Loading...
2010, 02-18 Permit App: 10000346 Residence Project Number: 10000346 Inv: 1 Application Date: 2/18/2010 Page 1 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: SFR W/ATT GAR Contact: HAYDEN ENTERPRISES INC Address: 2622 SW GLACIER RD#110 C-S-Z: REDMOND,OR 97756 Setbacks:Front Left: Right: Rear: Phone: (509)370-0452 Group Name: Project Name: Site Information: Plat Key: Name: Range District: East Parcel Number: 55202.2603 Block: Lot: SiteAddress: 19418 E 3RD AVE Owner:Name: HAYDEN HOMES Address: 2464 SW GLACIER PL Location::CSV REDMOND OR 97756 Zoning: R-4 SF Res Urban District Water District: 134 CONSOLIDATED ID#19 Hold: ❑ Area: 6,090 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: , . :_ „w.... - Review Building Plan Review Released By: Originally Released: 2/11/2010 By: TMELBOU Landuse/Zoning/HE Conditions Released By: Originally Released: 2/17/2010 By: tschmidt Sewer Review Released By: Permits: mow, ,,,.. AM,.. :�x. .. .,... Operator: JD Printed By: JD Print Date: 2/18/2010 Project Number: 10000346 Inv: 1 Application Date: 2/18/2010 Page 2 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: HAYDEN HOMES LLC Firm: HAYDEN HOMES LLC Address: 2464 SW GLACIER PL STE 110 Phone: (541)923-6607 REDMOND OR 97756 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation 1&2 FAMILY R-3 VB 1,584 $156,736.80 1,584 $156,736.80 DECK OPEN R-3 VB 58 $870.00 58 $870.00 GAR WOOD U-1 VB 406 $7,714.00 406 $7,714.00 Totals: 2,048 $165,320.80 2,048 $165,320.80 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $1,363.35 WSBCC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT 1 SELECT $545.34 Permit Total Fees: $1,913.19 Mechanical Permit Contractor: COMPLETE HEATING&SHEET Firm: COMPLETE HEATING&SHEET Address: PO BOX 3934 Phone: (509)533-9528 SPOKANE,WA 99220 Item Description Units Unit Desc Fee Amount DUCT WORK SYSTEM 1 NUMBER OF $11.00 GAS WATER HEATER 1 NUMBER OF $11.00 GAS APPLIANCE<=100,000BTU 1 NUMBER OF $13.00 GAS PIPING 3 #OF UNITS $3.00 VENTILATING FANS 1 DUCT 2 NUMBER OF $22.00 HOOD-TYPE I 1 NUMBER OF $52.00 GAS LOG OR GAS INSERT 1 NUMBER OF $11.00 VENTILATION MECH EXHAUST 1 NUMBER OF $13.00 Permit Total Fees: $136.00 Operator: JD Printed By: JD Print Date: 2/18/2010 Project Number: 10000346 Inv: 1 Application Date: 2/18/2010 Page 3 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Plumbing Permit Contractor: C&K PLUMBING Firm: C&K PLUMBING Address: 5231 W NAVAJO Phone: (509)489-3906 SPOKANE,WA 99208 Item Description Units Unit Desc Fee Amount TOILETSBIDETS 2 NUMBER OF $12.00 SINKS 4 NUMBER OF $24.00 TUBS 2 NUMBER OF $12.00 DISH WASHERS 1 NUMBER OF $6.00 GARBAGE DISPOSAL 1 NUMBER OF $6.00 CLOTHES WASHER 1 NUMBER OF $6.00 Permit Total Fees: $66.00 Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $1,913.19 $1,913.19 $543.10 $1,370.09 Mechanical Permit $136.00 $136.00 $0.00 $136.00 Plumbing Permit $66.00 $66.00 $0.00 $66.00 $2,115.19 $2,115.19 $543.10 $1,572.09 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 2/18/2010 oseNtolu Permit Center 11703 E Sprague Ave,Suite B-3 PERMIT NUMBER: (a . So'kane Spokane Valley,WA 99206 PERMIT FEE: Vv. (509)688-0036 FAX:(509)688-0037 www.spokanevalley.org Community Development Residential Construction New Construction ElAccessory Bldg Permit Application ❑ Addition/Remodel ❑ Deck ❑ Other: SITE ADDRESS: [ill I-it E. 3 cdt' Sf4aUGC CAJ4, Clic)/4, r ASSESSORS PARCEL NO: S5LO2.262/3 LEGAL DESCRIPTION: Co Gley � *".'�-?�'.r Vir<.�a�tc_.�,.;# .—.�' -,,. .a�� �= f'�3.. .•2�,�,, t�`'# _ .'°'�" ..*+.��'�:{ t3,a<.:r "`,s.� a �s..r�.�•,.. p�;�_'�• -�,.�—,��,--,,�. Name: ILG. V @uJ RO iMLS Name: 5 G At S bi (Cne < Address: 7_4'(0, 5.w. C��� ; Pt_ . Address: City: ( J q /, State: cis, Zip:c��b City: State: Zip: Coq Phone: o t Z3 y C>h()q Fax f1.687_0740 Phone: Fax: �t Contractor Lic No: Exp Date: 10117.1*.TPerson r . r .__ „ City Business Lic.No: Name: M i Kt. Moat, Phone: r-)09---7 _ 6q6 Describe the scope of work in detail: Cost of Project: $ G1 d)vt)0 Proposed Use: 5 Tot►"►t i I t/üm _ **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS: #OF STORIES: TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. 2"" FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: 1. /50 1ti7 AREA: 76 ?- FINISHED BASEMENT GARAGE SQ. FTG: DEC OV. PATIO SQ. FTG: 30% SLOPES ON SQ. FTG: ' ARUC f ‘ S r se( -(+. PROPERTY: ito #OF BEDROOMS: CONSTION TYPE: HEA SEWER OR SEPTIC? wood m TGCcereei f Se rve_r' The permitee verifies,acknowledges and agrees by their signature that 1) If this permit is for construction of or on a dwelling,the dwelling is/will be served by potable water.2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal,state or local laws,codes or ordinances.6) Plans or additional information may be required to be submitted,and subsequently approved before this application can be pro ed. %� � DATE: - l SIGNATURE: 7 $ 0 Method of Payment 0 Cash 0 Check 0 Mastercard 0 VISA Bankcard#: Expires: VIN#: Authorized Signature: REVISED 2/15/07 j',F� `e b, 99 .201C.'10:43AMI703 EBplagueAve,SuiOeB-9 No. 1666---P. 3_. [ : .. w valley. Spokaic Valley,WA 99206 PST N UMBER (5o9)6S13-0036 PAX(509)6SB.0037 PERMIT FEE: F> s — Community Development - P.bumbioc Permit Application ZRaridentiol nnD ss. ❑Comlmercial SITE ..ww �3 3t. St.t ►� 1}01 , w,, 19dIt _ � Milt � .V���'��kN' ipy,r,A"i�,ri p� r5�y�!y�,�y���� �•~ Meet A �� cr "� " I• .. "I� k$';'1!"":"4',7:, ti�'�'T� Z."µ :�Y.]�3 � " a T• I Addm; �. rr' 14►1_ r �I W I b cine. I •, .D , -0 7 zip .�,�;J�p�4"$1,.:A 1'Y,�('.,Sj ✓'' ��,nn�m-.��,�..� sI N « �� �w��wry � �• ��4 '�'M' ,Nt �� � ig,K' ,Ft�hr w , �,,V%'3, L a: i.:1, ,. r4,i ' i:kaft - x7 p J k. . y ti .fir ri ,� Phone; . :. h !l : G, 4' -NIA' 1 ►, a 6 , Addmsn; P.b ' ---S— i.� rip: / / . a i.I th,.eND; (, cp G)ntwa aty:„. „ PGtlEitfr� Rlt_y*ageW. ..'. -.,Ci'°�' +u_`,I . ""t "tl� tI 7PJI'1'�, ' '"'test ^ : Lesa,, ; , r , ' re, � `, a _' r , ..' r'yAi: xr-",?""..141emC' �n► i ,,/� Phone: I ` i PLUMBING FIXTURE ON A TRAP �� A OF DAUB TOILETS URINALS . TUBS - - SHOWERS(pe:bap) .• - J SINKS l arNBasfglS,Bar,Floor,Kkgren,Laundry,lrbldy,Janitor,Photo,X-ray,Foos, ProP/Cuilnery Meal DISHWASHER CLOTHES WASWER OARBADE DISPOSAL WATER SpF iT+lgR,_ 1,„ _____ FLOOR DRAIN 4 _ Area,Case,Coll,.Tmnck CentLst . — ROOF DRAM/OVERFLOW DRAINS ' FOUNT ,DRINKING wAT$t PIPINOIDR/1INaN uranin Aheretbru,Repair,Rwanda WATER USIND DEVICE , Ire and/or CDfbe maker,Mae bib,steamer moatsde '°Paler Swum Cooler PRNA7 SEWAGE DISPOSAL,SYSTEM NATER HEATER K C+'ats SE2 Me�harriral ~-..� INDUSTRIAL WA.STF PRETREATEMENT INCAErtDRS Mdutl' ha vtmis ee ase rs Idnctiottin ata haps �— REPAIR OR ALTERATION ItIrater piplep,drehtajle or vent Diehl ATMOSPHERIC TYPE VACUUM BREAKER ©ACK FLOW PROTECTIVE DELA E ^. Ogler then erlc vacuum breakers ' MEDICAL OAS' INCEPTORS I]CASH Cl CHECK D VISA 0 MC EXPIRE&& ' Certht , VIN SIGNATURE. ' • CURRENT pees AVAILABLE At;It to:thinviv.qLiRvrgey.orty/under the quick Inks for Fotms,Mester Fee Schedule_ • Ileplftwo rispoketlevelley.Drghlploadere enaitp;PtyeloputespeUu}et1tS/Ferris/Building/Plumbut r✓CxrnitA.ppiiCg4rn10403Q9 doe 1\ Permit Ccalci s1_Sfoo \� 11703E Sprague Ave,Suite B-3 j� Spokane Valley,WA 99206 PERMIT NUMBER: 17aller (509)688-0036 FAX(509)658-0037 Community Development Dermitcentcr@swlcanevallcv.org PERMIT FEE: Mechanical Permit Application ❑ Commercial Residential SITE ADDRESS: 3rd ' - Spot' Jri /it t wA, .1`I Or b i4lldingIti9IIGr ',_ - - _ _ Name: Hq e,J (Lyy 5 Phone 5/1-qz3-660`7 Fax: soc{_ 6.7-071# / Address: Z(1by 5w C�t��ler PL., City: Reef/hone/ State: DR Zip: 97754 Name: (.OM►1 a 1, r 4 CQ,i i Phone: 553 3 _CIJ' x Fac sY� "o5'c4- Address: 3 6091 retie Ate_ City. 519 Q tcq State: cost. Zip: "i )-0-;,.. License No: q I I C01.1 37 / •g-2.7 cif/-0 0 City Business Lie: Cori►e L I-1 5 o5611 67 ContacvPra�ectM2nagei- Name: #UNITS FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Up to&including 100,000 BTU FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Over 100,000 BTU DUCT WORK SYSTEM HEAT PUMP/AIR CONDITIONER 0-3 TON AIR CONDITIONER Over 3-15 TON AIR CONDITIONER Over 15-30 TON AIR CONDITIONER Over 30-5D TON AIR CONDITIONER Over 50 TON GAS WATER HEATER GAS PIPING SYSTEM(each outlet) GAS LOG,FIREPLACE,&GAS INSERT • APPLIANCE VENTS INSTALLATION,RELOCATION REPLACEMENT REPAIRS OR ADDITIONS BOILER,COMPRESSORS,ABSORPTIONS SYSTEM 0 to 3 hp-100,000 BTU or less BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 3-15 hp-100,001 to 5011,000 BTU BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 15-30 hp -500,001 to 1,000,000 BTU BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 30 hp-1,000,001 to 1,750,00D BTU BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 50 hp-over 1,750,000 BTU AIR HANDLER(DOES NOT include ducting) Each unit up to 10,000 cfm,including ducts AIR HANDLER(DOES NOT include ducting' Each unit over 10,000 cfm EVAPORATIVE COOLERS(other than portables] VENTILATION AND EXHAUST Each fan connected to a singe duct 2. VENTILATION AND EXHAUST Each ventilation system VENTILATION AND EXHAUST Each hood served by mechanical exhaust INCINERATORS Installation or relocation of residential _ INCINERATORS Installation orrelocation of commercial APPLIANCES Range,Clothes Washer UNLISTED APPLIANCES Under 400,000 BTU UNLISTED APPLIANCES Over 400,000 BTU HOOD Type I HOOD Type II L P STORAGE TANK WOOD OR PELLET STOVE INSERT WOOD STOVE SYSTEM-FREE STANDING EXPIRES: VIN: ❑CASH 0 CHECK 0 VISA ❑MC CARD ft: SIGNATURE http://www_spokanevalley.org/uploads/Commrmity_Development/Documents/Forms/Building/MechanicalPermitApplication040309.doe 3Cd °N° T �� ',1 --37I}b M ( frnoj r OPT. , CH C 0 00 1011 J2a 20 Ll KOK`d VIES L--� I Eb l J —~ Mi 6090 SF N I 56 . 00 DC S 3 116 . PLANNING DEPT. APPROVED BY i / BUILDING SETBACKS I FRONT HOUSE 15' FROM PL ' FRONT GARAGE 20 FROM PL CORNER 15' FROM PL DATE: �7 ���a SIDE 5' FROM PL REAR 20 (FROM PL) SCALE: 1" = 20' HAYDEN HOMES LOT 3 blk 3 2464 SW GLACIER PLACE, SUITE 110 ADDRESS:OR 97756 3rd. st. (541) 923-6607 COVEY GLENN CITY OF SPOKANE VALLEY, WASHINGTON -• For City Use Only te CITY OF PLUS Project Number Project Address L}30 U , pokane f J \ITtjj€ T ° 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 41000. 509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review :' Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07