2014, 10-07 Permit: SW-14001489 Sewer SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-14001489 Permit Issued Date: 10/07/2014
Expiration Date: 10/07/2015
Project Description: SEWER CONNECTION/TAP
Project Name: SHP-10-00
Primary Contact: BOWERS, DAVID E&LISA M Applicant: BOWERS, DAVID E&LISA M
Phone: Address: 15221 E 6TH LN
SPOKANE VALLEY,WA 99037-8847
Phone:
Email:
SITE INFORMATION:
Site Address: 15312 E 3RD AVE Owner: BOWERS, DAVID E&LISA M
Parcel Number: 45231.1214 Address: 15221 E 6TH LN
SPOKANE VALLEY,WA 99037-8847
Phone:
Assessor's Description: (CITY OF SPOKANE VALLEY) LT 2 OF SHP 10- Email:
08(AUDITORS#5788688 BK 25 PG 53&54)
BEING A PTN OF LT 1 BLK 4 OF NEWER
ADDITION
Inspection Area: :(509)-477-3675
Water District:Vera Irrigation District#15 Fire District: Spokane Valley Fire
Zoning: Land Area:7209 Square Feet
CONTRACTOR INFORMATION:
HAWKICC879OF, Exp.09/06/2015
HAWKINS CONSTRUCTION CO LLC
13718 E 41ST AVE SPOKANE,WA 99206
509-922-1047
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
SEWER MAIN/MANHOLE TAP/CUT-IN 1 $125.00 $125.00
$250.00
FEE DETAIL:
Processing-Utilities $26.64
Utilities Permit $250.00
Utilities Permit $250.00
Total Fee: $526.64
CONDITIONS:
Possible Habitat On Site
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed:10/07/2014 11:18:18 Project Coordinator:Kathy Cummings
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-14001489 Permit Issued Date: 10/07/2014
Expiration Date: 10/07/2015
SEWER PERMITS ARE VALID FOR ONE(1)YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 10/07/2014 11:18:18 Project Coordinator:Kathy Cummings