Loading...
2012, 07-09 Permit: SW-12001699 Sewer SPOKANE COUNTY BUI .DINC AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12001699 07/09/2012 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: A&D CONSTION &EXCAVATION Project Name: MICA VIEW PH 1 Applicant: A&D CONSTION&EXCAVATION Permit Type: SEWER Address: 22513 E DALKE AVE OTIS ORCHARDS,WA 99027 Phone: 509-928-2621 Email: SITE INFORMATION: Site Address: 18806 E 2ND AVE Owner: WAGEMANN,CASEY J&ASHLEY M Parcel Number: 55202.0902 Address: 18806 E 2ND AVE SPOKANE VALLEY,WA 99016 Subdivision: PELLEY'S ADDITION Phone: Assessor's Description: PELLEYS ADD LT 2 BLK 2 Email: Inspection Area: Water District: Fire District:Spokane Valley Fire Consolidated Irrigation District#19 Zoning: Land Area:45501 Square Feet CONTRACTOR INFORMATION: General Contractor ADCON**099OJ A&D CONST.&EXCAVATION 22513 E DALKE RD OTIS ORCHARDS,WA 99027 509-928-2621 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $25.94 Utilities Permit $125.00 Total Fee: $150.94 CONDITIONS: Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed:07/09/2012 09:18:05 Printed by:IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12001699 07/09/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. _ INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. _ SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. _ THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME.BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed:07/09/2012 09:18:05 Printed by:IIS APPPOOL\ASP.NET v4.0