2014, 06-02 Permit App: APR-2014-0041 Approach Community Development Department (Staff Use Only)
CITY Permit Center j "i 4 I
Spokane 11703 East Sprague Avenue,Suite B-3 PERMIT NUMBER: Y L (�!
Spokane Valley,WA 99206 -�
Q x Tel:(509)720-5240 PERMIT FEE: .' ti
�,,. Valley Fax:(509)688-0037
permitcenter a,spokanevalley.org
APPROACH PERMIT APPLICATION
PROJECT ADDRESS: /�O/7
�J 27wC -ee 11c5 j
START DATE: / �. /% ANTICIPATED COMPLETION DATE:
BUILDING OWNER NAME: 7-11-72-4
1/'✓1
MAILING ADDRESS: i I/1/4 L� k
CITY: STATEN
CONTACT PERSON NAME:
PHONE:
FAX: 1 CELL: is
CONTRACTOR NAME: r'C 7 " C i'1/' - 4 2)'5 ':�7'/''/
- L7 L)',r /
MAILING Z� Q
2 /
CTTY.-�i+ec?67 / .//'�5 STATE: ` ,,y .....
PHONE: `j 'Pin gta7) FAX: / / `r CELL:
CONTRACTOR LICENSE#: 66 3 2 Y-2 2/ EXPIRES: /4:96(l 5l 2 N5/ CITY BUSINESS LICENSE#:
PROJECT DESCRIPTION(Please Provide Site Sketch)
ID Residential Driveway El Commercial/Industrial Driveway
' Q Existing Curb&Gutter El Rural Road Section
Culvert Installation li Sidewalk Repair/Construction
® Other Conditions:
Bond/Insurance certification must be on file with the City.
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the
dwelling is/will be served by potable water. 2)Ownership of this City of Spokane Valley permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of
Spokane Valley Permit Center.5) The City of: okane Valley permit is not a permit or approval for any violation of federal,state or
local laws, codes or ordinances. 6) Plans o a 1 ditional information may be required to be submitted and subsequently approved
before this application can be processed
Signature
Date: 64._ //
DE-001:V-1 Page 1 of 2
APPROACH PERMIT APPLICATION
REQUIRED SKETCH INFORMATION
Provide required measurements(in sketch boxes),and include street name.
Check all existing conditions that apply:
[]Sidewalk 2. Drainage Ditch
ft wide tDrywell(show location on sketch)
ft from back of curb Mether(please describe below)
L Streetside Swale
L
DISTANCE FROM
z, NEAREST PROPERTY LINE
MAY BE LEFT OR RIGHT SIDE)
Li FT(SEE TABLE)
aI
�i
a` coNCRE
APPROACH CURB
RETURN
{-4'--j THRO 1`WIDTH OFT--�•-4'
CURB WING (SEE TABLE) WING NIIF CORNER LOT,
DISTANCE FROM
STREETNAME CURB RETURN
nFT(SEE TABLE)
STREET WITH CURB
L i DISTANCE FROM
z NEAREST PROPERTY LINE
MAY BE LEFT OR RIGHT SIDE)
I 211 FT(SEE TABLE)
i
a 15'RADIUS
o
ASPHALT RADIUS
o_ APPROACH RETURN
I---THROAT WIDTH MI FT--I � n�� 7
EDGE OF (SEE TABLE) IF CO'SER
/�k".-�
ASPHALT aT, ' •'�,
� C,(
DIST CE'ROM •
STREET NAME ' - '- % US RE •: i
FT(SEE TABLE)
STREET WITH ASPHALT EDGE
Approach Requirements:
• Maximum 2 approaches per property frontage;one on arterials.
• Total width of approaches not to exceed 50%of frontage width.
Residential Approaches Commercial
Approaches
Distance from Curb/Radius Return 15'minimum 75'minimum
Separation between Approaches(measured from centerline to centerline of See Page 7-27
each approach) None specified in City Street Standards
Throat Width(flat portion) 16'min.,30'max. 30'min.,40'max.
Wing Width(at curb line) 4 feet typical 4 feet typical
Minimum Distance from Side Property Line(@ r/w) 5.0' 5.0'
Minimum Distance from Crosswalk 5' 5'
DE-001:V-1 Page 2 of 2
stiaisassie- vb.
t `
U"
441
-do`
OCI