for the improvement of
Marguerite Road which is adjacent to the proposed development. This wjtl require the addition
of approximately 3-5 feet of asphalt along the frontage of the development. The construction of
curbing and sidewalk is also required.
11. The proposed plat shall be improved to the standards set forth in Spokane County Board of
Commissioners Resolution No. 1-0298, as amended, which establishes regulations for roads,
approaches, drainage and fees in new construction.
12. The County Engineer has examined this development proposal and has determined that the
impact of this proposal upon the existing County Road System warrants the dedication of
additional right of way and the roadway improvements herein specified.
13. "The applicant is advised that there may exist utilities either underground or overhead effecting
the applicant's property, including property to be dedicated or set aside future acquisition.
Spokane County will assume no financial obligation for adjustments or relocation regarding
these utilities." "The applicant should contact the applicable utilities regarding responsibility for
adjustment or relocation costs and to make arrangements for any necessary work."
14. The Spokane County Engineer has reviewed this project for transportation concurrency and
determined that it is exempt under the Phase I- Development Regulations - Section IV (B) (2c).
END
Kimball, Sandy
- - - - - - From: Hohman, John
Sent: Tuesday. June 11, 2002 10:27 AM
To: Baldwin, Greg
Cc: Kimball, Sandy; Sims, Brenda; Peterschmidt, Lucy
Subject: SP-1308-02 Barclay - Proposed Conditions of Approval
6-11-02
No road plans are required for this short plat. Therefore, the foilowing drainage language shall appear on the plat:
The property owners within this plat shall be held responsibfe for keeping open and maintaining the surface path of naturat
or man-made drainage flow over and across their respective properties. If the property owner(s) fails to maintain the
surface path of natural or man-made drainage flow, or the dramage swale, a notice of such failure may be given to the
property owner(s). If not corrected within the period indicated on said notice, Spokane County has the right to correct the
maintenance failure, or have it corrected, at the expense of the property owner.
There may exist properties, located uphill and adjacent to this subdlvision, which periodically discharge stormwater runoff
onto individual fots within Ehis plat. Runoff from nearby uphill properties should be expected, and during snowmelt periods
or wet seasons the lots may be subjected to higher amounts of stormwater n.,noff that what Is normally observed or
anticipated. Because stormwater runoff ftom adjacent properties have discharged onto this plat p(or to development,
stormwater runoff will likely continue to do so after development. It is the responsibility of the individual lot owners to
maintain existing surface paths of runoff through their respective lots and to grade the lots in accordance with applicable
rules and regulations, so as to prevent property damage.
Any building that is constructed on a lot in this plat shall be set at such an elevation so as to provide positive drainage
away from any drainage entry point to the building (inctuding but not limited to a window well, a window unprotected by a
window well, or a doorway). Said positive drainage shall consist of a minimum slope of 3% away from the building for a
distance of at least 10 feet from the building. The lots shall be graded so that either a) all runoff is routed away from the
building, and conveyed over the lot to a natural drainage swale or approved drainage facility, or b) drainage intercepted on
the lot is disposed of on the lot in an approved drainage facility. The approved drainage facility shall be constructed in
accordance with any applicable accepted plans on file at the County Engineer's Office. Any revisions to the accepted
drainage plans must be accepted by the County Engineer's Office prior to construction of said revisions.
Spokane County does not accept the responsibility of maintaining the drainage course on private tots or floodplain areas
within private lots, nor the responsibility for any damage whatsoever, including, but not limited to, inverse condemnation to
any properties due to deficient construction andlor maintenance of drainage courses in drainage easements on private
property.
The owner(s) or successor(s) in interest agree to join in any County-approved stormwater management program and to
pay such rates and charges as may be fixed through public hearings for service or benefit obtained by the planning,
deslgn, constructing, matntaining or operation of stormwater control facilities.
This short plat is located within the Aquifer Sensitive Area (ASA). Treatment of storm runoff from driveways shall be
provided. The preferred method of treatment is to have the runoff from driveways sheet flow over lawn turf or native-type
grasses. If a ditch is to be used to collect runoff from driveways, then the ditch is to be grass-Iined.
Thanks,
John V. Hohman, P.E.
i
PAGE 1 10:54:35 06 JUN 2002
Road# Road Names.......... MPost. Reference Descriptio Road Log Info..........
00286 BOONE AV (START) .000 LILY RD U 19 LIGHT BITUM. 20
BOONE AV .060 G I R.P,R.D RD ( END ) U 19 L I GHT B I T'UM . 20
.120 BOWMAN RD (START) U 19 LIGHT BITUM. 20
PARK RD (END) .180 EAST END OF ROAD U 19 PAVED 20
00287 BOONE AV (START) .000 WEST END TO ELLA RD U 19 GR.AVEL 26
BOONE AV .040 ELLA RD (END) U 19 PAVED 26
.100 ELTON RD (START) U 19 PAVED 26
.170 DICK RD (START) U 19 PAVED 26
.190 DORN CT (END) U 19 PAVED 26
.230 LEWIS RD (START) U 19 PAVED 26
.300 VISTA RD U 19 LIGHT BITUM. 20
.420 BESSIE RD U 19 LIGHT BITUM. 20
.540 SARGENT RD U 19 LIGHT BITUM. 20
.670 MARGUERITE RD U 19 LIGHT BITUM. 20
.790 ARGONNE RD U 19 PAVED 40
.850 MULLAN RD U 19 PAVED 40
.890 STOUT RD U 19 LIGHT BITUM. 20
.950 WILLOW RD (END) U 19 LIGHT BITUM. 20
1.050 LOCUST RD U 19 LIGHT BITUM. 20
1.140 RUDOLF RD (END) U 19 LIGHT BITUM. 20
1.170 FARR RD (START) U 19 LIGHT BITUM. 20
1.200 MACARTHLTR RD ( END ) U 19 L I GHT B I TUM . 20
1.300 WOODRUFF R.D U 19 LIGHT BITUM. 20
BOONE AV (END) 1.420 HERALD RD U 19 LIGHT BITUM. 20
00288 BOONE AV (START) .000 UNIVERSITY RD U 19 LIGHT BITUM. 22
BOONE AV .090 VAN MARTER RD U 19 LIGHT BITUM. 20
.250 PIERCE RD U 19 LIGHT BITUM. 20
.340 SKIPWORTH CT (START) iJ 19 LIGHT BITUM. 20
.430 WOODWARD RD (END) U 19 LIGHT BITUM. 20
.500 BOWD I SH RD U 19 PAVED 20
.560 BATE S RD ( END ) U 19 PAIIED 20
.630 WILBUR RD U 19 PAVED 20
.790 PERRINE RD (END) U 19 PAVED 20
1.000 SR 27 (PINES) U 19 PAVED 20
BOONE AV (END) 1.250 VERCLER RD U 19 PAVED 20
00291 BOONE AV (START) .000 GREENACRES RD U 19 LIGHT BITUM. 16
BOONE AV .240 BARKER RD U 19 PAVED 20
.670 GR.ADY RD ( START ) U 19 PASTED 36
BOONE AV (END) .710 HODGES RD (START) U 19 PAVED 36
00364 BOONE AV (START) .000 LONG RD U 19 GRAVEL 22
BOONE AV .250 GREENACRES RD U 19 LIGHT BITUM. 20
BOONE AV (END) .500 BARKER RD U 19 LIGHT BITUM. 20
00416 BOONE AV (START) .000 EVERGREEN RD U 19 PAVED 40
BOONE AV .190 BANNEN RD (START) U 19 PAVED 40
BOONE AV (END) .250 BEST RD U 19 PAVED 40
00495 BOONE AV (LIBERTY LA .000 WEST END TO MADSON S R 00 PAVED 40
BOONE AV .010 MADSON ST (LIBERTY L R 00 PAVED 40
.050 KNUDSON ST (END ) R 00 PAVED 40
.090 DRURY DR & CT R 00 PAVED 40
.190 WRIGHT BV R 00 PAVED 40
.290 MOLTER RD R 00 PAVED 40
.400 ORMOND RD (NONESTABL
.450 FAI RVJAY RD (NONESTAB
.510 STEVENSON RD (NONEST
BOONE AV (END) .570 EAGLE RD (NONESTABLI
00285 BOONE AV (START) .000 STANLEY RD U 19 LIGHT BITUM. 18
BOONE AV (END) .130 HOWE ST U 19 LIGHT BITUM. 18
00289 BOONE AV (START) .000 MCDONALD RD U 19 PAVED 40
BOONE AV (END) .250 BLAKE RD U 19 PAVED 40
00290 BOONE AV (START) .000 FLORA RD U 19 GRAVEL 24
BOONE AV (END) .500 LONG RD U 19 GRAVEL 24
00374 BOONE AV (START) .000 FANCHER RD U 19 PAVED 30
BOONE AV (END) .OSO SEEHORN R.D U 19 PAVED 30
00390 BOONE AV (START) .000 FAIRCHILD DR R 09 LIGHT BITUM. 26
BOONE AV (END) .380 DOVER RD R 09 LIGHT BITUM. 26
12 Records Processed
PAGE 1 10:54:54 06 JUN 2002
Road# Road Names.......... MPost. Reference Descriptio Road Log Info..........
02967 MARGUERITE RD (START .000 HARRINGTON AV U 19 LIGHT BITUM. 14
MARGUERITE RD .050 MAIN AV U 19 LIGHT BITUM. 18
.170 VALLEYWAY AV U 19 PAVED 18
.300 ALKI AV U 19 PAVED 18
.420 BR4ADWAY AV U 19 PAVED 18
.550 CATALD4 AV U 19 PAVED 18
.670 BOONE AV U 19 PAVED 18
.800 S INTO AV U 19 PAVED 20
MARGUERITE RD (END) .920 MISSION AV U 19 PAVED 20
02969 MARGUERITE RD (START .000 SOUTH END TO MICHIEL U 19 PAVED 40
MARGUERITE RD .020 MICHIELLI PL (END) U 19 PAVED 40
.120 KNOX AV U 19 PAVED 40
.180 MANSF I ELD AV ( END ) t7 19 PAVED 40
MARGUERITE RD (END) .240 MONTGOMERY AV U 19 PAVED 40
02970 MARGUERITE RD (START .000 MARINGO DR U 19 LIGHT BITUM. 18
MARGTJERITE RD .330 UPRIVER DR U 19 LIGHT BITUM. 18
MARGUERITE RD (END) .380 LONGFELLOW AV (START U 19 LIGHT BITUM. 16
3 Records Processed
S P O K A N E C Q I.J N'I' Y
A DIVESION UF T'HE PL'BGIC WORKS DEI'ARTMENT
DIVISION OF PLANNCVG
M[C"Et V. N EEQ33AM, D1RECrOR
MEMORANDUNi
DATE: May 31, 2002
TO: Division of Engineering and Roads - Transporcation Engineering; Scott Engelhard,
c/o Sandy Kimball
Division of Engineering and Roads- Development Services; John Hohman
Division of Utilities - Information Management; Jim Red
Division of Utilities - Stormwater Utilitya Brenda Sims
Aivision of Building & Code Fnforcement, Jeff Forry
Spokane Regional Health District, Steve Holderby
Spokane County Air Pollution Control Authority, Chuck Studer
Spokane County Fire District No. 1
Autc.hinson IrrigatiAn District No. 16
West Valley Schoa►1 District No. 363
Airport Authority, Felts Field
City of Spokane Planning, Don Carlsen
FROM: Ueanna Walter, Assoeiate Planner 6)
SITBJECT: Proppxed Prelimiaary Short Flat SP-SP-1308-02
Attached is a ecapy of the above-subject preliminary short plat application and map submitteel by
7'homas, Dean and Hoskins for Patrick and Melissa Barclay to divide approximately 25,131
square feet inta 2 residential lots in the existing IJrbaa Resideatial-3.5 (UR-3.5) zone.
Please review this proposai aad return vnur w•ritten commenLs and recommended conditions to
me by June 14, 2002. If you have a.ny questions regarding this matter, you may contact me at
477-7224.
wc
Attachments: Application, Site Plan, Vicinity Map
c: Patrick and Melissa Barclay, 892 N. Kniglits Ln., Post FaUs, IU 83854
Thomas. Dean and Hoskins, 343 E. Second, Spokanea WA 99202
M.VL STOP PWK-1 • 1116 W. BROADWAY AVWNLJE • SPOKANF, WASH1NG'ION 99264-02:0
PEiONE: (SN) 477-7200 • FAX: (549) 477-2243 • TDD: (509) 477-7133
P -
. •
~ , • RECEIVED
SPOKANE COUNTY DIVISION OF PLANNING SPOKANE COUNTY
PRELEMINARY SHORT PLAT MaY 2 4 2002
"PLICATION
DIV[SION OF Pt.ANN1NG
- PART I
"
APPLICANT (NAMEE OF LEGAL OWNER): Pt¢ tta' 8a ~1
MAILING ADDRESS: 1 fl~. S Oyep ^ ~ d
cITY: sTATE: V4 zEP: q 4~Q3
r - &&ff 49! 4r
PHONE: (work) (home) " 7~~ ge '
IF APPLICAN'I' LS NOT THE OWNER, INCLUDE WRITTEN OWNER AUTHORI7ATION FOR THE 6ELOW
OWNER'S DESIGNATED CONTACT TO SERVE AS REPRESENTATNE.
OWNER'S DESIGNATED CONTACT: ho e^ ,7
MAILING ADDRESS: ~ ~ ~ ~ S~~r~ ~ ~✓~,c.~ e
GTI'Y: STA'TE: ZIP: ~q 2,o Z- _
PHONE: (work) 01? (home) (fax)
LOCATION OF PROPOSAL SITE (general descriptian by which direction aad how far from ruads and
intersections and other community features): y~ CQ(I]~P Qf Baone a~
l`1~~~~►i f~
SECTION(S) TOWNSHIP RANGE A4
~
I HAVE ATTACHED T'IHE LEGAL DESCRIPTION OF PROPOSED SITE : ()~S
(Attach legal description for the entire area to be subdivided oa the Preluninary Short Plat map with the source
of lepl clearly indicated)
STREET ADDRESS OF PROPOSAL SITE (if aay): ~8o2I ~t5OD /1 P
NANiE OF PUBLIC ROA.D(S) PROVIDING ACCESS: ;OO%e / lv4./' quP/`ifL°
~
AiJDTTOR RECORDING NO.(S) OF PRNATE R4AD EASENdENT(S) AND MAIIVTENANCE
AGREEMENT(S) PROVIDING ACCESS:
ASSESSOR TAX PARCEL NO.(S) OF PROPOSAL SI°I'E: 4016 1•0111~
SIZE OF PROPOSAL SITE (acres or sq. ft): ftl~~i pi
ASSBSSOR TAX PARCEL NO.(S) OF ADJACENT LAND OWNED OR CONTROLLED: ~
S17E OF ADJACENT LAND OWNED OR CON'I'ROLLED (acres or sq. R.): -0AV
DESCRIBE EXISTING iJSE(S) ON PROPOSED SITE (such as buildings, well, sewer drainfield and others):
B f i qd h~c e 4/1 S Lw1&&,1L&, k&JPr.
R Pa~e
- o 0
• ' , /
^
PRELIMINARY SHORT PLAT APPLICATION Page 2 of 5
EXISTING ZONE CLASStFiCAT[ON(S): • ' •
COMPREHENSNE PLAN CATEGORY:
DOES THE PROPOSAL FRONT ON AN ARTERIAIz-
NAME(S) LANNED ARTERIAL : (VYES NO
OF ARTERIAL ROAD(S):
LIST PREVIOUS SP4KANE COUNTY ACTIONS INVOLViNG THIS PROPERTY: (such as Tax Segregation
Application, Certificate of Exemptions, GA or EA Affidavit, Other Subdivision, Zone Change, Variance,
Conditional Use, Temporary Use, SEPA Review, Dependent Relative, Zoning Code Violation, or Others):
PROPOSED USE OF PROPERTY: Duptexes Multifamily dwellings
Single family dwellings ()0 Business Industrial Mixed Use
Manufactured homes (l) Other Describe:
PROPOSED NLJIt+iBER OF LOTS: ~
PROPOSED ACCESS TO LOTS: Privats Driveway, 3 lots oc less Q~ Private Road, 4 lots or more
Fublic R/W with Pcivate Access( ) Public Road County Arterial State Highway
IS DEDICATION OF LAAiD FOR PUBLIC USE PROPOSED (Roads, Parks, Schools, Open Space, other)?
YES N0 IF YES, EXPLATN:
HAVE YOU PROVIDED ACCESS TO ADJACENT PR4PERTY THAT IS "LAND LOCKED" WITHOUT
ACCESS TO PUBLIC ROAD? ( NO
IF No, EXPLAIN wxY: AlIX
PROPOSED SOURGE OF WATER:
Individnal wells PubGc system 00 Private Community System
Ather ( ) - Describe:
PROPOSED MEAAIS OF SEWAGE DISPOSAL:
Pubiic Sewer ~Y,) Community System Septic Tank and Drainfield
Double Plumbing Dry Sewer Other Describe:
UTILITY COMPANTES AND DISTRICTS TO PROViDE SERVICE TO THIS PROPQSAL:
.
Electricity: 4 v l's /0., Gas:
Water. ~l f C ti A Sewer:
Phone: Qwer ~ Cable:
Fire District: School: ~ v 36 ?
Other:
,
•o
d ~
• PRELIMINARY SHORT PLAT APPLICATION Page 3 of 5
t^~ (Y)WO
(exposed standing water, pond, year round stream, river or lalce) LIST:
DOES THE PROPOSAI, SITE HAVE ANY WETLANDS? - YES ( NO
.
.
.
. -
.ls or..
d. piants suc~--as
..wetlan.
-cat ta. ~is ) L S1':
(open water, seasonal water, marsh areas, water saturated soi.
WHICH 1'YPE OF WETLAND EXIS1'S ON THE SITE? Type I ( ) Type II Type IIl Type IV
IF WETLANDS EXISTS, HOW CLOSE TO T°EiE EDGE OF TNE WETL.AND WIL.L DEVELOPMENT BE
ALLOWED TO HUILD? FEET EXPLAIN: V414
DOES THE PROPOSED SI'I`E PRESENTLY HAVE FISH OR WILALIFE HABITAT? YES ONO
EXPLAIr1 THE KNOWN TYFES OF WILDLIFE: fV/ 04
DOES THE PROPOSED SI1'E HAVE CRITICAL AREAS (such as slopes over 3010/a, unstable soil or rocks prone to
landslides, ssver erosion, flooding or others)? LIST AND OPLAIN:
DO YOU HAVE ANY PLANS FOR FUTURE ADDIfiIONS, EXPANSYONS OR FURTHER ACTIVITY
RELAT°ED TO THIS PROPOSAL? YES NO IF YES, EXPIIAIN:
N1Q
1'ART II
FIRE PAAR..SI3ALL i FIRE DISTRICT
RCW 36.70 B requires eariy coordination and information
A. THIS PROPOSAL IS WITHIN FIRE PROTECTION DISTRICT N4. j
B. WHAT IMPROVE1ViEN'I'S NEED TO BE MADE TO MEET THE DISTRICTS FIRE PROTECTION
ttEQuIR.EMENxTS? T o IsE b e-ric7a.u ue:b a-r 1np.%-e o F~~. A aAu caTtoN
C. SEE AII'ACHED LETT'ER DATED: ~ A
D. REQUIREA FIRE FL,OW (gallons per minute): I~ LA
I have reviewed the proposal and have advised the applicant of the Fire District
requirement
Ifs'P s ~ /o
~ ~
SIGNA ' TITLE DATE
1
. .
d ~
/
PRELIMINARY SHORT PLAT APPLICATION Page 4 of 5
WATElt
RCW 36.70 B requires eFVly coord' amnfonaation
A. THIS PROPOSAL IS WITHIN WATER DISTRICT: kLo
B. SATISFACTORY ARRANGEMEN"fS FOR DOMESTIC WATER AND F[RE FLOW HAVE BEEN
MADE AS FOLL•OWS:
A WATER SYSTEM PI,AN MUST BE PREPARED: YES NO 64
xEQuIREMExTs: PJ~Cr ,n r-
~R r b ~ A -
C. SEE ATTACHED LETTER DATED: .
1 htrve reviewed the proposal and have advrsed the appliea»t of the District requirements.
Sw~~er~",e4 s"3 -oZ
y IGNATURE TITLE DATE
J
SPOKANE REGIONAL HEALTH DISTRICT
RCW 36.70 B requires early coacdination and inforntation
A PRELIMANARY DISCUSSION I°iAS TAKEN PLAGE, A COMPLETE APPLICATION MUST
INGLi3DE:
c!t~~ Z
B. SEE ATTAC D LETCER DATED:
After a prelir»inary review of ihe proposal, I have advised the applicant of some of the
Spoka»e R?redii a Health requirements. A complete and detaided review will be provided
afler the an is submitted, which will result in a complete list of requiremerrts and
conditions ng Health pr Z ons far the proposal.
Z
~T.~ *ATE
SIGNATURE ~ TITLE SEWER AURVEYOR
(City of Spokane or Liberty Lake)
RCW 36.70 B rcquires early caordlnadon and information
A PRELIIviINARY DISCUSSION HAS TAKEN PLACE, A COMPLETE AP - ATION MUST
iNCLtJDE: B. SEE ATTACHED LETTER DATED: After a preliminary revietiv prvposal,l have advisetl the applicant of some of the
Sewer re%,--- re . complete and detailed review tivill be provided after the application
is subniit which will result in a complete list of requirements and conditrons regarding
Sewer provisiorrs for the proposal.
SIGNATURE TITLE DATE
<
. .
/
PRELIMINARY SHORT PLAT APPLICATI6N ' Page 5 of 5
PART III
LEGAL OWPTER SIGNATURE
(Signature of legal owner or representative as authorized by legal o~mer)
I, ~Q fr I*C /`C ~Q,,r~ (print name) SWEAR OR AFFIRM THAT THE
ABUVE RESPONSES ARE MAUE TRCq~1HFULLY AND TO THE BEST OF MY KNOWLEDGE.
IFtJRTHER SWEAR OR AFFIRM THAT I AM THE OWNER OF RECORD OF 1`HE AREA PROPOSED FOR
THE ABOVE IDLIdTIFIED LAA1D USE ACTION, OR, IF A10T THE OWNER, ATTACHED HEREWITH IS
VAUTTEN PERMISSION FROM THE OWNER AU'fHOR1ZtNG MY ACTIONS ON HIS/HBR BEHALF.
ADDRESS: 19 2- I/c A~4 /S -I ~'1 PHONE: 4
,~0l t Ft?/& ZIP:
(City) (State)
. f
~
SIGNATEtE DATE
NUT?M
(For Part 1II above)
STATE OF WASHINGTON ) ss:
COUNTY OF SFOKANE
SUBSCRIBED AND SWORN to before me this day of 20 ~L
, .
NOT
~ . • • NOTARY SIGNATURE
~
°TARy Notary Pubtic ia and for the State of Wash' on
• ~ • ~
Resid'mg at: • C./
. ~18~1C'► : 0? _~~Q~ ~
.
;~MY apPointrnent expires:
PART IV
(To be completed by the Division of Planaing)
DATE SUBMITfED: JA-D~-. RECEIVED BY: at)"
TOTAL FEES: 46-0-D0 RECEIPTNO.:
FILE NO.: -5)-IbM~UL DATE COUNTER COMPLETE: r'J•~'O~
PRELIMINARY SHORT PLAT APPUCATION -1lVTC RE1/ 11101
; - - ~i~
TIFICATE 4F-INATER A1lA1L.AP" Y •
~ ;(IHISSEC774 ,,9B.C0WI.hT6DBYSP0JICW5C0IlM!'BUILDJN+6M/DC~ _pr;i~RC~ffJYn.
'T.lils ilorm Is only t+~ be submitted"es en.ettechmsnt to_a-lfuily, completed aQQ!lcadon
' - ,
_ Name of Wetir IPunreyor:, d"k-;,v sw 7.i~.
Flra. P4odv
' Requlreinents: Jew gpm;, at r~G psi;: fbr 3,0 minutes..
.AW=f AMM7-
CEitTIFICA
Tt0N
(lNISSfiC770NM BBCOM?L878D;BPAPPLtCAN7'AND Wi1?SRPURITsYO1RJ
.Projedt.iVame:
Peircel'Number(s):
'C3eneral Descriptlon:
Weter.SyBtem tdame: L* WA DOH ID
~
The above named Public Wa4er System has,the capacihr'to supply weter to"the referenced project or
subdhrision for connecdon(s).
(check, one box belaw)
Ct '1. The proposed project is, consistent•with the ~WWMer..~ Punreyor's DOH, approved Water Sysbern
Plan. _ Facftifies,have , been oonstruded to: pnovide adequate supply, storage, and transmisslon
capablfKy to serve the projecCs water-supply.needs,lncludinA fire,floav requirements.
OR
2.: The proposed project is -oonsistent with the -Water Purveyors DOH approved Waber Sysbern
Pian.,Facilities ; wiil be constructed to provide adequeite suPPty, storage, and ~tiansmission.
_ cepati~ity to serve. the proJect's water suPPty`:needs, induding flre flow requirements. F'inanc~al ,
security may be reqirirred. - - - ,
OR
❑ 3. The watet system cannot provide 'service to the proposed project -at thts tlme. 'Comments: ~
This Certi9lcate ot IlYater Avallabflity,, Is, non-transferabte to,other projecte. (FoP relevant laws, see
OtCY1168:17,38.70A and 19:Z7:) Further; a, new Cert14icats-af VVater, Avatlabllity4hall bo orequlned fg:
1) e'pnoject nnodificatlon r~esul~s Ire, grea~er water demand; or-Z) a proJect extonsion ot tlme'is '
Pequos4ed.
% 1
Certlfled by: - _ Q►^ ~ h ~~OP~t~`~
~ N - Trde - J o8~
CONCUItRENCY DETEF"P1AT10N
(1NISSBC7lON1D BBCOJIVLBT6D:BYSPOKM/BCOUMYJ'
If box 1 or 2 ts, checked and the Water' Purveyor has,signed the above Certiflcebe of Water Availability,,
concurrency is,sattsfled, for water. Otherwisejefer applicant; to the Diviston of UtiliUes.
❑ This- development is exempt trom concurrency fbr water senrice.
Q This development. (doesldoes not) meet the concumency, requirements fbr water service.
~ clrde one)
spokene:caumy Fteprmnredve.StgnaturAECEIVED- oaft
L212
Cert of Water Avallabipty.doc MAY 2U U` u°° 0 ~ ~ .
' D11/ISION OF PLAWNINC,_
i
ti r
j -
. . P,w- 13 8
1 ~ 02
CERTIFICATE OF SEWER AVAILABIL 4N
Thls lform is onlM to be 8ubmltted es en effachment to a hiltv completed apDlfcatlo'NECEIVED
Name ot Sewer Utllity: SPOKANE COUNTY
CERTIFICATION 4 OZ
Project Name: -iL,J"m c
Par+cel Numbera: 4-q 1c~ 1 1 4 3 1 c NING
Generat Project Descxiption: ,,,,9afz t- tw\„' v\A✓~ S.Jjr)e-r- PLA i
The above named Pub(ic Sewer System is capable of and will suppty sewer serv(ce to the referenved
project or subdivisfon.
-t!:~ CJc~ ~ 1. Is sewer cumentty available, wlth seNlce connecbons provided as required, to serve proposed
No development (If yes, go to signatur+e biock; It no, go to 2e) Yes ❑ No
T~
6FWU, 2a. Is the efte within the Spokane County Sewer sbc•year Sewer Capital Improvement Program?
•(If no, go to 3) ❑ Yes ❑ No
2b 1MQ the developer design, tund, construct and piovide finandal surety for the necessery sy$tems
to provide Dryline Sewer and/or poubte Plumbing Dry Side Sewers as required?
(if no, go to 3) ❑ Yes ❑ No
3 Will the developer design, tund, construc# and provide financlai surety for the necessary systems
to extend sewer service to the site and provtde service connectlons as required? ❑ Yes No
This CertNicate of Sewer Availability is non-transferable to other projects and shall be valid as
long as the reierenced project remains acttve and is not modffied.
Certffied by: If-._ 42 IT-- t= i-TA -ff'JJ C-7 . `~Bc ~ 2 •
Pifnt Nsme 1Tdfe
- P / • /-3/oz . .
Slgnature re
CONCURRENCY OETERMINATION
If yes to queston 1, or questlon 2b, or question 3 above, concumency is satlsfled for sewer. Otherwise,
refer applicant to the Division of UUlMes.
❑ This development la exempt from concunrency for sewer service.
❑ This devetopment (does/does not) meet the concurrency requirements for sewer service.
clrrde one
SpoWD County Repre3em'a6W
a tO&Me!'j
a, ncG
(-44731 17 0n fV2- f/, o2~ .
Cert of Sewer Aveilabilily.dac ~ ~01002/
' • I ~
` SEF . ,
.
~ X STA 0+92 SHEET 09 STA 1+02 STA 2+07
I. E, MIN 8' COVER I.E. 1974.00
I.E. 1973.24 ,
. 1s. s ~ a~ss . . . a a~ss 19 LF 4"ss
+30 45181.0318 45~$1.0J1 " 45181.0422
I 71.8 ( ~ ~
~ ~ x x ~ - ~ o . . ~►n~ ~
s, 1
. ~ :iN x x . .
O
-L~- I ~ - ~ ` Lv ~
w
a -W ~
~ + Z
~..L S T. O N
~ ~ •,-o ~ ptic, DW' or
grovei ~ I V ~
r ~ Dr y iin informa l tion 0~
STA 2+14 d. x ~ o ~
> UNDER ~
809 ,,Ow-24;5 9 F54„ S ~ 88 a;:: CONSIRUC110N SEPT~
21 ~ ° 8907 1 J x
45181.1902 ~
~ . . qR11 ,
~ PT ~ B91rJ
J ~ ~ SE
-W- - - - - • Zu
o r
~ ~ ~.2
~ a -
0 C3 • v►
~
,
, .
.8. ...o.:::......:..~.:::::~:~:~:::~~~.
~ ,___..~,.a._.,. .,;P~_..._.o...o.. .
` ~ - - , ...-2 O- _
EB
~ i 0: ~
8804 °
~ ~ - T- - ~
I 8824
~ conc I I
-m, _ , ~ ~ • ~ ~ fTo` Septic, I)W c r
Y ~ I~•~~~, ~ Dr~ine inforrnation
110 + r found. x
~ sFPTI.~ ~
x
~
~
+ - • o•. I
~u/ ~
lSEi'1i
o ( I
1+890
1971.61 0411sS
:1.1116
3BEQ--uP x SEE STA 0+93
1974,17 ~HEET 09 I.E. 1972.95
4TION = 20.5 LF 4"SS
~ 45181.1208
,
, I
MN r.7 MH D1
~ SpoKANE CoUN-TYDirvisioN a~ BUHDnvG
~
ANn CoDEENFORCEMENT
1026 w~~ AvENuE 4 spoKANF, W~ 99260-0050
5ite Infvrma#ian Project Information
Site Addri:as: 8821E HOONE AVE ' Projec# I+Iuea6er: 02001974 Inv: 3 Usue Dste.
5P4KANE, WA 00000 Pernait Use: 3P-1308-02 2-LO7 FDTAL SP
Parcel Alumber; 45181.0318
SubdMsion: 005408 Applicant: BARGLAY, PATRICIC
Black: Lafi: 1028 EQ`+'ERBLUff
zQning: UNK Unknoti4m SPOKANE wA 99203 Phtine: (509)535-5958
,
4wner: BARGL-AY, PATRICK L Cuntact: BARCLAYPAMCK
i028 E~V~R~LU~F ~
Addrea~s: 1028 E t7VERBLUEF SPOKANE WA 99203 Phone: (509) 535-5958
SPOKANE WA 99203
BWding Inspectvr: DAN HiDWARI] Setbacks - FronF Left: Right: Rear:
Water Dist:
Granp Name:
Project Name:
Permits
3'ltoTt lpfltt Cantrnctor: IAceme H:
ENC3MM @MAGMAP 8t PLA $100.00 FINAU 3 iA'CS $326.00
7'otal tenutt Fee: $426.00
Fayment Summary
Total Fees AmountPsid AmountOwiag Traa Date ReceiiDt # Pavment Amt
S426.00 $426.00 $0.00 8116102 6324 $426.00
Ptocessed By: Buck, Marti PAYINENT
Printed By: WENDEL, GLORiA. Page I af 1
~ •
Spokane County
Public Works Department
Division of Building & Code Enforcement
Receipt
Receipt 1Yumber: 6324 Custoiner Number
Projects
Full Project Nbr Inv Nbr Fee Anit InvAmt OwiAg PAID Pmt
02001974 3 $426.00 $426.00 $426.00 $426.00 ~
Total: $426.00 .$426.00 $426.00 $426.OQ .
Miscetlaneoas Items
Tota! PAID: $426.00
Tencler
?pe Check Acct Balance GGNbr . xp Date TEII/DERED
Check1 1871 326.00
Payer: PATRICK L. BARCLAY .
Check2 1872 100.00
' Payer. PATRICl4 l.. BARCLAY
Total TENDERED: 426.00
Over / (Short) $0.00
. Chalige • $0.00 .
Notes: . '
° Tian Date / Tlnre: 8/16/021:50:46 PM .
By: GWende!
Logo„ User: gwendel
SYatfon: GWENDEL -
• ~ Clverride By: Printed: 81161021:50:47 PA1 f'ab'e I oI j
Pmm 1308- ~
S c> IG n Pl 1':. 1.,1 t'1 ' 1' Y
- _ a.~.. , ; . .
DIvlsscII•, 01' 1:1•tr.1ttl:rIttr11: nl•til ItrAIP. • n IlWtM+V I+W 1111: t41111,11• Iv( Iici:s tIFrnIt ir.irI iI
lVilUnm A. Jolmn. !'el:.. C:Ei-s»tily Ps%gimret 1.1. uii. 1' 1:.. 116 4.4•1441
~ RECEIVED
'
AG'R EEn-T~ll) likY F,5 SPOKANE COUNTY
MaY 2 4 zooZ
, MVNWN OF PLANNING
' 'his r re~• .iiicnt 1~ct ~v ccii.S ~~~kn uG t:~~iuily sin~l r'j
f
~ ~ (u,1e I414 rrn~
wttosc iiitcrest iii Iltc liro-jcct is
2o+D ~
is citlereci itito Il~is jl;~y tif . 7~ ~_----••'I'liis ahreciiu:n1 is appliciibic io ilic rrojeci
kiintvit :►s:
~~rt~~ec~nnnRSStsr'1lteirante~'ilta t~t~t) ~
,
Tlis►l tlie inulivicltinls anci parlies ilamecl hercill:is hsivinG ail iitlere:st in ttie silicive ilescriliccl lir(>>>erly or liroject ngree
to tlie fcillowiiig: .
1. RL-imliiirse Sliokniic Coiiiity fc►r prc~jcrl rcvicw anul iiislicc:liciii fccs as slicciliccl iii Ch:iptcr 9.I4 o[
Ilie Sliokniic Cotinly Cculc. 'I'llc fces will I+e 1►nscci nit ncitint stiiary c:cisls iitettrrecl liy .Sluilame
County for liraje:cl rcvic:ws aiul / nr inspce:ticros plug n lcit lic:rcctit admittislr:tilivic e:liai°cc, niut will
Iie hillecl muonllily r►s nCci•ticct. /ttiy bili'1118 iiltio»itiIS ftifc, iiicllulinL aiiy cxiieiiscs iiienrrcll iis lllc
ccilleciic»t of noi civcr(ine »cc:(i►i»1, i►»>sl I~e psiici liritir Ic) Ilic l.'omity's ncccpttmcc of Ilic projc:cl fur
filins. If n lirojcci is npprovccl mul/or [ilccl wifli ;i balnnec slill owiiil;, ilic mipa'tcl balancc sliall tic
liniel wilhin 30 days of Iltc invoice citilc.
2. "I'tic iiiulcrsigiiecl i►grccs tlmt tltcsc fCCS nre cliic njul payrl►1e tiliciii rccrip1 rif ilic billiiiy ns spccific:d
7hovc. ~
3. Atty iiivioiCCS iuit lini(l wil,liiit :ifl (ls+ys cir Ilu: iiivciiec daIc will 1ie r.ontiiclercd cieiincpur.iil. It' niiy
(rulslsli)(line 1►1lane;c oil Iltc nee:cninl for iliis projcr.l 1s nn~ Imill tvitliin :10 days of Iltc: iiivuice: 4I;11c,
no fiii'llier reviews nf ilic lirnicc:l tIcic:iiiilclitS will Iic ctiiuluclecl iintil ilic eiilirc ncc:imm h<<lanee is
rnicl. Arty IinIaificc nii Ilic nccoitnl frii• iliis project iu~i paicl witttiii (is it:iys of Ilic i~,voicc iln1c may
resttll itt legril ttclic»t nr Ilie f11I11St1Itti11 +if cillter collec:tinn rror,eclures, ii►cliieliiig referrnl !o ;t
coIleclion rgenCy. '1'he Spoiisor will 1ic 1iable I'or 1ny aiul all exliciiscs iiicurreel by ilic Cumily li)r
llic cotlcelioti nf civcr(luc nc:enuiits.
,I. I11tti111I1IY ItiiIIif1i; tiI1t111ItI IIL sL•t11 lt► II11: :mrnlim, <if:
•
ti A til : ~ .~_d . _ _ _
-
ADDREss: A#Z?Z
. ..i.ni
Ci<
r: . Q_~ e..___.-._._. _..w~
-
'Z.11' C()1,1? :
C'I [ON17.
1 itnclcrst:ind Iti71 fjiiltirc 1t) Jnay 1licsc fc:eti nuiy restilt iu (Ic-lri,y ill c:ompleii(m cir aplirfma1 of tllc lirq.jec;t cir othcr
pnssibIL .ti;inclioils. ~
[;l If tltis fc:c ngrceitiew 'ss ccintftIc:Icc! Ily til»m't111L t1II14r II1a11 II1L Spcunsor (i.c., ilic pr()jc:c1 o«►iicr c11- 1
princilinl hi ilic firiii sprnnsnritig ilic lir(i * jce:1), siicii ris ilic Iinj;ime:r desiuliiiig IIic 111e0cl, llirii
tvrilteii s►iillroriznlim froin ilic .5li(iiisor spcc:incrtlly t1i1ll1orhiili; Ilic I1grcilf In exr.cille (llis trcc
At;rcmiseid is sillnchcel 14) Ihis Vcc gre:ct ciil.
. . ~
. .~It~~IA 1111t1. 11,.
~ . _ . ...~_w -
~ AV y..... G(PRIN•i• tvnn►tt:)
itEIl'UitN YE11,1,0tiyA jc1l'Y110 S1'01tENGINFE-318
k%s\I\ar,«<rrc.,<nc 71trnr,
1!):6 W Itra1111%vsly Avc Slii►Ic:»>c ti1'r1')9Zfi1f•tft7tf (5119) $1156;361111 FAX: (SI)'.>> 32-1-3,1711 '1'1)1): (509) 3211-3166
SpoKANE CouNTYDivisioN oF BuumuvG ~
AND CoDEENFoRcEmiENT
1026 WESTBRoEwwAY Avmm • SPOxAm, WA 99Z60-4050
Site Irrtormation Project Information ~
Site Address: 8$2I E BOONE AVE Project Namber: 02001974 Lnv: Z Issue DAte:
SPOKANE, WA 00000 permit IIsc: SP-1308-02 2-LOT SP
Pareel Nnmber. 45181.0318
Su6division: 005408 Apphcanr: BARCLAY, PATRICK
Block: Iat: 1028 E OVERBLUFF
Zoning• AGS SPOKANE WA 99203 Phone: (509) 535-5958
Owner: BARCLAY, PATRICK L & MELISSA A Contact: 13ARCLAY, PATRICK
1028 E OVERBLLJFF
Address: 8821 E 804NE AVE SPOKANE WA 99203 Phone: (509) 535-5958
SPOKANE, WA 99212 Seibacks - Frnnh LeM Right: Rear.
BQllding Inspector: NONE
Water Dist:
Group Name:
Projcct Name:
Permits ,shpM pW ContraMor: Lleense
ENGi►VEER PREIDM REVIEW $100.00 PRELIMINARY: 2 IATS S635.00
UTll1TIES (INSIDE PSSA) $100.00
Tota! Pernilt Fee: $855.00
Payment Summary
~
ToW Fees AmountPafd AmountOwine; Trvn Date Recea t~# Pavment Amt
$855.00 $855.00 $0.00 5/24/02 3711 S855.00
Procc9sed By: Buck, Marti PAYIVENT
Pr'tnted By: WEN'DEL, GLORIA Page 1 of 1
Spokane County
Public Works Department
Division of Building & Code Enforcement
Receipt
Receipt 1Vumber: 3711 Customer Number
Projects
Fu/l
Pro#ect Nbr Inv Nbr FeeAnrt InvAmt Owing PAID Pint
02001974 2 $855.00 $855.00 $855.00 $855.00 6d
Totol: $855.00 $655.00 $855,00 $855.00
Miscellaneous Items
Total PA.ID: $855.00
Tender
I,pe CJieck Acct Balunce CCNbr Fxa Darte TENDERED
CMeck1 1924 655.00
Payer. PATRICK L BARCLAY
Check2 1922 100.00
Payer: PATRICK L. BARCLAY
Check3 1823 100.00
Payer. PATRICK L. BARCLAY
Total TENDERED: 855.00
Over / (Short) $0.00
Change $0.00
Notes:
Tran Date / TiAte: 5/24/02 2:16:56 PM
By: GWendel
LogoR User: gwendel
Statlon: GWENDEL
Override By:
Printed: 5124102 2:16: S9 PM Page 1 oj 1