2014, 02-21 Permit App: BLD-2014-0299 Pole Bldg • "" Community Development Department T (Staff Use Only)
,: Permit Center
11703 East Sprague Avenue, Suite B-3 PERMIT NUMBER:
tioka Spokane Valley, WA 99206
ne Tel: (509) 688-0036 PERMIT FEE:
Valley . Fax: (509) 688-0037
Dermitcenter@sookanevallev.orq
400 RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
_ NEW CONSTRUCTION 0 ADDITION/REMODEL ACCESSORY BUILDING
Q DECK NI OTHER `�� '/ ..'
SITE ADDRESS: Ip # OIO1q)
ASSESSORS PARCEL NO.: LEGAL DES IPTION: E C E I V D
BUILDING OWNER NAME: fFEB L , 2W4
NAME: �//40;%,.7 / + � �V��
ADDRESS: {
CITY: �D/�if2/Ile - 1�//y STATE: 4,%,.0.:_:t:., Z1;P: " 7
_. .__.,..__..a.._....�'
PHONE: ,.5 eir 9— 9s"1--‘_.7�/ FAX: CELL:
CONTACT NAME:
PHONE: cd,e-At e FAX: CELL:
CONTRACTOR NAME:
MAILING ADDRESS: •
CITY: STATE: ZIP:
PHONE: FAX: CELL:
CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.:
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE:
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NOT APPLICABLE
Height Peak: Dimnslo11 /`� No. of Stories: Total Haber
o�- 1(a `7 Space:
Main Floor SQ FT: Upper,F/lo Q FT: Unfinishe ement SQ Finishe,,d/B ement SQ
lo�OO A FT: FT: /a
Garage SQ FT: Deck/Covered Patio SQ Impervious Surface 30% Slopes on
// FT: �/i Area: Prop r)
No. of Bedrooms: Construction Type: Heat Source: Sewer or Septic:
TOTAL COST OF PROJECT: $
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will
be served by potable water. 2)Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be submitted and sub tly approved before this application can be processed.
� A
.,Signature .� al, Date:z -- /—/
Updated 1-11-11 Page 1 of 1
http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Building_Permit__Residential_11-11-11.doc
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
o SITE PLAN
o Property lines and dimensions o Setbacks to property lines
❑ Direction arrow pointing North and orientation to streets o Distance between buildings
o Proposed/existing buildings (footprint and dimensions) o Right of way/easement location &sizes
o Utilities, septic tank/drain field locations and distances o Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
❑ Elevations (Front/Rear/Sides)with roof peak and wall height including basement:
❑ Foundation Plan (crawispace, basement or slab on grade):
❑ Footing sizes and locations o Supporting wood cripple walls or beams
o Perimeter concrete foundation wall sizes ❑ Thickened concrete pads supporting
o Crawlspace ventilation beams or girder trusses
❑ Floor Plan of each level (finished or unfinished)with dimensions:
o Floor Joist direction, size and spacing ❑Window and door location and sizes
o Header, beam or concrete lintel sizes ❑Window well locations if applicable
o Brace wall panel locations o Room usage labels
o Water heater and furnace locations ❑ Smoke detector locations
o Exhaust fan locations ❑Attic and crawl space access locations
o Deck or concrete patio sizes and locations ❑ Fire Wall construction
❑ Roof Plan:
o Engineered truss direction and spacing o Ridge, eave and valley lines
o Rafter and over frame direction, size and spacing o Beam and girder size and location
❑ Wall Section Detail including:
Roof
o Slope/roofing material/underlayment/ice dam protection o Truss or rafter size, spacing &connection
o Sheathing size and type o Attic insulation/air space baffle/ventilation
Ceiling
o Joist size and spacing o Size of ceiling gypsum wall board
Wall
o Height/top plate/stud size and spacing/sole plate o Siding/exterior house wrap/anchor bolts
o Exterior sheathing size and type o Insulation, vapor barrier, gypsum wall board
Floor
o Joist size and spacing ❑ Sheathing or concrete floor size/insulation
Foundation Wall
o Concrete or Masonry unit width o Footing bottom to finished ground level depth
o Earth to wood separation distance o Horizontal &vertical reinforcement if any
Footing
o Size o Reinforcement if any
Radon
o Passive system with 6mil vapor barrier o Active system with 6 mil vapor barrier
Miscellaneous Construction Details
❑ Deck:
o Floor plan/side view/dimensions o Footings/post/and beam size and locations
o Floor Joist/decking direction, size and spacing
❑ Stairway tread rise &run and nosing 0 Handrail/Guard height&spacing
2/19/2014Clb r6t,
Gawk)Map@
Nuoe
E 3rd Ave E 3rd Ave
C 3rd Ave
N\41i ‘1)r.
fkV
20
goo tiv-i6"
13'
G)
C)
CD
U)
r
(ern Ve2
6St
0.
Map data 02014 aoogle 113,ft
1J4 Ugo14-03-c1ai PLANNING DEPT. APPROVED
Project
RECEIVED
Yc AVG, titt, --
FF9 1. 1 2014 I°1 .
CSV PERMIT CENTER
T'7.2• D
t
SUB 1 k REV.
Wm:11~1 occle.conYtivp4447.6544401,-117.1547231.21z 1/1
R sidential Driveway
Sjökane PAVING WAIVER
Valley. Community Development— Planning Division
11703 E Sprague Ave Suite 6-3 ♦ Spokane Valley WA 99206
509.720.5026 ♦ Fax: 509.688.0037•plannine@spokanevallev.org
Spokane Valley Municipal Code(SVMC)Section 19.40.020.8; "All residential driveway and off-street parking areas shall be paved with
asphalt,Portland cement,grasscrete,paver blocks or other equivalent hard surface material". paving waiver can nnly be aranted if
the structure you are proposing is not going to require a driveway fodaily use.
PART I —OWNER INFORMATION
Project �0�� O?91
; RECEDE
OWNER NAME: 7-407PARCELI(#:
FEB L 1 2014
`/ I
°J---
7
ADDRESS: / ®4v r7.._40.° Ji ,
/` `/ l CSV PERMIT CENTER
CITY: .6- i-/< ,4/, // ,,,,/./,y STATE:��/� ZIPI: c fel" k - i
PHONE:9,r/G' c/ FAX: CELL: �— EMAIL: /rl C ` �o
PART II —DETAILS OF PAVING WAIVER.
1. Do you have an existing garage for parking daily use vehicles? OYES ❑ NO
2. Is the proposed detached structure used for storage only?tigi YES El NO
3. Do you plan on using the detached structure to park vehicles? OYES ❑ NO If yes, then
what type of vehicles? Ath' 91- .:1fii/
4. Do you plan to conduct a business from proposed detached structure? ❑ YES WINO If so, what
is the nature of your business?
PART III —AUTHORIZATION
I,(PRINT NAME) %alert ` 7 yrs?'#f owner, hereby confirm that the information provided on this
form is true and correct. I acknowledge that any change in the foregoing conditions, could require
the City to impose paving requirements. I further agree to report any change in these conditions to
the Spokane Valley Comm ity Development Department, Planning Division, within 30 days.
'/ //
Owner Signature Date
PART IV— DECISION
STAFF HAS REVIEWED THE PROPOSED PAVING WAIVER ON BEHALF OF THE COMITY DEVELOPMENT
DIRECTOR AND FIND THE REQUEST
IIS;�GRANTED AT '/ -6UL T-- , J `—
SAID ADDRESS FOR PERMIT#: k�1._J - DLI4 - v .4
Ch V\Stt-LaJK 04:1- . _*--- aq D1 I 11-
Planning Division Staff Signature Date
Created 6/27/11 Page 1 of 1
o }
Target Date sheet
For City Use Onl
CITY of111/1 )C"/ PLUS Project 1,/;% 1)- : ,li C o� q 1
Spokane
t Project Address
Valley® (
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.720-5240♦ Fax: 509.688.0037♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project application,we are
providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet
this date,we will contact you with a revised target date.
Your application review TARGET DATE is
/
The TARGET DATE is the date we estimate your project application will have had its initial technical review.It is
not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
D Submit complete,accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be
several days before they can look at your new or revised information.
D Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise
for dealing with reviewer comments would be the best choice for the entire review process.
D Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your
target date.Staff may contact you before the target date if the initial review is complete.By following this procedure,you will
save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as
indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does
not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from
substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is
complete,your application will be routed to the appropriate staff and remain in their review queue until it comes up for review.
( 3.Technical Compliance.Once an application is administratively complete,it is routed to technical staff for compliance review.
Depending on the type of project,technical staff may include multiple reviewers. You should be contacted by phone, fax, email,
or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the
application are received,a Permit Specialist will process the application and contact the person specified on your application for
permit pick-up.Information regarding fees and pre-construction meetings(if required)will be provided by the Permit Specialist at
that time.
CD-003 V-7/06-21-11 Page 1 of 1