Loading...
2015, 01-29 Permit App: APR-2015-0001 Approach Community Development Department (Staff Use Only) Permit Center SlariPOCIali 11703 East Sprague Avenue,Suite B-3 PERMIT NUMBER: 71c 23/5 C7 Spokane Valley,WA 99206 40— V + Tel:(509)720-5240 PERMIT FEE: 1 7 ,O'O Fax:(509)688-0037 permitcenter(iispokanevalley.org APPROACH PERMIT APPLICATION PROJECT ADDRESS: / 9 40 1 On d START DATE: ®/ ANTICIPATED COMPLETION DATE: 4 BUILDING OWNER AME: F/)w 4 cjjS MAILING ADDRESS: CITY: STATE: ZIP: CONTACT PERSON NAME: PHONE: FAX: /' / CELL: CONTRACTOR NAME: gJV`'l h cr)lam) �� 6 S 1°! 1 _fry MAILING ADDRESS: /2 4-o2 N J)1 v/ L o,v 4 5z 7"— CITY: 0��'N�'_- STATE: WA_ ZIP: 9 9 2/ r PHONE: _co 9 g.79 FAX: l CELL: CONTRACTOR LICENSE#:JCS CS/-/iJS .1/4_Ii xPIRES: /// j/f CITY BUSINESS LICENSE#: PROJECT DESCRIPTION(Please/// Provide Site Sketch) Residential Driveway Q Commercial/Industrial Driveway 0 Existing Curb&Gutter 0 Rural Road Section 0 Culvert Installation Q Sidewalk Repair/Construction Other Conditions: Bond/Insurance certification must be on file with the City. DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2)Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. Z ^.Z a 5"cn ty Signature s ; F C F R V F D Dote: % L l4— " - 4 1. 1., _; S`tV PEP.UT .;EEN\ITEP DE-001:V-1 ( _0 _ _: ..- .- i Page 1 of2 APPROACH PERMIT APPLICATION REQUIRED SKETCH INFORMATION Provide required measurements(in sketch boxes),and include street name. Check all existing conditions that apply: Sidewalk DDrainage Ditch ft wide Drywell(show location on sketch) ft from back of curb .Other(please describe below) OStreetside Swale w; DISTANCE FROM NEAREST PROPERTY LINE MAY BE LEFT OR RIGHT SIDE) FT(SEE TABLE) wl / idi CONCRETE l---7--__-------'--'------ ' URB APPROACH ETURN ' THRO[EEITH `'CURB' NGTABLE) WING CORNER LOT, DISTANCE FROM STREET NAME CURB RETURN n FT(SEE TABLE) STREET WITH CURB w i DISTANCE FROM z'- • NEAREST PROPERTY LINE D' MAY BE LEFT OR RIGHT SIDE) 1; ped FT(SEE TABLE) i di 15'RADIUS ASPHALT RA DI US o_I APPROACH RETURN EDGE OF 1—THROAT WIDTSEE H 7 FT--I E) ASPHALT IF CORNER LOT, DISTANCE FROM STREET NAME d n d RADIUS RETURN Q FT(SEE TABLE) STREET WITH ASPHALT EDGE Approach Requirements: • Maximum 2 approaches per property frontage;one on arterials. • Total width of approaches not to exceed 50%of frontage width. Residential Approaches Commercial Approaches Distance from Curb/Radius Return 15'minimum 75'minimum Separation between Approaches(measured from centerline to centerline of See Page 7-27 each approach) None specified in City Street Standards Throat Width(flat portion) 16'min.,30'max. 30'min.,40'max. Wing Width(at curb line) 4 feet typical 4 feet typical Minimum Distance from Side Property Line(@ r/w) 5.0' 5.0' Minimum Distance from Crosswalk 5' 5' DE-001:V-1 Page 2 of 2