2012, 10-12 Permit App: BLD-2012-1814 Pole Bldg Community Development Department (Staff Use Only)
, 'ermit Center
` y 11703 East Sprague Avenue, Suite B-3 PERMIT NUMBER:
Spokane - rw
Spokane Valley, WA 99206
Tel: (509) 688-0036 a— .. ._.PERnY"FEE' 4
Valle Fax: (509) 688-0037 ! c� ._..�—
y 4110.
permitcenterOspokanevallev.org s ' r�! _ r rt a
i r Fri 0
RESIDENTIAL CONSTRUCTION PERMIT APP 1 A MAN
El NEW CONSTRUCTION 0 ADDITION/REMODELCE Q,F3.X.BUILDINCENTE�G
0 DECK 0 OTHER
SITE ADDRESS: )53(5 6. 2 '`i �f/E S Kane ��i� �� � v. 7:,_ , !
ASSESSORS PARCEL NO.: 4 23/(09/tZ LEGAL DESCR OTIGNr . j( v;;1 }t �,�
5
BUILDING OWNER NAME: Da.vj 6 JQrv,S
NAME: D,.i,e9 CA , )(.i/_✓il
ADDRESS: 1636. T, �`� �t'€ ay
CITY: Vert'a(t STATE: L/�` 9 nZIP: 7 .�7
PHONE: (509) 15--o2'T FAX: CELL: (5Qp)_21,5294.V
CONTACT NAME: 0A.;,;d Ockev 5
PHONE: FAX: CELL:
CONTRACTOR NAME:
MAILING ADDRESS:
CITY: STATE: ZIP: .
PHONE: • FAX: CELL:
CONTRACTOR LICENSE NO.: EXPIRES: CITY BUSINESS LICENSE NO.:
DESCRIBEITHE SCOPE OF'/WORK IN/DE IL AND INDICATE E &1PROPOSE/p' USE:
a0Y, �o 1� kakiic '/L w/-1A Cdeve1e Icor. %n 4 L E-t{� 7 -,, ,5"'it2 �Zy' 0T �AO S/
w k- 5-fera j , r' f a.7d c,o r sliop. Gild cal fo be ��i -b 5 %1 ,
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NOT APPLICABLE
Height to Peak: Dimensions: No. of Stories: Total Habitable
17 o,242r 0 f Space: 9;00 Z
Main Floor SQ FT: Upper Floor SQ FT: Unfinished Basement SQ Finished Basement SQ
-00 ./t//4 FT: (VA- FT: 414
Garage SQ FT: Deck/Covered Patio SQ Impervious Surface 30% Slopes on
/1".4 FT: .-1/1/i" Area: �r/� Property://4"
No. of Bedrooms: A/A Construction Type: Po It Heat Source: !VA Sewer or Septic: 4,//)-
TOTAL
1/'TOTAL COST OF PROJECT: $ 15 tci
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required bmitted an subsequently approved before this application can be processed.
Signature •� -��% Date: /Q I2 %Z
Updated 1-11-11 Page 1 of 1
http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Building_Permit__Residential_11-11-11.doc
RESIDENTIAL CI- 'K LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
o SITE PLAN
o Property lines and dimensions ❑ Setbacks to property lines
❑ Direction arrow pointing North and orientation to streets o Distance between buildings
o Proposed/existing buildings (footprint and dimensions) o Right of way/easement location &sizes
o Utilities, septic tank/drain field locations and distances o Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
❑ Elevations (Front/Rear/Sides)with roof peak and wall height including basement:
❑ Foundation Plan (crawlspace, basement or slab on grade):
o Footing sizes and locations o Supporting wood cripple walls or beams
o Perimeter concrete foundation wall sizes ❑ Thickened concrete pads supporting
o Crawlspace ventilation beams or girder trusses
❑ Floor Plan of each level (finished or unfinished)with dimensions:
❑ Floor Joist direction, size and spacing ❑Window and door location and sizes
o Header, beam or concrete lintel sizes o Window well locations if applicable
o Brace wall panel locations ❑ Room usage labels
o Water heater and furnace locations ❑ Smoke detector locations
o Exhaust fan locations ❑Attic and crawl space access locations
o Deck or concrete patio sizes and locations o Fire Wall construction
❑ Roof Plan:
o Engineered truss direction and spacing o Ridge, eave and valley lines
o Rafter and over frame direction, size and spacing o Beam and girder size and location
❑ Wall Section Detail including:
Roof
o Slope/roofing material/underlayment/ice dam protection o Truss or rafter size, spacing &connection
o Sheathing size and type o Attic insulation/air space baffle/ventilation
Ceiling
❑ Joist size and spacing o Size of ceiling gypsum wall board
Wall
o Height/top plate/stud size and spacing/sole plate o Siding/exterior house wrap/anchor bolts
o Exterior sheathing size and type ❑ Insulation, vapor barrier, gypsum wall board
Floor
o Joist size and spacing ❑ Sheathing or concrete floor size/insulation
Foundation Wall
o Concrete or Masonry unit width o Footing bottom to finished ground level depth
o Earth to wood separation distance o Horizontal &vertical reinforcement if any
Footing
❑ Size o Reinforcement if any
Radon
o Passive system with 6mil vapor barrier ❑Active system with 6 mil vapor barrier
Miscellaneous Construction Details
O Deck:
o Floor plan/side view/dimensions ❑ Footings/post/and beam size and locations
o Floor Joist/decking direction, size and spacing
0 Stairway tread rise & run and nosing 0 Handrail/Guard height& spacing
Residential Driveway
Sfilikane
PAVING WAIVER
....0Valley. Community Development— Planning Division
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.720.5026 ♦ Fax: 509.688.0037•planning®spokanevalley.ore
Spokane Valley Municipal Code(SVMC)Section 19.40.020.B; "All residential driveway and off-street parking areas shall be paved with
asphalt,Portland cement,grasscrete,paver blocks or other equivalent hard surface material". A paving waiver can only be granted if
the structure you are proposing is not going to require a driveway for daily use.
PART I — OWNER INFORMATION
OWNER NAME: j)u . Ck Jar r'L,,s PARCEL#: 5c2 31,c l ia7____
ADDRESS: is /.5 �. J 4vf
CITY: Cl�� as STATE: 4✓/9 ZIP: 99 ,_.� 7
PHONE: i FAX: — CELL:(5 ?J T2 of EMAIL: jArr.;5,cfli ej: I1 C0.-�
PART Il —DETAILS OF PAVING WAIVER
1. Do you have an existing garage for parking daily use vehicles? ❑ YES ® NO
2. Is the proposed detached structure used for storage only? ® YES ❑ NO
3. Do you plan on using the detached structure to park vehicles? ❑x YES ❑ NO If yes, then
what type of vehicles? / tt f ,';n/f r .56/Vz
4. Do you plan to conduct a business from proposed detached structure? ❑ YES 0 NO If so, what
is the nature of your business?
PART III —AUTHORIZATION
I,(PRINT NAME)L/ j LS ,)r rv) $ owner, hereby confirm that the information provided on this
form is true and correct. I acknowledge that any change in the foregoing conditions, could require
the City to impose paving requirements. I further agree to report any change in these conditions to
the Sp a Valle, ommunity Development Department, Planning Division, within 30 days.
/G /2 -/2_
Owner ign re Date
PART IV— DECISION
STAFF HAS REVIEWED THE PROPOSED PAVING WAIVER ON BEHALF OF THE COMMUNITY DEVELOPMENT
DIRECTOR AND FIND THE REQUEST IS GRANTED AT I5 3I S f✓ Z `Pc\JE-:- ,
SAID ADDRESS FOR PERMIT#: `/
/ 1 ChZ/?-0l2�
if/i/� /i/ iii.
Planning Division Staff Signature Date
Created 6/27/11 Page 1 of 1
0
6531s poiL
Loi = �,ocQLj
PLANNING DEPT. APPROVED
BY:
DATE: lb/i /iot .,
_ 37
House
T
�s IFPS`
ti
Project #
,20
ocT 1 2 2012
`(rbease
a ia. k �� I � ...T TER
f `
lop'
I/3
troolae
"S
d
I, •
f 9