Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2008, 08-14 Permit App: 00003195 Residence
Permit Center OF 11703 E Sprague Ave, Suite B-3 PERMIT NUMBER: Spokane Spokane Valley,WA 99206 , PERMIT FEE: ale'® (509)688-0036 FAX:(509)688-0037 www.spokanevalley.org Community Development Residential Construction I New Construction _ Accessory Bldg Permit Application Addition/Remodel n Deck 312•+-3.24 Other: Fle wittJt-I:.d F- 1.5,e -(-d 6e /hoveei SITE ADDRESS: •K- '� F• ? 4 vat T .140r ASSESSORS PARCEL NO: g e2-3/ . LEGAL DESCRIPTION: 40-r-f Z 2 - cP VQ(1� S�wl"Ira-r- S et p_20._.9-7, ft tzti`P4 r..../-1•J r n Pail 1 Building Owner- Contract r. fzrx eit .(Z. e- ,--1 8 r+ecaa 5 oma'5.40* i aww i gt.iatAX�.:_dLa_ e v�co�..��CVu.� Ey Name: Hot/.n c' ti.,0 Name: -(z Lev cosees(1' /S . oGoiaiski- Address: £�f OQ>�p, Address: l��1 6, �yk-t�-Sc,J � f� r/ s' �`J City: State: WA Zip: 9 v r 6 City: V r A dk r'd State: Zip: `r/627 Phone: Fax: Phone: q q03 -- Fax: irriroopew Contractor Lic No: E Date: Z/�t o -Tett-6V ci(12...i u, 3 Contact Person City Business Lic.No: /,z .a Sci/ STSs! Name: �e�Em y pgA-6erg- Phone: 2t(c . 44 9 flip Describe the scope of work in detail: Cost of Project: $ /3 God Ck56/14 man d.g-{-;Od Proposed Use: !�EY. c f7fe FA-0, 1 Le y **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PE/Alc: DIMENSIONS: r #OF STORIES: / TOTAL HABIT BLE ChE: gz MAIN FLOOR TO`SQ. 2"" FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS�SURFACEs-r- FTG: Jog,4 /Jl< g�t'f er AREA: Af A FINISHED BASEME T GARAGE SQ. FTG: DECK/COV. PATIO SQ'FTG: 30% SLOPES ON�N/ SQ. FTG:N A AIA PROPERTY: lA #OF BEr '��O S: CONSTRUCTION PE: HEAT SOURCE: SEWER OR SEPTIC? *, A** eAfruo-ed- Fr-P.a.-4 ,/6 5.0-w-et, The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws,codes or ordinances.6) Plans or additional information may be required to be submitted, and subsequently approved before this application can r•-- sed. G SIGNATURE: �� DATE: D ' r`I Method of Payment: ❑ Cash ❑ Check ❑ Mastercard ❑ VISA Bankcard#: Expires: VIN#: Authorized Signature: REVISED 2115/07 Permit Center Spiokane 11703 E Sprague Ave, Suite B-3 PERMIT NUMBER: Spokane Valley,WA 99206 PERMIT FEE: Valley® (509)688-0036 FAX:(509)688-0037 Community Development www.spokanevalley.org Residential Construction New Construction Accessory Bldg Permit Application Addition/Remodel Deck Other: >vw.,,diet-t_oi pft-- 451e --t 6e ous.4 SITE ADDRESS: K37-1' f. ?^� 4 vcz ...,d ASSESSORS PARCEL NO: -! .( _3/ . y4O Z LEGAL DESCRIPTION: lips 2 E.4-12.1a� 4erm6e-.4*-4Z-ircil lay, S Pri-t'" SNP _o'7/ , (14-ru...0,-11..)t Vat Budding Owner: Contractor: t:-..f�,-r rtair'1,e e-s£-f 8 re(c.445 S,ok L.oKA. / 4 A- d.+I. - YO� ..0./CO'4 4. , O Name: A/art_f i;iv Name: -(z{.C-'0 4 s(1•t /S#s...te_ep 0.01544,,,rAddress: `1 L.,„.47 I'�.S-°� �, fit-iso,..! � Address: Za �/ S, Od urs City: (,,,,,,..,,Ac-rt_s State: WA Zip: 9 v 6 City: �CrAdk/e, State: 14/1a- Zip: `r9a3 7 Phone: irpfrogoong Fax: Phone: q9037 Fax: Contractor Lic No: Exp Date: 3 2/2 10 ?RLEOG4(9 2_vitK / Contact Person City Business Lic.No: Name: JE�Em p -G`� ��Z --'4.f/ �Sr Phone: ZI(c . c./ 9 y( Describe the scope of work in detail: Cost of Project: $ /3 600 / eksem e.s-r r,..40. das ©r/ Proposed Use: 4E3- S/`,,f le (Am;/ L„, 7 y **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PE1AK: DIMENSIONS: 3 #OF STORIES: TOTAL HABITPtBLE SPACE: MAIN FLOOR TO SQ. 2ND FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: AO $gt94 ,,,i Vet( j Fr AREA: AA FINISHED BASEME T GARAGE SQ. FTG: DECK/COV. PATIO SCS:'FTG: 30% SLOPES ON SQ. FTG:N A A43a- AIR PROPERTY: N/A #OF BEF -��O S: CONSTRUCTION PE: HEAT SOUE: SEWER OR SEPTIC? , ‘04$1- ea,,,t.4-4.- Ant.,1-4 9/6' 5.0--a).2X. The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws,codes or ordinances.6) Plans or additional information may be required to be submitted, and subsequently approved before this application can r.-- sed. SIGNATURE: Alp DATE: D G (`� F Method of Payment: ❑ Cash ❑ Check ❑ Mastercard ❑ VISA Bankcard#: Expires: VIN#: Authorized Signature: REVISED 2/15/07 Permit Center ' PERMIT NUMBER: Sclibliane 11703E SpragueAve, Suite B-3 Spokane Valley,WA 99206 PERMIT FEE: Valley. (509)688-0036 FAX:(509)688-0037 41 www.sp okaneval ley.org Community Development Approach Permit Application PROJECT ADDRESS lc/2'1 G . 3 A-v START DATE S'di yrr OS ANTICIPATED COMPI.FTION DALE A/01/ Gel f It Building Owner. Contractor: Name: RA, .12„. rck Name: g -b- LN- j1j Y(t=7-- Address: !45114/ et !f'A'C* ea►r.) 1200 Address: City: (p _ q,r �e p State: /4"- Zip:q/ami L City: State: Zip: Phone: 86r,3 . -2_6- ,c Fax: Phone: Fax: Contact Person - Contractor Lic No: Exp Date: Name: c - F1,,0.0 City Business Lic.No: Phone: � Z c:,7S PROJECT DESCRIPTION (Provide site sketch) Residential Driveway Commercial/Industrial Driveway Existing Curb&Gutter Rural Road Section Culvert Installation Sidewalk Repair/Construction Other Conditions Bond/Insurance certification must be on file with the city. DISCLAIMER The permittee verifies,acknowledges and agrees by their signatures that 1)If this permit is for construction of or on a dwelling,the dwelling is/will be served by potable water. 2)Ownership of this City of Spokane Valley Permit inure to the property owner.3)The signatory is the property owner or has permission to represent the property owner in this transaction.4) All construction is to be done in full compliance with the City of Spokane Valley Development Code.Referenced codes are available for review at the City of Spokane Valley Permit Center.5)This City of Spokane Valley Permit is not a permit or approval for any violation of federal,state or local laws, codes or ordinances.6)Plans or additional information may be required to be submitted,and subsequently approved before this application can be processed. Signature N..... Date 3�1���� ( Method ofPaym nt: ❑ Cash ❑ Check ❑ Mastercard ❑ VISA Bankcard#: Expires: VIN#: Authorized Signature: REVISED 3/9/06 New pmject�' Proj e ct Precious pre-app meeting CITE' C1F Plan rezisions SpokaneTransmittal City of Spokane Valley Transmittal Date: 4000NiaiLley Community Development Monday,August 18,2008 Department 11703 E.Sprague Ave,Suite B3 Spokane Valley,WA 99206 Phone:509.688.0036 -x5141 15321 Site Address: 15324 E 3RD AVE Project Number: 08003195 Parcel Number: 45231.4692. Li (00( ?i3r/C6c /VOmbeg N e-ifn/lCaO Zoning: MF-1 Water District: VERA Fire District: FD 01 Applicant: JRLED CORP Owner: FORD, HOLLAND B & CAROLYN Y 2011 S EARLY DAWN 15423 E 4TH AVE SPOKANE VALLEY WA 99037 VERADALE. WA 99037-9743 (509) 216-4986 e-mail: e-mail: Contact: JRLED CORP Occupant: 2011 S EARLY DAWN e-mail: SPOKANE VALLEY WA 99037 (509) 216-4986 e-mail: Contractor: JRLED CORP Arch/Engineer: 2011 S EARLY DAWN SPOKANE VALLEY WA 99037 (509) 216-4986 e-mail: Project BASEMENT FOUNDATION FOR HOSE RELOCATION Description: Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATION t SITE PLAN PLANS Please send all plan review and project comments via e-mail to the highlighted individuals. sooka����� jectNew pro ject�,40Aft. ProPrezious pre-app meeting ❑ poxane Transmittal Plan rezisions City of Spokane Valley Transmittal Date: .0001;Valley Community Development Monday,August 18,2008 Department 11703 E.Sprague Ave,Suite B3 Spokane Valley,WA 99206 Phone:509.688.0036 Site Address: 15324 E 3RD AVE Project Number: 08003 95 Parcel Number: 45231.4602 0 Zoning: MF-1 Water District: VERA Fire District: FD 01 Applicant: JRLED CORP Owner: FORD. HOLLAND B & CAROLYN Y 2011 S EARLY DAWN 15423 E 4TH AVE SPOKANE VALLEY WA 99037 VERADALE, WA 99037-9743 (509) 216-4986 e-mail: e-mail: Contact: JRLED CORP Occupant: 2011 S EARLY DAWN SPOKANE VALLEY WA 99037 e-m (509) 216-4986 e-mail: Contractor: JRLED CORP Arch/En eer: -- `l I 2011 S EARLY DAWN f LE IE« i] w,/ SPOKANE VALLEY WA 99037 I (509) 216-4986 _ I 1 AUG 18 2008 -. e-mail: D 11 Project BASEMENT FOUNDATION FO Hd RELOCATION Description: Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATION j 1 SITE PLAN \ PLANS Please send all plan review and project comments via e-mail to the highlighted individuals. $ r p1 (5 ?Z-ti 6 . 3* t4 / e PAD -, all Pib-rcei Ilit 4./.5"-a,/, 414 0z,. I i - - - - - — - - --1 C 1Rk (— v 1 I CS AG �{ i TALEO care .. Z '�c2l.� t P41 1 Utrae40.1c. i,✓A 6114'.37 01, S'- 2t6-cP'I141, t i Y lfri 45A,S i i CI i 4 - . 41 144E/ .41,1 &' "amt° »# } r i 1 PLANNING DEPT. APPROVED BY: 4 � i t E { 4a tki 1 j _. . , DATE: �d i? ; ,L 11 A.1.0 r/ t 1-../. ..." i 4,VA 4 11 .......-- Ital...i . ----------7 i'. 1 i 1 . 1). I i . . . i 1-------- i 4141'244 i 1 , 1 i)11),i160 '4 ,',.' ---- . ....---. 41-1 i., ri i I b .r. i o/f) .,... I" I., \ ,-,--/ . . ,........__, . . r-nk.�Zi `- - _- _ -~ --__~'''..^ '~ ~---- -~~`--- -- --~---------- ) \ } | � Li `-------- ' V - ~-__'_-- __'_ _ -__ '' / N~�-- --__ ---___ . 1101S „gir,41 ......,„..,,,„__.............................................., i 3 c---- i 1 1 <, ? fiL......--....-...-----_..., , 1 . ..... e r, ‘ . ,.. \ ,' /". . .., -.., .._ • .....—....--- ....„, ,.., -.... ..... / \ NN ,.„.., ...,............ 1 f 1 1 1 i ...-----------, ! , ; 1 ( 2 f i 1 1 i I , i L er FT- s ,do rE- Pt> St ki (No cvg2Ft.rf srk;A "P,„�^�1 V.4 K!� SE I p�t� 3e.' Doo2 �PEw'�y �l t!g� Fd R F\u • ik g:o'' g ? N 41sts ' � " s r ,.._ I ) ' r 4 .... ...,..„ ..,„...„,. 1f? tet ,._._......._ c4:3 A eeret e. t • F r .. 1 gti t 10 r 44ti 1- t'k p `,�' 2 M 5nor2.040Iv, 6 AerH1e- . 1 x i y} ' _,t..2.1-..•j 7 01 5�� 01.,e PV .4.,-1010*)2 144M 14' 0 mpg e ip --ir- 0O itfrf opt i 1 92 2 4"( A 3 CP/1;itt' 41 13 °W4 r �74. /1 For City Use On CITY . PLUS Project Number 06W-5\' pokaneProject Address 4.0 a e ° 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised itarget tddate. Your application review TARGET DATE is z-1 The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07