Loading...
2012, 11-13 Permit: SW-12002542 Sewer SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12002542 11/13/2012 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: FOLSOM EXCAVATING INC Project Name: M &W SUBDIVISION/SUB-02-11 Applicant: FOLSOM EXCAVATING INC Permit Type: SEWER Address: 16701 E VALLEYWAY AVE VERADALE,WA 99037 Phone: 509-891-1232 Email: SITE INFORMATION: Site Address: 19019 E 2ND AVE Owner: LNL HOMES, LLC Parcel Number: 55202.0188 Address: 210 N UNIVERSITY RD STE 300 SPOKANE VALLEY,WA 99206 Subdivision: CORBIN ADDITION Phone: Assessor's Description: SHP-05-05: LOT 4 (AFN 5552734) Email: Inspection Area: Water District: Fire District:Spokane Valley Fire Consolidated Irrigation District#19 Zoning: Land Area:24424 Square Feet 41 CONTRACTOR INFORMATION: Project # lJ 6/—i?—?c99 General Contractor RECEIVED FOLSOE1994D0 FOLSOM EXCAVATING INC 16701 E VALLEYWAY AVE NOV 1 5 2012 VERADALE,WA 99037 509-891-1232 CSV PERMIT CENTER SUB # l _F\/ I DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $25.94 Utilities Permit $125.00 Total Fee: $150.94 CONDITIONS: Inside Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 11/13/2012 12:45:37 Printed by:IIS APPPOOL\SmartGovProdApp SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12002542 11/13/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 11/13/2012 12:45:37 Printed by:115 APPPOOL\SmartGovProdApp . . . . . I I 1 /' 1 :----- ---t----oir-.--4L l0.-r i 1 1 I 1 )44 I . . •=_- . • gV/ is4411 1 *?,,,,12.1 II of I . ., _fxr5:710-011 --.Aro*. • 1 . . f / ' I 1 C. • - It- 1 /1 I' , - 144 Lipit$PAG _ - ,91 FlLtUi*P? 1 1 IA ,, A *, ----if viola __! ii — • --1g er?6 •Ert H ---:-f • - - 1 ,---- z.17?. . PIPPRTIEV I iP 414*.pul . i • Id iftli-h-r 1 -.1 : I Piptetki+r ...----- oc- -- t-- _._ 4/ /- -7 g4141-&--- ------7-- --7- -- -,e ---__: doretvoi 1 4 . ft)-60P j(0.5,1; :11 . Evro6 & ititAtolt.tr -. PO AV roiect #...aid-,J2._:zaii._ . NOV 1 5 2012 1,4 o 1 CSV PERMIT CENTER • , 111--11-01--04 .