Loading...
2009, 08-26 Permit App: 09002409 Residence Project Number: 09002409 Inv: I Application Date: 8/26/2009 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: NEW SFR-SEPTIC Contact: TIMBERED RIDGE CUSTOM HOMES Address: 10063 NAVION DR C-S-Z: HAYDEN ID 83835 Setbacks:Front Left: Right: Rear: Phone: (208)772-4749 Group Name: Project Name: Site Information Plat Key: Name: Range District: East Parcel Number: 55202.0191 Block: Lot: SiteAddress: 19004 E 2ND AVE Owner:Name: LIPPINCOTT,MARC A Address: 4214 S SUNDERLAND DR Location::CSV SPOKANE VALLEY,WA 99206 Zoning: R-3 SF Res District Water District: 134 CONSOLIDATED ID#19 Hold: ❑ Area: 23,183 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review In formation: w _A :....- , Review Building Plan Review Released By: Originally Released: 8/6/2009 By: tmelbourn Driveway/Approach Released By: Originally Released: 8/26/2009 By: WMCGAV Septic Sys Review Released By: Originally Released: 8/25/2009 By: LHALSEY Landuse/Zoning/HE Conditions Released By: Originally Released: 8/24/2009 By: tschmidt Permits: � . � Operator: jmm Printed By: jmm Print Date: 8/26/2009 Project Number: 09002409 Inv: 1 Application Date: 8/26/2009 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Approach Contractor: TIMBERED RIDGE CUSTOM HMS Finn: TIMBERED RIDGE CUSTOM HMS Address: 10063 N NAVION DR Phone: (208)772-4749 HAYDEN ID 83835 Item Description Units Unit Desc Fee Amount APPROACH-CONST IN ROW 1 NUMBER OF $50.00 Permit Total Fees: $50.00 Building Permit Contractor: TIMBERED RIDGE CUSTOM HMS Firm: TIMBERED RIDGE CUSTOM HMS Address: 10063 N NAVION DR Phone: (208)772-4749 HAYDEN ID 83835 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation 1&2 FAMILY R-3 VB 1,853 $179,425.99 1,853 $179,425.99 BASEMENT U R-3 VB 1,869 $28,035.00 1,869 $28,035.00 COV DECK R-3 VB 291 $4,365.00 291 $4,365.00 GARAGE U-1 VB 990 $18,810.00 990 $18,810.00 Totals: 5,003 $230,635.99 5,003 $230,635.99 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $1,727.35 WSBCC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT 1 SELECT $690.94 Permit Total Fees: $2,422.79 Septic designed for 3 bedrooms. Payment Summary: .. . . . .. Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Approach $50.00 $50.00 $0.00 $50.00 Building Permit $2,422.79 $2,422.79 $681.98 $1,740.81 $2,472.79 $2,472.79 $681.98 $1,790.81 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 8/26/2009 Staff Use Or y) ��� GUY °Fkane ! PERMIT NUMBER: PERMIT FEE: CITY OF SPOKANE VALLEY Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 AUb 0 4 LOU Tel: (509) 688-0036 Fax: (509) 688-0037 r'f_si" permitcenter a@ spokanevalley.oro BY: RESIDENTIAL CONST ' TION PERMIT APPLICATION /1 NEW CONSTRUCTION 0 ADDITION/REMODEL 0 ACCESSORY BUILDING 0 DECK 0 OTHER SITE ADDRESS:19004 E. 2ND,SPOKANE VALLEY WA ASSESSORS PARCEL NO.:6520279359 LEGAL DESCRIPTION:NW1/4 OF THE NW1/4 SEC 20 T25N, R45 E LOT 3 r5c3aUa. Mc' \ BUILDING OWNER NAME:MARC LIPPINCOTT NAME:MARC LIPPINCOTT ADDRESS:2411 S. CANYON WOODS LN.#301 CITY:SPOKANE STATE:WA ZIP:99224 PHONE: FAX: CELL:509.994.8135 CONTACT NAME:JEREMY TRIPP PH0NE:208.772.4749 FAx:208.762.6376 CELL:208.818.4843 CONTRACTOR NAME:TIMBERED RIDGE CUSTOM HOMES MAILING ADDRESS:10063 NAVION DR. CITY:HAYDEN STATE:ID ZIP:83835 PHONE:208.772.4749 Fax:208.762.6376 CELL: CONTRACTOR LICENSE No.:TIMBERC91 OJ4 EXPIRES:04/24/11 CITY BUSINESS LICENSE No.:602916803 DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE: TO CONSTRUCT NEW RESIDENTIAL HOME FOR THE PURPOSE OF PRIMARY RESIDENCE ON DWELLING. THE LOT IS RAW GROUND AT THIS POINT. PROPOSED USE: FffertivP f)rtnhPr 7R. 7lf17 Pana 1 of 3 7_ 2<lio 7 ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE. Height to Peak: Dimensions: No. of Stories:1 Total Habitable Space:3722 Main Floor SQ Upper Floor SQ Unfinished Basement Finished Basement FT:1853 016- FT: _ SQ FT:1869 J t`- SQ FT: Garage SQ FT:�g1- Deck/ overed PatioTh Impervious Surface 30010 Slopes on q90 SQ FT: / Area:3406 Property: No. of Bedrooms:3 Construction Heat Source:GAs Sewer or Type: Septic:sEPTIC TOTAL COST OF PROSECT: $200000.00 DISCLAIMER The permitted verifies,acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transactio -4) All construction Is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available = review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violati.- of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequen -pproved before this application can be processed. Signature _ Date: `�/c9 10? Method of payment: I . ® Check 0 Visa 0 Mastercard Bankcard #: EXP: VIN#: Authorized Signature: Fffpctive f ctnhar 7R 7ln7 Pana 3 of 3 CITY OSpolian Development Engineering Milley 11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.1000 ♦ Fax: 509.921.1008 ♦ cityhall@spokanevalley.org Approach Permit Application Review TO: Building Department Site Address: 19004 E. 2"d Avenue Project No: 9-2409 Accepted Not Accepted Approach X Building Location Paved Access Notes: Saw cutting of existing curb is not allowed within the City's jurisdiction. Driveway is to be inspected by the City's ROW Inspector prior to concrete placement. Reviewed By: Pr e,12,-/4.-9‘--4.---<— Date: g/z��7 08/25/2009 14:31 FAX 2087626376 JESSICA (G 04 Cf1]002/002 Community Development Department (staff Use Only) Permit Center Sfilikane 11703 East Sprague Avenue,Suite 8-3 PERMIT NUMBER: Spokane Valley, WA 99206 Tel: (509) 688-0036 PERMIT FEE: 40.00Valley Fax: (509)688-0037 permitcentertbspokaneval ley.orq APPROACH PERMIT APPLICATION PROJECT ADDRESS:19004 E.2ND, SPOKANE VALLEY WA START DATE: °lb ANTICIPATED COMPLETION DATE: el jid109 BUILDING OWNER NAME: 4(k4rG jiipT;n co-H- ' MAILING ADDRESS:241 I S.CANYQNE WOODS LN#301 Cm:SPOKANE STATE:WA ZIP:99224 CONTACT PERSON NAME:JEREMY TRIPP PHoNE:208-772-4749 Fax:208-762-6376 CELL:208-818- 4843 CONTRACTOR NAME:TIMBERED RIDGE CUSTOM HOMES MAILING ADDRESS:10063 NAVION DR. Cm:HAYDEN STATE:ID ZIP:83835 PHONE:208-772-4749 FAX:208-762-6376 CELL:208- 818-4843 CONTRACTOR LICENSE No.:TIMBERC910J4 ExPIREs:04/24/11 CITY BUSINESS LICENSE No.:602916803 PROJECT DESCRIPTION (Please Provide Site Sketch) NI Residential Driveway Commercial/Industrial Driveway Existing Curb &Gutter Rural Road Section El Culvert Installation ! Sidewalk Repair/Construction Ea Other Conditions: Bond/Insurance certification must be on file with the City. PISCLAIMER The permitted verifies,acknowledges and agrees by their signature that: 1)if this permit Is for construction or on a dwelling,the dwelling is/will be served by potable water. 2)Ownership of this City of Spokane Valley permit Inure to the property owner. 3) The signatory Is the property owner or has permission to represent the property owner In this transaction. 4) All construction Is to be done in full compliance with the City of Spokane Valley Development code. • -rented codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a p-• or approval for any violation of federal,state or local laws,codes or ordinances. 6) Plans or additional information may be required t. •e submitted and subsequently approved before this application can be processed. Signature Date:8/26/09 Method of p- - t: 0 Cash ® Check 0 Visa 0 Mastercard Bankcard . EXP: VIN# Authorized Signature: Fffprtivp OrtnhPr?R 7f107 Poi 1 of 1 ■.. [al/25/2009 14:31 FAX 2087626376 JESSICA I001/002 ■ ■ ■ II IN • M▪ I 1006) Navion Dr. IN hayden, ID 8')835 3 i L .. — _ l 7 • ..� Phone: (208)772•-4749 I l ` ( t. f, rax:(208) 762-6376 }.__11 A `;�,_i:� ¢........,. • carly@timberedridge.com To: A. rrom: Cary Jost rax: cJ 01. 00. 100 8, rages: Phone: . K10 rate: 12s 1 D9 KC: UPPInC1:41 a�t't4G ([ ?4(n�,�-� CC: ❑Urgent 0 for Review ❑ Please Comment 0 Please Reply ❑'lease Recycle •Comments: flux k s Ca,QL Jodie. V I etAlrue_c l a-it. n-9- Id Int k-rat.0 'tea_ cutiftviin -2ISt, WPI(I Ix I Clabi Carly Jost Construction Coordinator For City Use,Only CITY OF PLUS Project Number _'V C.% 9 oKane Project Address ! T c i'l 4- -""p 40•00 Valley® 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date,we will contact you with a revised target date. Your application review TARGET DATE is /J i The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal.This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax,email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07 I w RESIDENCE FOR THE LIPPINCOTT FAMILY oz o L, GENERAL NOTES w; U O 'o N 1. CONTRACTOR SHALL VERIFY DIMENSIONS BEFORE STARTING WORK AND ¢, 2 m z REPORT ANY DISCREPANCIES TO THE OWNER. v m $ "J 2. CONSTRUCTION SHALL CONFORM TO THE FOLLOWING CODES: �\ea t'-1 0 A. 2006 INTERNATIONAL RESIDENTIAL CODE (EXCEPT MECHANICAL & ELECTRICAL SECTIONS.) o B. 2006 INTERNATIONAL BUILDING CODE. . - , S 89 59'43"E 162.60' C. 2006 INTERNATIONAL MECHANICAL CODE. o D. 2006 INTERNATIONAL FUEL GAS CODE. �.� o p p 9 p0, E. 2006 INTERNATIONAL ENERGY CONSERVATION CODE. ' I 3. CONCRETE FOR BASEMENT SLAB & BASEMENT WALLS TO BE 3500 PSI, U] OTHER CONC SHAH REACH 2,500 P S I STRENGTH IN 28 DAYS. a w 4. CONCRETE SHALL BE MACHINE OR BATCH PLANT MIXED, 1:2 1/2: z ! 3 1/2, WITH 7 1/2 GALS OF WATER PER SACK OF CEMENT. DRIVEWAY AND 5. REINFORCING STEEL TO BE INTERMEDIATE GRADE, DEFORMED AND O - FIRE DEPT TURNAROUND 0 - CONFORMING TO ASTM A-615 AND A-305. I SEE CIVIL DRAWINGS I 6. MINIMUM LAP FOR REBAR TO BE 20 DIAMETERS OR 1'-6". 0 W PAVE TO 2ND STREET 7. MINIMUM PROTECTIVE COVERAGE FOR REBAR IN CONCRETE AGAINST s EARTH TO BE 3". MIN_ COVERAGE AT SLABS TO BE 3/4". H E_ 8. WELDED WIRE FABRIC TO CONFORM TO ASTM A-185 w 9. LUMBER TO BE GRADED,DOUGLAS FIR #2 OR BETTER, UNLESS OTHERWISE NOTED. I C 10 LUMBER IN CONTACT WITH CONCRETE SHALL BE TREATED. - 11 JOISTS, RAFTERS AND BEAMS TO BE OF #2 GRADE UNLESS NOTED. w co 12 PLYWOOD NOTES: I '(``g' I A DOUGLAS FIR PSI 74_ - j j - B STAGGER ALL JOINTS. - VS¢ C ROOF, WALL AND FLOOR PLY TO BE EXTERIOR GRADE WITH 30 .p v I EXTERIOR GRADE GLUE. ch ., D PLY NAILING TO BE ON ACCORDANCE WITH SHEAR NAILING >- `?p' I REQUIREMENTS OF THE CITY. I0 'in '9.5p' _ 13 SPLICE WALL TOP PLATES WITH 4'-0" LAPS, SPIKED WTH 8 16D n - <4' NAILS, EACH SIDE OF JOINT. U) 8 I oCC L.J I 14 CROSS OR SOLID BRACE ROOF TRUSSES AT 10'-0" 0 C. I- a - r - 15 SOLID BLOCK AT EACH SUPPORT AND UNDER WALLS. 1 8 m vi - 16 BRACE EXTERIOR WALLS WITH 7/16" OSB. SHEAR NAILED. H < m I I 17 PROVIDE FIRE BLOCKING AT STUD WALLS AT 8'-0" OC. H �`' = STUD WALLS (EXTERIOR) i0 BE 2X6" AT 16" O.C. UN D, (INTERIOR) TO BE w i o p-P... �• F w i a p I 2X4" AT i6' O.0 LINO. WALLS AT PLUMBING & HEATING TO BE 2X6". WALLS o 'L>8'. <}2` _ OVER 14'-0" HIGH TO BE 2X6" AT 16" O.C_, IF ANY. C i o s 4 e` QOM - 19 PROVIDE 1" MIN. CLEARANCE AROUND FIREPLACE CHIMNEY WOOD FRAMING: } �O4 I 20 BRACE ROOF TRUSSES AS REQUIRED BY TRUSS ENGINEERING. w 0 Q 21 SMOKE DETECTORS SHALL BE INSTALLED PER CODE AND I- ZOPe I HARD WIRED TO ELECTRICAL SYSTEM WITH BATTERY BACKUP. p o 0 0 _ 22 PROVIDE AND INSTAL WHOLE HOUSE ATTIC FAN TO CODE REQUIREMENTS. I PQE 23 CONSTRUCT UNDERSLAB RADON MITIGATION PER DRAWING R-01 o - N n �I 00 : fir. Q 0� \\\\\\ pOENERGY CONSERVATION: zIn 1 - 1. EXTERIOR WALLS TO BE INSULATED WITH MINERAL OR GLASS FIBER TYPE BATTS WITH R VALUE OF NOT LESS THAN R-21. 10` 6 (N 2. SCISSOR ROOF TRUSSES TO BE INSULATED WITH APPROVED TYPE MATERIAL TO R VALUE OF NOT LESS THAN 30 AND NOT LESS THAN 38 IN FLAT TRUSSES.BASEMENT WALLS R-21 INTERIOR & R-12 EXTERIOR, UNDERSLAB R-10.26'-5" - 3. SWING DOORS TO THE EXTERIOR AND TO UNCONDI1ONED SPACES TD W \CN wHAVE WEATHER STRIPPING AND THRESHHOLDS TO LIMIT AIR INFILTRATION. APPROX LOCATION DFSETUP 4. SLIDING GLASS DOORS AND WINDOWS SHALL BE CERTIFIED TO SHOW UNDERGROUND UTILITIES— _- I 03COMPLIANCE WITH AIR FILTRATION STANDARDS OF THE 1972 AMERICAN <14 zz NATIONAL STANDARDS INSTITUTE A-134.1,A-134.2,A-134.3 AND _ A-134.4 DOORS TO BE GLAZED WITH SAFETY GLASS. E-+ 10'-0" 2D'-0" I U-VALUE OF DOORS AND WINDOWS TO MINIMUM CITY STANDARDS. SEE WWW.EN ERGY.WSU.ORG _ 5. HEATING AND COOLING DUCTS OUTSIDE THE BUILDING ENERGY O }+ ENVELOPE SHALL HAVE JOINTS AND SEAMS SEALED AND SHALL BE W e �� G 102.00 I INSULATED WITH A MIN. OF 1" FIBROUS INSULATION. �7 _m 0 ��`� lOp?5 1D\ f = O 6. A. THE BUILDING DESIGN MEETS THE CITY ADOPTED ENERGY STANDARDS Z d m O I vQ' o Jh I Q 8. INSULATION INSTALLER SHALL POST IN A CONSPICUOUS LOCATION IN '•' 9 <\ '1� _ THE BUILDING A CERTIFICATE SIGNED BY THE INSTALLER AND BUILDER (Zi - it _ ` h O ,00•. STATING THAT THE INSTALLATION CONFORMS WITH GOVERNING REQUIREMENTS p.l W - `� • v,�� `\\N ` I C. ALL INSULATION MATERIALS SHALL BE CERTIFIED BY THE I-1 Z a <cF' MANUFACTURER AS COMPLYING WITH NATIONAL FIRE RATING QUALITY a Q' c 6'X6'X70' DEEP \ �� STANDARDS FOR INSULATING MATERIAL. .Y. m UNDERGROUND SUMP FOR \•� �C I D. DOORS AND WINDOWS BETWEEN CONDITIONED AND OUTSIDE OF CD FOUNDATION DRAIN `� \`` P'C`0 _ UNCONDITIONED SPACES. SUCH AS GARAGES AND COMPARTMENTS FOR WP- " FILLED W/#1 ROCK ``\\ Q I CENTRAL AIR GAS FURNACES SHALL BE FULLY WEATHER STRIPPED. Z to c `, p'4-' E. CAULK PLUMBING AND ELECTRICAL PENETRATIONS, ALL WINDOW AND �` 10_` QQ� DOOR FRAMES,BETWEEN WALL SILL PLATES AND FLOORS AND ALL v .4\.\\\ P I OTHER OPENINGS IN THE ENVELOPE. 39-7" `\ ` •Co = B. BACKORAFT DAMPERS FOR ALL EXHAUST AND FAN SYSTEMS SHALL a' W z Ppb I BE PROM DED. - 0 a o �, p��9�� P�(S' oe o LEGAL u' U) GOQ• eJ�� 6y' THE GREENACRES SUBDIVISION A o 9 p • / I NW 1/4 OF THE NW 1/4 SEC 20 725N, R45 E Z " do PF ^ a LOT 3. PARCEL NUMBER 55202.0189 Z 0 q 9 = W W `a I 9jti 9 ` Q n N A po _ I PROJECT INFORMATION Q W o PLANNING DEPT. 'PROVED 1/1/0„,..�� HOUSE LIVEABLE AREA: S.F. E� GD W .• .. -- 2.818 S.F.s.F. W CID w I 'y GAR AG Bi S.F. N - - - .-I F I • I I 1\ SITE AREA: 23,184 S.F. N BY. lir1 W E I DRAWING N E �o a A NGI D X Y I F = 1-01 SITE PLAN & NOTES z�m . w DATE. f"" /�T 2-00 FOUNDATION 6.c FLOOR FRAMING PLANS o I 2-01 BASEMENT PLAN 2-02 GROUND FLOOR PLAN Q,rm 2-03 ROOF FRAMING PLAN =82 2-04 ROOF PLAN 3-00 EXTERIOR ELEVATIONS 11 1g 3-01 EXTERIOR ELEVATIONS s 9 3-02 BUILDING SECTIONS _ 4-00 DETAILS AND SECTIONS Ort R-01 RADON MITIGATION PLAN L # .6'0- S 90 00'00" W 162.60' 1. i