Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2010, 09-01 Permit App: 10002677 Residence
Project Number: 10002677 Inv: 1 Application Date: 9/1/2010 Page 1 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: SFR W/ATT GAR Contact: HAYDEN HOMES Address: 2464 SW GLACIER PLACE SUITE 110 C-S-Z: REDMOND OR 97756 Setbacks:Front Left: Right: Rear: Phone: (509)714-8646 Group Name: Project Name: Site Information Plat Key: Name: Range District: East Parcel Number: 55202.2506 Block: Lot: SiteAddress: 19419 E 3RD AVE Owner:Name: HAYDEN HOMES Address: 2464 SW GLACIER PLACE SUITE 1 Location::CSV REDMOND OR 97756 Zoning: R-4 SF Res Urban District Water District: 134 CONSOLIDATED ID#19 Hold: ❑ Area: 5,824 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review In ormation: _: x=. : Review Building Plan Review Released By: Originally Released: 8/31/2010 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Originally Released: 8/30/2010 By: tschmidt Sewer Review Released By: Permits: VI'.� �. . ff Operator: JD Printed By: jmm Print Date: 9/1/2010 • Project Number: 10002677 Inv: 1 Application Date: 9/1/2010 Page 2 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: HAYDEN HOMES LLC Firm: HAYDEN HOMES LLC Address: 2464 SW GLACIER PL STE 110 Phone: (541)923-6607 REDMOND OR 97756 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation 1&2 FAMILY R-3 VB 1,446 $143,081.70 1,446 $143,081.70 COV DECK R-3 VB 18 $270.00 18 $270.00 GAR WOOD U-1 VB 403 $7,657.00 403 $7,657.00 Totals: 1,867 $151,008.70 1,867 $151,008.70 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $1,284.95 WSBCC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT 1 SELECT $513.98 Permit Total Fees: $1,803.43 Mechanical Permit Contractor: HAYDEN HOMES LLC Firm: HAYDEN HOMES LLC Address: 2464 SW GLACIER PL STE 110 Phone: (541)923-6607 REDMOND OR 97756 Item Description Units Unit Desc Fee Amount DUCT WORK SYSTEM 1 NUMBER OF $11.00 GAS WATER HEATER 1 NUMBER OF $11.00 GAS APPLIANCE<=100,000BTU 1 NUMBER OF $13.00 GAS PIPING 3 #OF UNITS $3.00 VENTILATING FANS 1 DUCT 3 NUMBER OF $33.00 GAS LOG OR GAS INSERT 1 NUMBER OF $11.00 HOOD-TYPE II 1 NUMBER OF $11.00 Permit Total Fees: $93.00 Operator: JD Printed By: jmm Print Date: 9/1/2010 Project Number: 10002677 Inv: 1 Application Date: 9/1/2010 Page 3 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Plumbing Permit Contractor: HAYDEN HOMES LLC Firm: HAYDEN HOMES LLC Address: 2464 SW GLACIER PL STE 110 Phone: (541)923-6607 REDMOND OR 97756 Item Description Units Unit Desc Fee Amount TOILETSBIDETS 2 NUMBER OF $12.00 SINKS 4 NUMBER OF $24.00 TUBS 2 NUMBER OF $12.00 DISH WASHERS 1 NUMBER OF $6.00 GARBAGE DISPOSAL 1 NUMBER OF $6.00 CLOTHES WASHER 1 NUMBER OF $6.00 MISCELLANEOUS FIXTURES 3 NUMBER OF $18.00 Permit Total Fees: $84.00 Payment Summa Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $1,803.43 $1,803.43 $505.02 $1,298.41 Mechanical Permit $93.00 $93.00 $0.00 $93.00 Plumbing Permit $84.00 $84.00 $0.00 $84.00 $1,980.43 $1,980.43 $505.02 $1,475.41 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 9/1/2010 Si ic)Iiane (Staff Use Only) PERMIT NUMBER: /L' L/(` 77 & PERMIT FEE: J ...„0-uilley CITY OF SPOKANE VALLEY Community Development Department Permit Center 11703 East Sprague Avenue,Suite B-3 Spokane Valley,WA 99206 . Tel: (509) 688-0036 /' 2 (2 77 Fax: (509) 688-0037 �� T permitcenter sookanevalley.orq `J' RESIDENTIAL CONSTRUCTION PERMIT APPLICATION NEW CONSTRUCTION M ADDITION/REMODEL M ACCESSORY BUILDING DECK M OTHER SITE ADDRESS: 194i 9 L. 3 J A Ike. ASSESSORS PARCEL NO.: S S Z02.2.5 o 6 LEGAL DESCRIPTION: Colic() Dim BUILDING OWNER NAME: •! `j NAME: 144(3il1.4001 e5 ADDRESS: CITY: • i. STATE: li _ ZIP: Q PHONE: 5 C C1!71q--yGI b Fax: SOi- Cos^071' CELL: CONTACT NAME: pr c` PHONE: SCA-71q` oby b Fax: CELL: Same. QS hmu}L P CONTRACTOR NAME: f igtid,p,W IturAt,S MAILING ADDRESS: 2y6y Sew. c,kcder ,PL. SLI## At 1/D CITY: RCSI/YLONd STATE:(,,e)9. ZIP: q17!S6 PHONE: Sq/ -123-6607 FAX: SO/-?6765-074// CELL: cO 1- 7I(I-CJbL,L CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE: �� Si Q Ami , dwh , PROPOSED USE: lE ( 2 [ [' 2 s .1". borne., L IS AtL; 3I 2321.; Effective October 28,2007 e 1 of 2 http://www.spokanevalley.org/uploads/Community_Development/Documents/ o s it n 4i•N.n 'on Permit App.l.doc is 2 77 ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Height to Peak: Dimensions: No. of Stories: Total Habitable 01 0 go')6 L I Space: -/`/9C, Main Floor ,j Upper Floor SQ Unfinished Basement Finished� g Basement, FT: I S -Pk(' mi: ` SQ FT: NSA Ivl SQ FT: Garage SQ FT: Deck/►overedPatio mpervious Surface 30% Slopes on 4103 p� SQ FT ,r Area: - Property: ivA No. of Constr, ion i Heat Source:Q` Sewer or Bedrooms: 3 Type: . Det5 Septic: sQ,(,V ,- TOTAL COST OF PROJECT: $ b adab DISCLAIMER The permitted verifies,acknowledges and agrees by their signature that: 1)if this permit is for construction or on a dwelling,the dwelling is/will be served by potable water. 2)Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referen ed codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a pe .it or -.roval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required t. su•- ed and subsequently approved before this application can be processed. Signature Date: 27 IC Method of payment: 0 Cash 0 Check 0 Visa 0 Mastercard Bankcard #: , EXP: VIN#: Authorized Signature: Effective October 28, 2007 Page 2 of 2 http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Residential Construction Permit App.l.doc ''''^^ Permit Center cm�lidne 11703 E Sprague Ave,Suite B-3 Spokane Valley,WA 99206 PERMIT NUMBER: • j, (509)688-0036 FAX:(509)688-0037 Community Development permitcenter@spokanevallev.org PERMIT FEE: Mechanical Permit Application ❑ Commercial J] Residential SITE ADDRESS: 1 9 E• /4 tie Building Owner Name: ti A4�QFR! 21 Phone: Fax: Address: ry /.`'� �``''' p5a�-?��-�6y6 �f��-a'7�� p`4/�y �j, C ies PL. Sv`� 11t� City: f�tcPi1►dnro� State: pQ. Zip: 17�6 Contractor II"1 Name: Ca:lin Plat t,fe-yq-GNt / Phone: S3�qs,$ Fax:;. J -03.2.1Address: 9.6 60,( 3R3 � Cty: S00dKNwtState: wti Zip: !q ZZO License No: cOmPL H505 67 City Business Lic: Contact/Project Manager: Name: (Yi moo( . Phone::.;.. #UNITS FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Up to&including 100,000 BTU FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Over 100,000 BTU DUCT WORK SYSTEM HEAT PUMP/AIR CONDITIONER 0-3 TON AIR CONDITIONER Over 3-15 TON AIR CONDITIONER Over 15-30 TON AIR CONDITIONER Over 30-50 TON AIR CONDITIONER Over 50 TON GAS WATER HEATER GAS PIPING SYSTEM(each outlet) 3 GAS LOG,FIREPLACE,&GAS INSERT APPLIANCE VENTS INSTALLATION,RELOCATION,REPLACEMENT REPAIRS OR ADDITIONS BOILER,COMPRESSORS,ABSORPTIONS SYSTEM 0 to 3 hp-100,000 BTU or less BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 3-15 hp—100,001 to 500,000 BTU BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 15—30 hp -500,001 to 1,000,000 BTU BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 30 hp—1,000,001 to 1,750,000 BTU BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 50 hp—over 1,750,000 BTU AIR HANDLER(DOES NOT include ducting) Each unit up to 10,000 cfm,including ducts AIR HANDLER(DOES NOT include ducting) Each unit over 10,000 cfm EVAPORATIVE COOLERS(other than portables) VENTILATION AND EXHAUST Each fan connected to a singe duct 2 VENTILATION AND EXHAUST Each ventilation system VENTILATION AND EXHAUST Each hood served by mechanical exhaust INCINERATORS Installation or relocation of residential INCINERATORS Installation or relocation of commercial APPLIANCES Range,Clothes Washer UNLISTED APPLIANCES Under 400,000 BTU UNLISTED APPLIANCES Over 400,000 BTU HOOD Type I HOOD Type II L P STORAGE TANK WOOD OR PELLET STOVE INSERT WOOD STOVE SYSTEM—FREE STANDING OCASH 0 CHECK 0 VISA 0 MC EXPIRES: VIN: CARD#: SIGNATURE CURRENT FEES AVAILABLE AT: http://www.spokanevalley.orq Quick link to forms,then Master Fee Schedule http://www.spokanevalley.org/uploads/Community_Development/Documents/FonnsBwilding/MechanicalPermitApplication040309.doc Permit Center rtrror 11703E Sprague Aye,Suite B-3 PERMIT NUMBER: p� Spokane Valley,WA 99206 (509)688-0036 FAX:(509)688-0037 PERMIT FEE: permitcenter(&spokanevallev.org Community Development Plumbing Permit Application n ❑ Commercial ,p1 Residential SITE ADDRESS: /9% E -?_{et- Boiling Owne) Name: �^ �./ Phone: Fax: f6/S-0'741/ Addressr 4��r� '`QM�S p7� ����J V q 2`(641 S_vll , r'kGr.tf' PL. so. 4to City: (�'7f/tit State: Og. Zip: 17,156 Contractor Name: r_ / ci7V0�11 Pl unii71 me) � Phone: LE/q_314�r� Fax: LI 64 o Address: P.0. /QJDXp� City: Sibkaive ( State: �� Zip: at 9,72.? License No: C f P1.u P 1914/ Pfd City Business Lic: Contact/Project Manager: Name: 1 K r'KJZ1rp ._ /.1Phone: lq-1O y6 #OF UNITS PLUMBING FIXTURE ON A TRAP S TOILETS URINALS TUBS SHOWERS(per trap) Lav/Basins,Bar,Floor,Kitchen,Laundry,Utility,Janitor,Photo,X-ray,Food, SINKS Prep/Culinary Meat 7 DISHWASHER CLOTHES WASHER C GARBAGE DISPOSAL WATER SOFTNER FLOOR DRAIN Area,Case,Coil,Trench,Condensate ROOF DRAIN/OVERFLOW DRAINS FOUNTAIN,DRINKING WATER PIPING/DRAIN-IN WASTE Installation,Alterations,Repair,Reversals WATER USING DEVICE Ice and/or Coffee maker,hose bib,steamer proofer,carbonator,swamp cooler 3 PRIVATE SEWAGE DISPOSAL SYSTEM WATER HEATER If Gas,See Mechanical INDUSTRIAL WASTE PRETREATEMENT INCEPTORS Including traps,vents except kitchen type grease interceptors functioning as fixture traps REPAIR OR ALTERATION Water piping,drainage or vent piping ATMOSPHERIC TYPE VACUUM BREAKER BACK FLOW PROTECTIVE DEVICE Other than atmospheric type vacuum breakers MEDICAL GAS INCEPTORS OCASH 0 CHECK 0 VISA 0 MC EXPIRES: Card# VIN: SIGNATURE: CURRENT FEES AVAILABLE AT:http://www.spokanevallev.ora/under the quick links for Forms,Master Fee Schedule. http://www.spokanevalley.org/uploads/Community_Development/Documents/FormsBwilding/PlumbingPermitApplication040309.doc • I ROC < 4 56 . 00 0, Lqi 5824 SF (91 7.1' _ _ _ _ _ _ _ 8183_ I I1 D GF WO ODI F1 , 1408 SQ. FT. I 0 -P O b 0 0 'OR G 4 EXT ,I ©r;4 CVO" ri r 11 Ea — 492 N COI Nic PLANNING DEPT. APPROVED BUILDING SETBACKS Zo FRONT HOUSE 15 FROM PL ��- FRONT GARAGE 20' FROM PL BY: i,-, , �� CORNER SIDE 15' FROM PL 5' FROM PL REAR 20' (FROM PL) SCALE: 1" = 20' DATE: 50//(' HAYDEN HOMES LOT 6 BLK 2 2464 SW GLACIER PLACE, SUITE 110 REDMOND, OR 97756 ADDRESS: 19419 E. 3rd. ave. (541) 923-6607 COVEY GLENN CITY OF SPOKANE VALLEY, WASHINGTON S • For City Use Only SjiOkane Y PLUS Project Number Project Address 400000 tlle y 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal.This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07