Loading...
2015, 01-29 Permit App: BLD-2015-0165 Storage Bldg f:::"...p -2-0(6.--t)1-45 Community Development Departmen R E ff\PP 9nly) Permit Center j 11703 East Sprague Avenue, Suite B-c PERMIT N BE Wane alley, WA Tel:k 509SpoaneV720-52 099206 PE JAN 2 9' ib Vaileyg Fax: (509) 688-0037410 ^. permitcenter@sookanevallev.org CSV PERMITCE" TER R SUB # 11111111 FEV. ,= RESIDENTIAL CONSTRUCTION PE ' • A ' ' CATION 0 NEW CONSTRUCTION 0 ADDITION/REMODEL 0 ACCESSORY BUILDING DECK i OTHER SITE ADDRESS: 14O I G E. ASSESSORS PARCEL NO.: LEGAL DESCRIPTION: OWNER/APPLICANT (CHECK BOX,IF MAIN CONTACT 0): NAME: 4)--lL m, g o e,.,�„� ADDRESS: C 01 g E. ; '—j4 CITY: Sie 6/W .1 4/44j/'f_fr STATE: ahr ZIP: 19P./p./4 PHONE: So /114 q s1-7 t FAX: EMAIL: CONTACT NAME: S a e PHONE: FAX: EMAIL: CONTRACTOR NAME (CHECK BOX,IF MAIN CONTACT❑): MAILING ADDRESS: $SI/P\-.1_ CITY: STATE: ZIP: PHONE: FAX: EMAIL: CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Height to Peak: I Dimensions: . d , No. of Stories: Total Habitable 1 3 k 4 e j Space: Main Floor SQFT• Upper Floor SQ FT: Unfinished Basement SQ Finished Basement SQ 13 3 G FT: FT: Garage SQ FT: Deck/Covered Patio SQ Impervious Surface 30% Slopes on FT: Area: Property: No. of Bedrooms: Construction Type: Heat Source: Sewer or Septic: TOTAL COST OF PROJECT: $ (0, 000 DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling Is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction Is to be done In full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit Is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be uired to be submitted and subsequently approved before this application can be processed. Signature _ Date: Gj/(,S RESIDENTIAL BUILDING PLAN CHECKLIST D. e ❑ SITE PLAN (2 COPIES): Refer to Residential Site Plan Guide 40000ValleYe ❑ MECHANICAL&VENTILATION FORM (2 COPIES): Available at www.spokanevalley.org ❑ BUILDING PLANS (2 SETS): Drawn/drafted to scale with the information described below, as applicable: (2012 International Residential Code references included in italicized text) ❑ ELEVATIONS 0 FLOOR PLAN of each level: ❑ Show front/rear/sides of proposed building ❑ Identify finished or unfinished areas ❑ Identify roof peak and wall height(incl. basement) ❑ Identify dimensions of each room ❑Window&door location &sizes R310/R311 ❑ FOUNDATION PLAN ❑Window well locations, if applicable R310.2 ❑ Identify crawlspace, basement or slab on grade ❑ Label use of each room/area ❑ Footing sizes and locations R403.1.1 ❑Water heater location Chapter 24 ❑ Horizontal &vertical reinforcement R404.1.2.2 ❑ Furnace location M1401/Chapter 24 ❑ Supporting wood cripple walls or beams R602.9 ❑ Smoke/CO detector locations R314/R315 ❑ Concrete foundation wall sizes R404.1.2 ❑Whole house ventilation location R303/M1507.1 ❑ Concrete pads supporting beams or girder trusses ❑ Exhaust fan locations R303/M1507.I ❑ crawlspace ventilation R408 ❑Attic/crawl space access locations R408.4/R807.1 ❑ Radon mitigation system IRC Appendix F ❑ Deck or concrete patio sizes and locations ❑ Fire resistant wall construction R302.6 ❑ Braced wall panel locations/method R602.10 ❑ FLOOR FRAMING PLAN of each level: ❑ Floor joist direction, size and spacing R502.3 0 MISCELLANEOUS CONSTRUCTION DETAILS ❑ Header, beam &concrete lintels R502.5/R611.8 Decks/Patios ❑ Floor plan with dimensions O ROOF FRAMING PLAN ❑ Elevations (front-and side-view) ❑ Eng. truss direction/spacing/connection R802.10 ❑ Footings/posts/beam size and locations R403.1.1 ❑ Rafter direction/spacing/connection R802 ❑ Joist/decking direction/size/spacing R502.3 ❑ Overframing R802 ❑ Fasteners/attachment to structure R507.1 ❑ Ridge, eave and valley lines O Header/girder/beam sizes and locations R502.5 Stairways (interior and exterior) ❑ Roof and ceiling slope ❑ Stair tread rise/run/nosing dimensions R311 ❑ Roofing/underlayment/ice dam protection R901.1 ❑ Handrail height and picket spacing R311.7.8.1 ❑Attic insulation/baffles/ventilation R806.1 o Guard height and picket spacing R312 ❑ BUILDING CROSS-SECTION DETAIL showing: 0 ENERGY CODE PACKET o Roof ❑ download WA State Energy Code worksheets at: ❑ Ceiling www.wsu.edu/BuildingEfficiency/EnergvCode.aspx ❑Wall ❑ Prescriptive/Component Performance worksheet ❑ Floor(s) ❑ Glazing (window/skylight) schedule worksheet ❑ Foundation Wall ❑ Heating system sizing worksheet o Footing HELPFUL LINKS WHEN PREPARING YOUR CONSTRUCTION PLANS: -International Code Council free eCode access: http://publicecodes.cyberregs.com/icod/index.htm -Washington State Building Code Council: https://fortress.wa.gov/qa/apps/sbcc/Page.aspx?nid=14 -Spokane Valley Municipal Code: http://www.codepublishinq.com/wa/spokanevalley/ • Project RECEIVED Residential Driveway Spokane JAN 2 9 2015 PAVING WAIVER Valley Community Development— Planning Division SV PERMIT CENTER 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.720, 026 ♦ Fax: 509.688.0037•planning®sookanevallev.org SUB # 1 1 REV. #, Spokane Valley Municipal Code(SVMC)Section 19.40.020.8; "All residential driveway and off-street parking areas shall be paved with asphalt,Portland cement,grasscrete,paver blocks or other equivalent hard surface material". A paving waiver can only be granted if the structure you are proposing is not going to require a driveway for daily use. PART I — OWNER INFORMATION OWNER NAME: nr , PARCEL#: S; 3 2, ADDRESS: (' O/5F 3 1,1 STATE: a ZIP: /7 PHONE: 991-9r1 fj FAX: CELL: EMAIL: PART II —DETAILS OF PAVING WAIVER 1. Do you have an existing garage for parking daily use vehicles? YES ❑ NO 2. Is the proposed detached structure used for storage only? IE-YIS ❑ NO 3. Do you plan on using the detached structure to park vehicles? ❑ YES AN-NO If yes, then what type of vehicles? 4. Do you plan to conduct a business from proposed detached structure? ❑ YES 0'NO If so, what is the nature of your business? PART III —AUTHORIZATION I,(PRINT NAME) A''£l Y P 0 t e-r owner, hereby confirm that the information provided on this form is true and correct. I acknowledge that any change in the foregoing conditions, could require the City to impose paving requirements. I further agree to report any change in these conditions to the Spokan- Community Development Department, Planning Division, withinin30 days. /4. Q1 ,'s Owne • -ature Date PART IV — DECISION STAFF HAS REVIEWED THE PROPOSED PAVING WAIVER ON BEHALF OF THE COMMUNITY DEVELOPMENT ce DIRECTOR AND FIND THE REQUEST IS GRANTED AT � 9/t /� ~ /1-/0/ SAID ADDRESS FOR PERMIT#: //2.9//, ( Plannin ivision Staff Signature Date Created 6/27/11 Page 1 of 1