Loading...
2008, 03-19 Permit App: 08000882 Deck project Number: 08000882 Inv: I Application Date: 3/19/2008 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: NEW 120 SF DECK Contact: CAPSTONE CONSTRUCTION Address: PO BOX 388 C-S-Z: NINE MILE FALLS,WA 99026 Setbacks:Front Left: Right: Rear: Phone: (509)468-4981 Group Name: Site Information: Project Name: Plat Key: Name: Range District: East Parcel Number: 45231.3110 Block: Lot: SiteAddress: 14815 E 2ND AVE Owner:Name: ABLEMAN,JOANN M Address: 14817 E 2ND AVE Location::CSV SPOKANE VALLEY,WA 99216 Zoning: CF Community Facilities Water District: 010 VERA Hold: ❑ Area: .00 Acres Width: 0 Depth: 0 Right Of Way(ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: „„.„ . Review Building Plan Review Released:By, Originally Released: 3/19/2008 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Originally Released: 3/13/2008 By: mpalaniuk Operator: jmm Printed By: jmm Print Date: 3/19/2008 Project Number: 08000882 Inv: 1 Application Date: 3/19/2008 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: CAPSTONE CONSTRUCTION Firm: CAPSTONE CONSTRUCTION Address: 2917 E FRANCIS Phone: (509)468-4981 SPOKANE WA 99208 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation DECK OPEN R-3 VB 120 $1,800.00 120 $1,800.00 Totals: 120 $1,800.00 120 $1,800.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $69.25 WSBC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT 1 SELECT $27.70 Permit Total Fees: $101.45 Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $101.45 $101.45 $0.00 $101.45 $101.45 $101.45 $0.00 $101.45 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 3/19/2008 New project Project Previous pre-app meeting , spokane Transmittal Plan revisions ❑ City of Spokane Valley Transmittal Date: 4001100"ValleY Community Development Thursday,March 13,2008 Department 11703 E.Sprague Ave,Suite B3 Spokane Valley,WA 99206 Phone:509.688.0036 Site Address: 14815 E 2ND AVE Project Number: 08000882 Parcel Number: 45231.3110 Zoning: CF Water District: VERA Fire District: FD 01 Applicant: CAPSTONE CONSTRUCTION Owner: ABLEMAN, JOANN M PO BOX 388 14817 E 2ND AVE NINE MILE FALLS, WA 99026 SPOKANE VALLEY, WA 99216 (509) 468-4981 e-mail: e-mail: Contact: CAPSTONE CONSTRUCTION Occupant: PO BOX 388 NINE MILE FALLS, WA 99026 e-mail: (509) 468-4981 e-mail: IVECEH Contractor: CAPSTONE CONSTRUCTION Arch/Engineer: D 2917 E FRANCIS SPOKANE WA 99208 [� (509) 468-4981 e-mail: 0 D Q L Project NEW 120 SF DECK Description: Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATION CONSTRUCTION PLAN SITE PLAN TDS S � Please send all plan review and project comments via e-mail to the highlighted individuals. For City Use_Only SCITY OF PLUS Project Number J-(7 . 2 po1ine Project Address /Lf 8/c � 2pLaie a Q ° 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is -" / fj - The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person hthe the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. > Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in thePermit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section ofthe application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07 F 1PLANNIN G DEPT. APPROVED ws 4147' BY. � A J DATE: 3/ 3 /2.00 �o e 140,45; SL; acc.K -vf.^ > C,11.- To 'GP ; s iE RIN 1.\)0 St\ouJ.NJ -6u PE,"r y P2o v i t —S ISO-c- YUN "&A .T /•J (YE- )40 r � sr0i-I A " of S "on T .,. 3'.0"maximum --r{ IT —�3"maximum akar Deotlng T 36" Olderminimum . - • • 36" Itit L(�b • minimum Z x O q ', _ .. I ledger attachment must be bolted through 1 _ ,lr Decking �11-11-/1-II 1111 11I�.1-1,1 amender. 1 1 / 1 1 a omedge of _ - - .. ...� a center oflialri rel-th" ir J- J L MUM aaa • Joist z ! o-t @�G`aac Joist Up eeter then 4'-0" �_ 2X f/ - provide racmmin. p, 1 If greeter than 4'-0" U Aa4 braces and port- i• • to-beam connectionsWitting Dwelling provide■min.of /6 0 C 4x4 braces at poet- to-beam connealions (Maximum Post Height shall not be (Maximum Post more an 10 feet) Height rhell not be more than 10 feet) IFM.0 •i ' •.7 . •:" • ice•, I•'�t tigll=IIM11`'r=1.=i �-- . rrEffl •It y• •• illIS t •ai ... m l•• 1• • •1" pouf ",`4' .i)`.4 end baseu p • Post&Beam Connection detail(interior condition) FtiJ,j 1"min above concrete or Pmt Cap Installed per maxuhotruer',Instruction uld ,provide treated wood II"min. 8'min lb;. , �•+•(4x4) LI Jr. I r inimum 2000 psi Knee brace r r•� "�,.. P K. 5 y cant n {". r• fooling , r r ' minimum ]tif covered 12"min lam`�; /,/I: 3"minimum =!'4 ' HINDI•' I#1r'NP r 1.1....L J-1 :7U `�I!"��!` -41 �.1yr � �•4 i ,ilrlg"min.(4x4) F r_�t,_ r Two 1/2"diameter is u�• Kne brace Natural Gnda� �� "} bolls lop end bottom typical 1.` � b. Post&Beam Connection detail T min to drylighl l2rr Poet Pat oil cap installed per menu6elurer's instruction �'�. els!buacep N6F4 1"min.above concrete or la"min. ' 1 Sli�l,I ride healed wood 24 max. —a.� (4x4) -ry 'hl'� Overhang I Knee brace kl r'0 1,= tW 1 7 '4,1 'learn :;.r.•:•: ./ minimum ( \f� k t7 till + i14.' .J�II,-4 ^-A°,�5,, 7 2000 psi concrete(minimum I r; n r;. 24"minimum if covered ,, .lj 'r •,7i.."11%.' if.. IS"min.(4x4) ,. : 6' 7"midmum , 1 r�"s 12"minimum i`; r �C ;; lKnee brass _I•• ry1a. f i + I11�'i r t� Two Dr diameter lag g♦1' `(1 bobs tap and balsam typical .I .--I+1 Natural Grade 17" OPEN RISER PERMITTED-41N. SPHERE WILL NOT PASS THROUGH OR WHERE HEIGHT OF STAIR IS LESS THAN 30 INCHES 4-IN.SPHERE CANNOT PASSTHROUGH FULL 36 IN.MIN GUARD HEIGHT PER SECT. R316.1 AT LANDING I•.1 I I 34 IN.MIN GuARD HEIGHT PER SECT.8318. 34'TO 130 IN.MAX FOR HANDRAIL PER SECT.11315.1 38' • • MAX.RISE 734 IN. 10 IN. 0-IN MIN RUN• I / PASSPHERE THROUGH CANNOT • s9 i r VARIATION OF RISER HEIGHTS OR TREAD DEPTHS SHALL NOT EXCEED aB IN. • YL 114..4.• NO/EM DEPTH 01. N.MINT ea OBDUNEDrW;MtiTM w' ' PORIIONOP 4VL DRAB TYPE EIWO/1M- 01/111.NAPO WIuAUO WORK NAMPA&WITH CRM1U BL PIwvuDAM OMMrHIBR OA H,u,i ROOVIDI4OU 1 IINfR1MR MSUMerA10 BURCALA CROS B610110NNED B CIRCUM CROBB • CIRCULAR HANDRAIL + 7ttE I taoRAiI. 1 f . . 90 m DECKS: Ledger board requires'/2"lag bolt @ 16"o.c.with flashing behind.Guardrail 36 in.high required if floor more than 30 in.above grade.Picket spacing no more than 4 in.apart.Posts I require approved base and beam connectors.Min.24 in.frost ' protection to finish grade with min. 12 in. footing base. I f12 0 : . : . (2. r 4 .19 L- ----------- --------- --N.--- --- /145rlsG2N �4v.4 - SPoteC%,.� 44.A.1 L"‘l /i 1-71/. " 12-0 'BOA- Single 3-1/8" x 9" BOISE GLULAMTM 24F-V4/DF Floor Beam1FB01 B'C CALC®9.5 Design Report-US 1 span I No cantilevers 10/12 slope Thursday, March 13, 2008 10:19 Build 91 File Name: Deck Job Name: Description: FB01 Address: Specifier: City, State,Zip: , Designer: Customer: Company: Code reports: ICBG 5745, LA-01365 Misc: 1 f "`r ,.� . ie a 1r w } 12-00-00 BO,3-1/2" B1,3-1/2" LL 1800 lbs DL 341 lbs 1800lbs DL 341 lbs Total Horizontal Product Length=12-00-00 Load Summary Live Dead Snow Wind Roof Live Tag Description Load Type Ref. Start End 100% 90% 115% 133% 125% Trib. 1 Standard Load Unf.Area(psf) Left 00-00-00 12-00-00 60 10 05-00-00 Load Disclosure Controls Summary Value %Allowable Duration Case Span Location Completeness and accuracy of input must Pos. Moment 5941 ft-lbs 70.4% 100% 1 1 -,Internal be verified by anyone who would rely on End Shear 1769 lbs 35.6% 100% 1 1 -Left output as evidence of suitability for Total Load Defl. L/332(0.417") 72.3% 1 1 particular application.Output here based Live Load Defl. L/395(0.351") 91.1% 1 1 on building code-accepted design Max Defl. 0.417" 41.7% 1 1 properties and analysis methods. Installation of BOISE engineered wood Span/Depth 15.4 n/a. 0 1 products must be in accordance with current Installation Guide and applicable %Allow %Allow building codes.To obtain Installation Guide Bearing Supports Dim.(L x W) Value Support Member Material or ask questions,please call BO Post 3-1/2"x 3-1/8" 2141 lbs n/a 30.1% Unspecified (888)234-0056 before installation. B1 Post 3-1/2"x 3-1/8" 2141 lbs n/a 30.1% Unspecified BC CALC®,BC FRAMER®,AJSTm, ALLJOIST®,BC RIM BOARDT'" BCI®, Cautions BOISE GLULAMT"',SIMPLE FRAMING Column at Bearing BO analyzed for bearing only, column analysis has not been performed. SYSTEMS,VERSA-LAM®,VERSA-RIM Column at Bearing B1 analyzed for bearing only, column analysis has not been performed. V ,VERSA-RIM®, VERSA-STRAND®,S® VERSA-STUD®are trademarks of Boise Wood Products, Notes L.L.C. Design meets Code minimum(L/240)Total load deflection criteria. Design meets Code minimum(L1360) Live load deflection criteria. Design meets arbitrary(1") Maximum load deflection criteria. Page 1 of 1 ROI$ - Single 3-1/8" x 9" BOISE GLULAMTM 24F-V4/DF Roof Beam\RB01 Bo CALC®9.5 Design Report-US 1 span I No cantilevers 10/12 slope Thursday, March 13, 2008 10:18 Build 91 File Name: Deck Job Name: Description: RB01 Address: Specifier: City, State,Zip: , Designer: Customer: Company: Code reports: ICBG 5745, LA-01365 Misc: . l° . 12 1 . 12-00-00 Il BO,3-1/2" B1,3-1/2" DL 1241 lbs DL 1241 lbs SL 750 lbs SL 750 lbs Total Horizontal Product Length=12-00-00 Load Summary Live Dead Snow Wind Roof Live Tag Description Load Type Ref. Start End 100% 90% 115% 133% 125% Trib. 1 Standard Load Unf.Area(psf) Left 00-00-00 12-00-00 40 25 05-00-00 Load Disclosure Controls Summary Value %Allowable Duration Case Span Location Completeness and accuracy of input must Pos. Moment 5525 ft-lbs 56.9% 115% 3 1 - Internal be verified by anyone who would rely on End Shear 1645 lbs 28.8% 115% 3 1 -Left output as evidence of suitability for Total Load Defl. L/357(0.388") 50.4% 3 1 particular application.Output here based Live Load Defl. 0948(0.146") 25.3% 3 1 on building code-accepted design Max Defl. 0.388" 38.8% 3 1 properties and analysis methods. Installation of BOISE engineered wood Span/Depth 15.4 n/a 0 1 products must be in accordance with current Installation Guide and applicable %Allow %Allow building codes.To obtain Installation Guide Bearing Supports Dim.(L x W) Value Support Member Material or ask questions,please call BO Post 3-1/2"x 3-1/8" 1991 lbs n/a 28.0% Unspecified (888)234-0056 before installation. B1 Post 3-1/2"x 3-1/8" 1991 lbs n/a 28.0% Unspecified BC CALC®,BC FRAMER®,AJSTM, ALLJOIST®,BC RIM BOARDTM BCI®, Cautions BOISE GLULAMTM,SIMPLE FRAMING Column at Bearing BO analyzed for bearing only, column analysis has not been performed. SYSTEM®,VERSA-LAM®,VERSA-RIM PLUColumn at Bearing B1 analyzed for bearing only, column analysis has not been performed. VERSA -RIM®, For roof members with slope 1/4 /12 or less final design must ensure that pondinginstabilityVERSA-STRA Bis VERSA r duc s, ( ) g trademarks of Boise Wood Products, will not occur. L.L.C. For roof members with slope(1/2)/'t2 or less final design must account for Rain-on-Snow surcharge load Notes Design meets Code minimum(L/180)Total load deflection criteria. Design meets Code minimum (U240) Live load deflection criteria. Design meets arbitrary(1") Maximum load deflection criteria. Member Slope=0, consider drainage. • Page 1 of 1 • • . PROVIDE DIAGRAMS AND ENGINEERING LAYOUTS FOR ROi)F TRUSSES, BEAMS AND FL )OR SYSTEMS PRIOR TO FRAMING INSI'ECTIONS CITY COPY THIS BUILDING SUBJECT TO FIELD INSPECTION CORRECTIONS REVIEWED FOR OOJE COMP IANCE SPOKANE VALLEY BU LEUI - VISION 3 / cs