Loading...
1437TH AVENUE. Vj - -, ,'N UE tst 0 C) C> CD ­4 1 1-4 C) C) + U 0 CL N89*47'53"W "INARMIAWA LEGEND STANDARD NOTES FOR CONSTRUCTION 1) All work and materials shall be in conformance with the "SPOKANE COUNTY STANDARDS Project Site Property Line Pfuli, ujtu luvmzstrut� Ltvii, mumtuFjuitut-,, uitu up9luuIlly VF Ltm L-1\, tU%,11JL1 \Jjiz; t'lur; of the Developer until all construction is completed and accepted by Spokane County, or until vegetation is established throughout the site, and accepted by Spokane County, whichever is later. Other Parcel Lines (approx.) 9) Approval of the ESC plan does not constitute approval of any of the proposed road, storm Existing Ground Contour (1' intervals) drainage, grading or utility design elements shown on the ESC plan. House: Existing (approx. location) 10) The erosion /sedimen tation control measures shown are the minimum requirements for the daily, anticipated site conditions. The Contractor shall inspect and maintain these ESC measures or Proposed (assumed) and shall maintain and upgrade these measures as necessary to prevent sediment—laden water from either flowing off the site, or into new/existing storm drainage facilities, such as drywells, culverts, BUILT F -VISIONS or g ravel g alleries. AS "INARMIAWA LEGEND STANDARD NOTES FOR CONSTRUCTION 1) All work and materials shall be in conformance with the "SPOKANE COUNTY STANDARDS APPLICANT/DEVELOPER'S APPROVAL TYPE OF IMPROVEMENT: DRAINAGE PROJECT NUMBER SHEET NUMBER 14470 2 OF 3 DATE Project Site Property Line Pfuli, ujtu luvmzstrut� Ltvii, mumtuFjuitut-,, uitu up9luuIlly VF Ltm L-1\, tU%,11JL1 \Jjiz; t'lur; of the Developer until all construction is completed and accepted by Spokane County, or until vegetation is established throughout the site, and accepted by Spokane County, whichever is later. Other Parcel Lines (approx.) 9) Approval of the ESC plan does not constitute approval of any of the proposed road, storm Existing Ground Contour (1' intervals) drainage, grading or utility design elements shown on the ESC plan. House: Existing (approx. location) 10) The erosion /sedimen tation control measures shown are the minimum requirements for the daily, anticipated site conditions. The Contractor shall inspect and maintain these ESC measures or Proposed (assumed) and shall maintain and upgrade these measures as necessary to prevent sediment—laden water from either flowing off the site, or into new/existing storm drainage facilities, such as drywells, culverts, Proposed Concrete Curb or g ravel g alleries. 11) The Contractor/Developer is responsible for installing Rock Construction Entries at any and all Proposed Conc. Curb Inlet locations used to enter or exit the project site. Proposed Drainage Swale Floor 12) Geotextile fabric is to be placed on the rims of drywells, catch basins and inlets until such time the vegetation on the site is established and the threat of sediment deposition into the drainage system Proposed Drywell is miti APPLICANT/DEVELOPER'S APPROVAL TYPE OF IMPROVEMENT: DRAINAGE PROJECT NUMBER SHEET NUMBER 14470 2 OF 3 DATE