2009, 07-17 Permit App: 09002071 RemodelProject Number: 09002071 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 7/17/2009 Page 1 of 2
Project Information:
Permit Use: FINISH BASEMENT Contact: KEVIN MADDEN
Address: 804 S SHELLY LAKE
C - S - Z: SPOKANE VALLEY, WA 99037
Setbacks: Front Left: Right: Rear: Phone: (509) 217-6700
Group Name:
Site Information: Project Name:
Plat Key: Name: Range
District: East
Parcel Number: 55202.0187 Block:
SiteAddress: 19013 E 2ND AVE
Location:: CSV
Lot:
Owner: Name: KEVIN MADDEN
Address: 804 S SHELLY LAKE
SPOKANE VALLEY, WA 99037
Zoning: R-3 SF Res District
Water District: 134 CONSOLIDATED ID #19 Hold: ❑
Area: 24,423 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information:
Review
Building Plan Review
•Rtleait&By:' s :r
Originally Released: 7/16/2009 By: tmelbourn
Permits:
Building Permit
Contractor: KEVIN MADDEN HOMES LLC Firm: KEVIN MADDEN HOMES LLC
Address: E. 10601 NIXON LN Phone: (509) 924-6497
SPOKANE, WA 99206
This Application: Total Project:
Description am Type Notes Sq Ft Valuation Sq Ft Valuation
BASEMENT R R-3 VB FINISH 0 $13,000.00 0 $13,000.00
BASEMENT
Totals: 0 $13,000.00 0 $13,000.00
Item Description Units Unit Desc Fee Amount
RESIDENTIAL PERMIT FEE 1 SELECT $223.25
WSBCC SURCHARGE 1 SELECT $4.50
SF PLNS RVW <7999 SQ FT 1 SELECT $89.30
Permit Total Fees: $317.05
Operator: JD Printed By: JD Print Date: 7/17/2009
Project Number: 09002071 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 7/17/2009 Page 2 of 2
Plumbing Permit
Contractor: KEVIN MADDEN HOMES LLC Firm: KEVIN MADDEN HOMES LLC
Address: E. 10601 NIXON LN Phone: (509) 924-6497
SPOKANE, WA 99206
Notes:
Payment Summary:
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $317.05 $317.05 $89.30 $227.75
$317.05 $317.05 $89.30 $227.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: JD Print Date: 7/17/2009
Spokane
jValley
Community Development
Residential Construction New Construction
Permit Application n Addition/Remodel
Other:
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
www.spokanevalley.org
PERMIT NUMBER: ?---2e47/
PERMIT FEE:
Accessory Bldg
Deck
SITE ADDRESS:
ASSESSORS PARCEL NO: 57.Y06 Z - D )8? LEGAL DESCRIPTION:
Building Owner:
/J,, ,,/,/
Name: recii `1 /v k) GC-' ei7 es / /c
Address: `D/ �� " ,in„, 1
E
City:. r�> /,e_���`7 Stater Zip��
Phone Fax:
1.1I '7-670
Contact Person
Name: Keut '1 M -1L////7
Phone: OW - (>-C;XX'
Describe the scope of work in detail:
Contractor:
DIMENSIONS:
Name: ,ri�!/; h Mlr h -7 A � r7t //C
TOTAL HABITABLE SPACE:
Address:40&,/ 6.-, 4/ / Sri ,44 .
2"u FLOOR SQ. FTG:
City: A,/,,1/l� /I /�� State: , t1
!/�'�
Zip:
diz.
Phone:,.50)," a v? �. Fax:
DECK/COV. PATIO SQ. FTG:
30% SLOPES ON
PROPERTY:
Contractor Lic No: E Date:
�etihA6til.„ % ,.
22 -05'
HEAT SOURCE:
S
City Business Lic. No:
Cost of Project: $
5o►5e me i 1- F;1151-1
Proposed Use:
**************The following MUST be comlete: write N/A if not applicable)**********************
p(
HEIGHT TO PEAK:
DIMENSIONS:
# OF STORIES:
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
FTG:
2"u FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
bL
53 z
IMPERVIOUS SURFACE
AREA:
FINISHED BASEMENT
SQ. FTG: /36•7 < 0 K-
GARAGE SQ. FTG:
DECK/COV. PATIO SQ. FTG:
30% SLOPES ON
PROPERTY:
# OF BEDROOMS:
-d
CONSTRUCTION TYPE:
HEAT SOURCE:
S
SEWER OR EPTIC?
�thc
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processe
SIGNATURE. -
Method of Payment:
0 Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
❑ Check
❑ Mastercard
Expires:
DATE:
❑ VISA
VIN#:
3-- Pc
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
o SITE PLAN
o Property lines and dimensions
o Direction arrow pointing North and orientation to streets
o Proposed/existing buildings (footprint and dimensions)
o Utilities, septic tank/drain field locations and distances
o Setbacks to property lines
o Distance between buildings
o Right of way/easement location & sizes
o Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
O Elevations (Front/Rear/Sides) with roof peak and wall height including basement:
❑ Foundation Plan (crawlspace, basement or slab on grade):
o Footing sizes and locations
o Perimeter concrete foundation wall sizes
o Crawlspace ventilation
❑ Supporting wood cripple walls or beams
0 Thickened concrete pads supporting
beams or girder trusses
O Floor Plan of each level (finished or unfinished) with dimensions:
o Floor Joist direction, size and spacing o Window and door location and sizes
o Header, beam or concrete lintel sizes o Window well locations if applicable
o Brace wall panel locations
o Water heater and furnace locations
o Exhaust fan locations
o Deck or concrete patio sizes and locations
❑ Roof Plan:
o Engineered truss direction and spacing
o Rafter and over frame direction, size and spacing
❑ Wall Section Detail including:
Roof
o Slope/ roofing material/ underlaymentl ice dam protection
o Sheathing size and type
Ceiling
o Joist size and spacing
Wall
o Height/ top plate/ stud size and spacing/ sole plate
o Exterior sheathing size and type
Floor
❑ Joist size and spacing
Foundation Wall
o Concrete or Masonry unit width
o Earth to wood separation distance
Footing
o Size
Radon
o Passive system with Emil vapor barrier
Miscellaneous Construction Details
O Deck:
o Floor plan/ side view/ dimensions
o Floor Joist/ decking direction, size and spacing
O Stairway tread rise & run and nosing
o Room usage labels
o Smoke detector locations
o Attic and crawl space access locations
o Fire Wall construction
o Ridge, eave and valley lines
o Beam and girder size and location
o Truss or rafter size, spacing & connection
o Attic insulation/ air space baffle/ ventilation
o Size of ceiling gypsum wall board
o Siding/ exterior house wrap/ anchor bolts
o Insulation, vapor barrier, gypsum wall board
o Sheathing or concrete floor size/ insulation
o Footing bottom to finished ground level depth
o Horizontal & vertical reinforcement if any
o Reinforcement if any
o Active system with 6 mil vapor barrier
o Footings/ post/ and beam size and locations
O Handrail / Guard height & spacing
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
permitcenter@a,sookanevalley.org
Community Development
Plumbing Permit Application
JqO 13 C 2 ad
SITE ADDRESS:
PERMIT NUMBER:
PERMIT FEE:
n Commercial
Residential
Building Owner
Name:�/�Q Phone: 4.Fax:
ilty:
Zip: yy.2 `t4
Address:4etei UNE, State: 4441
Contractor
Name: �pW I k �%1PLr`:7 `,�/' J//- Phone: l Fax:
,' JJ
�j`'�i7G7�
/
Address: `!%moi L-- • /vl h c� 41 • City: ,5,0/,4/�{ aVe State: _.4. _ Zip:' j , �,4
�/ ''
License No: rev, r7 Intl 95-y v4 City Business Lic:
Contact/Project Manager:
Name: Ail'? , / i
]n
Phone: j --7X � 7er_,
v' ! �/ j/-7...._ f /
# OF UNITS
PLUMBING FIXTURE ON A TRAP
TOILETS
/
URINALS
TUBS
SHOWERS (per trap)
SINKS
Lav/Basins, Bar, Floor, Kitchen, Laundry, Utility, Janitor, Photo, X-ray, Food,
Prep/Culinary Meat
DISHWASHER
CLOTHES WASHER
GARBAGE DISPOSAL
WATER SOFTNER
FLOOR DRAIN
Area, Case, Coil, Trench, Condensate
ROOF DRAIN/OVERFLOW DRAINS
FOUNTAIN, DRINKING
WATER PIPING/DRAIN-IN WASTE
Installation, Alterations, Repair, Reversals
WATER USING DEVICE
Ice and/or Coffee maker, hose bib, steamer proofer, carbonator, swamp cooler
PRIVATE SEWAGE DISPOSAL SYSTEM
WATER HEATER
If Gas, See Mechanical
INDUSTRIAL WASTE PRETREATEMENT
INCEPTORS
Including traps, vents except kitchen type grease interceptors functioning as fixture traps
REPAIR OR ALTERATION
Water piping, drainage or vent piping
ATMOSPHERIC TYPE VACUUM BREAKER
BACK FLOW PROTECTIVE DEVICE
Other than atmospheric type vacuum breakers
MEDICAL GAS
.
INCEPTORS
DCASH 0 CHECK 0 VISA 0 MC EXPIRES:
Card# VIN:
SIGNATURE:
CURRENT FEES AVAILABLE AT: http://www.spokanevalley.orq/ under the quick links for Forms, Master Fee Schedule.
http://www.spokanevalley.org/uploads/Common ity_Development/Documents/Forms/Qui Id ing/PlumbingPerm itAppl icati on040309. doc
j�S
Site Address: 19013 E 2ND AVE
Parcel Number: 55202.0187
Zoning: R-3
Fire District: FD 01
Project
Transmittal
City of Spokane Valley
Community Development
Department
11703 E. Sprague Ave, Suite B3
Spokane Valley, WA 99206
Phone: 509.688.0036
New projrrc 0
Pre,ious pre -app meeting 0
Plan revisions 0
Transmittal Date:
Monday, July 13, 2009
Project Number: 09002071
Water District: CONSOLIDATED ID #19
Applicant:
e-mail:
Contact:
e-mail:
Contractor:
KEVIN MADDEN
804 S SHELLY LAKE
SPOKANE VALLEY, WA 99037
(509) 217-6700
KEVIN MADDEN
804 S SHELLY LAKE
SPOKANE VALLEY, WA 99037
(509) 217-6700
KEVIN MADDEN HOMES LLC
E. 10601 NIXON LN
SPOKANE, WA 99206
(509) 924-6497
Owner: KEVIN MADDEN
804 S SHELLY LAKE
SPOKANE VALLEY, WA 99037
e-mail:
Occupant:
e-mail:
Arch / Engineer:
e-mail:
Project
Description: FINISH BASEMENT
ECEHE D
D (l `!, (fin
D �� [IL [I N
JUL
Building
Lan
Engineer
Utilities
Health
Fire Dist
Assessor
APPLICATIO
SITE PLA
PLAN
Please send all plan review and project comments via e-mail to the
highlighted individuals.
Spokane
jUalley
For City Use Only
PLUS Project Number :!
Project Address
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 • permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised ta{get date.
Your application review TARGET DATE is
A
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
> Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
• Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE
REV 9/07