2014, 10-07 Permit: SW-14001489 Sewer SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-14001489 Permit Issued Date: 10/07/2014 Expiration Date: 10/07/2015 Project Description: SEWER CONNECTION/TAP Project Name: SHP-10-00 Primary Contact: BOWERS, DAVID E&LISA M Applicant: BOWERS, DAVID E&LISA M Phone: Address: 15221 E 6TH LN SPOKANE VALLEY,WA 99037-8847 Phone: Email: SITE INFORMATION: Site Address: 15312 E 3RD AVE Owner: BOWERS, DAVID E&LISA M Parcel Number: 45231.1214 Address: 15221 E 6TH LN SPOKANE VALLEY,WA 99037-8847 Phone: Assessor's Description: (CITY OF SPOKANE VALLEY) LT 2 OF SHP 10- Email: 08(AUDITORS#5788688 BK 25 PG 53&54) BEING A PTN OF LT 1 BLK 4 OF NEWER ADDITION Inspection Area: :(509)-477-3675 Water District:Vera Irrigation District#15 Fire District: Spokane Valley Fire Zoning: Land Area:7209 Square Feet CONTRACTOR INFORMATION: HAWKICC879OF, Exp.09/06/2015 HAWKINS CONSTRUCTION CO LLC 13718 E 41ST AVE SPOKANE,WA 99206 509-922-1047 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 SEWER MAIN/MANHOLE TAP/CUT-IN 1 $125.00 $125.00 $250.00 FEE DETAIL: Processing-Utilities $26.64 Utilities Permit $250.00 Utilities Permit $250.00 Total Fee: $526.64 CONDITIONS: Possible Habitat On Site Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed:10/07/2014 11:18:18 Project Coordinator:Kathy Cummings SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-14001489 Permit Issued Date: 10/07/2014 Expiration Date: 10/07/2015 SEWER PERMITS ARE VALID FOR ONE(1)YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 10/07/2014 11:18:18 Project Coordinator:Kathy Cummings