Loading...
2010, 09-01 Permit App: 10002675 Residence Project Number: 10002675 Inv: 1 Application Date: 9/1/2010 Page 1 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: SFR W/ATT GAR Contact: HAYDEN HOMES,LLC Address: 2464 SW GLACIER WAY STE 110 C-S-Z: REDMOND,OR 97756 Setbacks:Front Left: Right: Rear: Phone: (509)714-8646 Group Name: Site Information: Project Name: Plat Key: Name: Range District: East Parcel Number: 55202.2508 Block: Lot: SiteAddress: 19409 E 3RD AVE Owner:Name: HAYDEN HOMES,LLC Address: 2464 SW GLACIER WAY STE 110 Location::CSV REDMOND,OR 97756 Zoning: R-4 SF Res Urban District Water District: 134 CONSOLIDATED ID#19 Hold: ❑ Area: 6,760 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Building Plan Review Released,By: = Originally Released: 8/31/2010 By: tmelbourn Landuse/Zoning/HE Conditions ReleasedBy: Originally Released: 8/30/2010 By: tschmidt Sewer Review Released',By: d„{T"yy✓mN_:"e. .;�t`w1Y# .. . ti'. ix..nn&,,, .<. .,�vRF w �. �Y»a,. - lR'..•: _ N{ „ Operator: JD Printed By: jmm Print Date: 9/1/2010 Project Number: 10002675 Inv: 1 Application Date: 9/1/2010 Page 2 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: HAYDEN HOMES LLC Firm: HAYDEN HOMES LLC Address: 2464 SW GLACIER PL STE 110 Phone: (541)923-6607 REDMOND OR 97756 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation 1&2 FAMILY R-3 VB 135 $13,358.25 135 $13,358.25 COV DECK R-3 VB 20 $300.00 20 $300.00 GAR WOOD U-1 VB 407 $7,733.00 407 $7,733.00 Totals: 562 $21,391.25 562 $21,391.25 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $349.25 WSBCC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT 1 SELECT $139.70 Permit Total Fees: $493.45 Mechanical Permit Contractor: HAYDEN HOMES LLC Firm: HAYDEN HOMES LLC Address: 2464 SW GLACIER PL STE 110 Phone: (541)923-6607 REDMOND OR 97756 Item Description Units Unit Desc Fee Amount DUCT WORK SYSTEM 1 NUMBER OF $11.00 GAS WATER HEATER 1 NUMBER OF $11.00 GAS APPLIANCE<=100,000BTU 1 NUMBER OF $13.00 GAS PIPING 2 #OF UNITS $2.00 VENTILATING FANS 1 DUCT 3 NUMBER OF $33.00 GAS LOG OR GAS INSERT 1 NUMBER OF $11.00 HOOD-TYPE II 1 NUMBER OF $11.00 Permit Total Fees: $92.00 Operator: JD Printed By: jinni Print Date: 9/1/2010 Project Number: 10002675 Inv: 1 Application Date: 9/1/2010 Page 3 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Plumbing Permit Contractor: HAYDEN HOMES LLC Firm: HAYDEN HOMES LLC Address: 2464 SW GLACIER PL STE 110 Phone: (541)923-6607 REDMOND OR 97756 Item Description Units Unit Desc Fee Amount TOILETSBIDETS 2 NUMBER OF $12.00 SINKS 4 NUMBER OF $24.00 TUBS 2 NUMBER OF $12.00 DISH WASHERS 1 NUMBER OF $6.00 GARBAGE DISPOSAL 1 NUMBER OF $6.00 CLOTHES WASHER 1 NUMBER OF $6.00 MISCELLANEOUS FIXTURES 1 NUMBER OF $6.00 Permit Total Fees: $72.00 Payment Summary• g; Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $493.45 $493.45 $464.70 $28.75 Mechanical Permit $92.00 $92.00 $0.00 $92.00 Plumbing Permit $72.00 $72.00 $0.00 $72.00 $657.45 $657.45 $464.70 $192.75 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 9/1/2010 (Staff Use Only) *alone PERMIT NUMBER: t/ / PERMIT FEE: 400,011FValley CITY OF SPOKANE VALLEY Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley,.WA 99206 Tel: (509) 688-0036 C,Z( ' 7 Fax: (509) 688-0037 permitcenter@spokanevallev.orq RESIDENTIAL CONSTRUCTION PERMIT APPLICATION IR NEW CONSTRUCTION M ADDITION/REMODEL M ACCESSORY BUILDING DECK M OTHER SITE ADDRESS: Iqttv9 a- 3 Ave, ASSESSORS PARCEL NO.: SSZ02.250$' LEGAL DESCRIPTION: CoVC13 a�p,pj BUILDING OWNER NAME: JJ NAME: 144L jtQ,w kipMe.5 ADDRESS: - CITY: ( Q STATE:648-071.11'- - - ZIP: PHONE: Sot-71q-- 64 FAX: 6o't CELL: CONTACT NAME: r PHONE: Saq-7/L QOCL FAX: CELL: S[4 M(/ 45 ka, CONTRACTOR NAME: 1 0)414 1 CThY\ MAILING ADDRESS: 21/6v S.W. Jkc.�e(' T L. sat,_ I/D tt m CITY: ReoNd `f STATE: �R. uP: q7175-A6 PHONE: C41/ -923-6W7 FAX: So-'fid-0w/ CELL: cocf 71 y-WU. CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE: j1 Slay / ►i lh PROPOSED USE: l� (� L� Q M \) S.F. Ha inc. AUG 31 2310 D3qiIA (� Effective October 28, 2007 D I L- e 1 of 2 http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Residential Construction Permit App.l.doc to - Z �?J� • ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Height toPeak: Dimensions: No. of Stories: Total Habitable 161Z 4101 A 5 0 ( Space: a/2 Main Floor SQ .„ Upper Floor SQ Unfinished Basement Finished Basement FT: )z,...5-1 J Z S FT: JA-------, SQ FT: ArA SQ Fr: M Garage SQ FT: JDeck/ overed Pati9 Pat' Impervious Surface 30% Slopes on L 7 SQ 10 Area: MIN Property: NA No. of Constr Heat Source: Sewer or,.. Bedrooms: 3 Type: „rood 345 Septic: (r' TOTAL COST OF PROJECT: $ 5 C.)DOG DISCLAIMER The permitted verifies,acknowledges and agrees by their signature that: 1)if this permit is for construction or on a dwelling,the dwelling is/will be served by potable water. 2)Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to submi and subsequently approved before this application can be processed. Signature Date: Z2-1O Method of payment: 0 Cash 0 Check 0 Visa 0 Mastercard Bankcard #: EXP: VIN#: Authorized Signature: Effective October 28, 2007 Page 2 of 2 http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Residential Construction Permit App.l.doc Permit Center `rrYOF 11703E Sprague Ave,Suite B-3 PERMIT NUMBER: Spokane Valley,WA 99206 jValley` (509)688-0036 FAX:(509)688-0037 PERMIT FEE: perm itcenteraspokaneval ley.org Community Development Plumbing Permit Application ❑ Commercial Residential SITE ADDRESS: 1-1_LQ(l —t•_ rat_ A _ • Building Owne> Name: N M /��� �q �5 Phone: 7� '��It7 Fax: V615_07zil Address. 146q q 5.vti, s# CI State: Zip: L�lkc� r PL• so Flo ty. (� mUn�� OR 17q56 Contractor Lill-30,7 q.. Name: 1 C�1JL�K P1 U1111J1 N�1 � Phone: 30,7 Fax: q6 - 05./.1. Address: p.o. j Q„X is,Gzjo City: SplikaiVe__ State: u1/4./A Zip: otd1Z2 License No: 4 SPL u P,CL// City Business Lic: (/ Contact/Project Manager: Name: ' ç e_ ''ioo f'P Phone: `'j/Y-O p t/27j #OF UNITS PLUMBING FIXTURE ON A TRAP S TOILETS URINALS TUBS SHOWERS(per trap) Lav/Basins,Bar,Floor,Kitchen,Laundry,Utility,Janitor,Photo,X-ray,Food, i / SINKS Prep/Culinary Meat "/7 DISHWASHER CLOTHES WASHER GARBAGE DISPOSAL I WATER SOFTNER FLOOR DRAIN Area,Case,Coil,Trench,Condensate ROOF DRAIN/OVERFLOW DRAINS FOUNTAIN,DRINKING WATER PIPING/DRAIN-IN WASTE Installation,Alterations,Repair,Reversals WATER USING DEVICE Ice and/or Coffee maker,hose bib,steamer proofer,carbonator,swamp cooler PRIVATE SEWAGE DISPOSAL SYSTEM WATER HEATER If Gas,See Mechanical INDUSTRIAL WASTE PRETREATEMENT INCEPTORS Including traps,vents except kitchen type grease interceptors functioning as fixture traps _ REPAIR OR ALTERATION Water piping,drainage or vent piping ATMOSPHERIC TYPE VACUUM BREAKER BACK FLOW PROTECTIVE DEVICE Other than atmospheric type vacuum breakers MEDICAL GAS INCEPTORS OCASH 0 CHECK 0 VISA 0 MC EXPIRES: Card# VIN: SIGNATURE: F—e2— CURRENT FEES AVAILABLE AT:http://www.spokanevallev.orq/under the quick links for Forms,Master Fee Schedule. http://www.spokanevalley.org/uploads/Community_Development/Documents/FormsBuilding/PlumbingPermitApplication040309.doc Permit Center m,"�''A 11703E Sprague Ave,Suite B-3 ;i�e''^ Spokane Valley,WA 99206 PERMIT NUMBER: .....Valley (509)688-0036 FAX:(509)688-0037 Community Development permitcenter(a�spokanevallev.org PERMIT FEE: Mechanical Permit( 1 Application ❑ Commercial Residential SITE ADDRESS:. l v4"Lo 3 J/ Building Owner Name: l AynEli Phone: d 6 Fax: Address: Ci State: o°l�(� S.;,U. � motes PL. Su•�`l�b ty� � rnoM! OQ• Zip: �7� Contractor, t Name: C1?M Plat {-I�'C(-triN y 1 / Phone: Lj?J�q Sal Fax: S 7 O31 Address: P.6 60$ '3g39 ✓ City: C030K4 State: w,A Zip: l9ZZO License No: Com r L S 2 City Bussmess Lic: / t Contact/Project Manager: IJ • Name: MI tSe., (Y)00f$ Phone: .i4-�rb #UNITS FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Up to&including 100,000 BTU ' FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Over 100,000 BTU DUCT WORK SYSTEM HEAT PUMP/AIR CONDITIONER 0-3 TON AIR CONDITIONER Over 3-15 TON AIR CONDITIONER Over 15-30 TON AIR CONDITIONER Over 30-50 TON AIR CONDITIONER Over 50 TON GAS WATER HEATER j GAS PIPING SYSTEM(each outlet) 2.. GAS LOG,FIREPLACE,&GAS INSERT APPLIANCE VENTS INSTALLATION,RELOCATION,REPLACEMENT REPAIRS OR ADDITIONS BOILER,COMPRESSORS,ABSORPTIONS SYSTEM 0 to 3 hp-100,000 BTU or less BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 3-15 hp-100,001 to 500,000 BTU BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 15-30 hp -500,001 to 1,000,000 BTU BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 30 hp-1,000,001 to 1,750,000 BTU BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 50 hp-over 1,750,000 BTU AIR HANDLER(DOES NOT include ducting) Each unit up to 10,000 cfm,including ducts AIR HANDLER(DOES NOT include ducting) Each unit over 10,000 cfm EVAPORATIVE COOLERS(other than portables) VENTILATION AND EXHAUST Each fan connected to a singe duct 3 VENTILATION AND EXHAUST Each ventilation system VENTILATION AND EXHAUST Each hood served by mechanical exhaust INCINERATORS Installation or relocation of residential INCINERATORS Installation or relocation of commercial APPLIANCES Range,Clothes Washer UNLISTED APPLIANCES Under 400,000 BTU UNLISTED APPLIANCES Over 400,000 BTU HOOD Type I HOOD Type II L P STORAGE TANK WOOD OR PELLET STOVE INSERT WOOD STOVE SYSTEM-FREE STANDING ❑CASH 0 CHECK 0 VISA 0 MC EXPIRES: VIN: CARD#: SIGNATURE —z)-0 CURRENT FEES AVAILABLE AT: http://www.spokanevallev.orq Quick link to forms,then Master Fee Schedule http://www.spokanevalley.org/uploads/Community_Development/Documents/FormsBuilding/MechanicalPermitApplication040309.clue 0 1 65. 00 oI gI NI 8 � 1 1 0-302-390 1, 1 , H T. .Q2 -PEs r CD . 1-i m 0 .90 19_45'I CD OPT. POR. i — -1-� r� I Driv4 / 01ffi El 1^4117 A ..-- � / Zc ' l 6 . 02 3 D AVF \ E tL, . �L� l;' PLANNING DEPT. APPROVEDBUILDING SETBACKS FRONT HOUSE 15' FROM PL FRONT GARAGE 20' FROM PL BY: �, � CORNER 15' FROM PL SIDE 5' FROM PL �� REAR 20' (FROM PL) SCALE: 1" = 20' DATE: /= /l' HAYDEN HOMES LOT 8 BLK 2 2464 SW GLACIER PLACE, SUITE 110 ADDRESS: 19409 E. 3rd. ave. REDMOND, OR 97756 (541) 923-6607 COVEY GLENN CITY OF SPOKANE VALLEY, WASHINGTON % For City Use Only SCITY oumber pokane Project Address 4000 valley® 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07