2010, 02-18 Permit App: 10000345 Residence Project Number: 10000345 Inv: 1 Application Date: 2/18/2010 Page 1 of 3
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information: p .. F.
Permit Use: SFR W/ATT GAR Contact: HAYDEN ENTERPRISES INC
Address: 2622 SW GLACIER RD#110
C-S-Z: REDMOND,OR 97756
Setbacks:Front Left: Right: Rear: Phone: (509)370-0452
Group Name:
Project Name:
Site Information. 7,„ ,A.,. .,.,. ,,. ... ....
Plat Key: Name: Range District: East
Parcel Number: 55202.2604 Block: Lot:
SiteAddress: 19420 E 3RD AVE Owner:Name: HAYDEN HOMES
Address: 2464 SW GLACIER PL
Location::CSV REDMOND OR 97756
Zoning: R-4 SF Res Urban District
Water District: 134 CONSOLIDATED ID#19 Hold: ❑
Area: 8,401 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information we, 'rk#
Review
Building Plan Review Released By:
Originally Released: 2/10/2010 By: tmelbourn
Landuse/Zoning/HE Conditions Released By:
Originally Released: 2/17/2010 By: tschmidt
Sewer Review Released By:
Permits: ,. ,E ,. R ...., ;yam
Operator: JD Printed By: JD Print Date: 2/18/2010
Project Number: 10000345 Inv: 1 Application Date: 2/18/2010 Page 2 of 3
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Building Permit
Contractor: HAYDEN HOMES LLC Firm: HAYDEN HOMES LLC
Address: 2464 SW GLACIER PL STE 110 Phone: (541)923-6607
REDMOND OR 97756
This Application: Total Project:
Description Grp Type Notes SQ Ft Valuation SQ Ft Valuation
1&2 FAMILY R-3 VB 1,573 $155,648.35 1,573 $155,648.35
DECK OPEN R-3 VB 121 $1,815.00 121 $1,815.00
GAR WOOD U-1 VB 486 $9,234.00 486 $9,234.00
Totals: 2,180 $166,697.35 2,180 $166,697.35
Item Description Units Unit Desc Fee Amount
RESIDENTIAL PERMIT FEE 1 SELECT $1,368.95
WSBCC SURCHARGE 1 SELECT $4.50
SF PLNS RVW<7999 SQ FT 1 SELECT $547.58
Permit Total Fees: $1,921.03
Mechanical Permit
Contractor: COMPLETE HEATING&SHEET Firm: COMPLETE HEATING&SHEET
Address: PO BOX 3934 Phone: (509)533-9528
SPOKANE,WA 99220
Item Description Units Unit Desc Fee Amount
DUCT WORK SYSTEM 1 NUMBER OF $11.00
GAS WATER HEATER 1 NUMBER OF $11.00
GAS APPLIANCE<=100,000BTU 1 NUMBER OF $13.00
GAS PIPING 2 #OF UNITS $2.00
VENTILATING FANS 1 DUCT 2 NUMBER OF $22.00
HOOD-TYPE I 1 NUMBER OF $52.00
VENTILATION MECH EXHAUST 1 NUMBER OF $13.00
Permit Total Fees: $124.00
Operator: .JD Printed By: JD Print Date: 2/18/2010
' Project Number: 10000345 Inv: 1 Application Date: 2/18/2010 Page 3 of 3
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Plumbing Permit
Contractor: C&K PLUMBING Firm: C&K PLUMBING
Address: 5231 W NAVAJO Phone: (509)489-3906
SPOKANE,WA 99208
Item Description Units Unit Desc Fee Amount
TOILETS/BIDETS 2 NUMBER OF $12.00
SINKS 4 NUMBER OF $24.00
TUBS 2 NUMBER OF $12.00
DISH WASHERS 1 NUMBER OF $6.00
GARBAGE DISPOSAL 1 NUMBER OF $6.00
CLOTHES WASHER 1 NUMBER OF $6.00
Permit Total Fees: $66.00
Notes: � ., .. y, ,,,,. .. . .
Payment Summary ,
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $1,921.03 $1,921.03 $549.82 $1,371.21
Mechanical Permit $124.00 $124.00 $0.00 $124.00
Plumbing Permit $66.00 $66.00 $0.00 $66.00
$2,111.03 $2,111.03 $549.82 $1,561.21
Disclaimer:
Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information
contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: JD Print Date: 2/18/2010
Permit Center
SI7okalle
11703 E Sprague Ave,Suite B-3 PERMIT NUMBER:
Spokane Valley,WA 99206
Valley* PERMIT FEE:
o (509)688-0036 FAX:(509)688-0037
www.spokanevallev.org
Community Development
Residential Construction t New Construction ❑ Accessory Bldg
Permit Application ❑ Addition/Remodel ❑ Deck
❑ Other:
SITE ADDRESS: 1142.3 . Mat si. Cq D14
LL
ASSESSORS PARCEL NO5S ZOZ.ZG r LEGAL DESCRIPTION: con G1e
� . emk.--
� �.F, __ 7.s�> .€ eP n rw & ` cam nA . I 747;C
Name: i1G`�(IP4J Name: SG1e.c
-z�..•co Q,-...: i lad
Address: 2---04
5•(� �I�G� PL Address:
City: fiCebnyLiState: 6R Zip:97754 City: State: Zip:
Phone: 5. I7.3_6 F7 0 Fax
Phone: Fax:
y Contractor Lic No: Exp Date:
g Irwon <,, s ._.. Y City Business Lic.No:
Name: i1 !%€. rrOor,2.,
Phone: O01-714- X646
Describe the scope of work in detail: Cost of Project: $ 61 o a 000
Proposed Use: 5 /1i
E
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK: DIMENSIONS: ) #OF STORIES: TOTAL HABITABLE SPACE:
M , 3'' 57 XI-10
3.
MAIN FLOOR TO SQ. 2ND FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE
FTG 73 ►�/_ V�/ - AREA:
FINISHED BASEMENT GARAGE SQ. FTG: DEC OV. PATIO Q. FTG: 30% SLOPES ON
SQ. FTG: N 14. /2/ s . PROPERTY: ti 6
#OF BEDROOMS: CONSTRUCTION TYPE: H T SEWER OR SEPTIC?
3 i�l,urr.( -f r umYt� r&) Forc.4Aar Sewer
The permitee verifies,acknowledges and agrees by their signature that 1) If this permit is for construction of or on a dwelling,the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal,state or
local laws,codes or ordinances.6) Plans or additional information may be required to be submitted,and subsequently approved before
this application can be process 7 d.
SIGNATURE: , DATE: Z. a-I0
Method of Payment
0 Cash ❑ Check ❑ Mastercard 0 VISA
Bankcard#: Expires: VIN#:
Authorized Signature:
REVISED 2/15/07 - -
�!WL..��� a. 1666�P• 2
cFeb, 9, 2010st10:43Rm703ESprague Ave,suit)s3 PERMIT NUMBER:
44,14llJ' Spokane Valley,WA 99206 _" 1
(505}618-0036 FAX:(309)68B•0037 PERMIT FEE:
ngtrakettliteialxiLorg
ore
Comity Developtheat
P)<nmbing Pernut cation: 0 Commercial [✓f Residentihl
scrEADu ss: 3cd 5 � _�it qei v/t
�' 1 ., .�•,r"5i old•!-. Y �'"'�J•��W. ''' M�'
,:4. .5.�.•; - 4 h �Nyr' r'`r��ry� Sl•4-` r ,pl,•:.J.iI�" �"LI �af�I'JI ,u„.'s;y . 5r
Nature ! news: I
W Wa •'dry * :Ir�,"''„"A:
Pkcr
IEIM
Addttt1 . ar►rj:K . i ( . -W • all: I r A IW : D • Zp
a
I /
.�. `�,.y^' L f..2 ;r�"' *rsrl "•Y ' jie
.�-r. .,,'� -•+i �:4_.IiA.'� -"14:4611";e-�' ra.� C +.'N,' �7���Y.0M�',-e"A71" 4:.n
�1p"��
_
Nam: tenni 0 1 i k Phone: /a
Address: 1.6 bra Ci1 I AIU —AL 3tata Zip! I I a.
J.IceneoNo: aigg 1 i CityBak;-
'' 1 1, ",Ali'., i 1:0 M, ,,r„
4.".vld ., ';+"li,..rrh "�et���k5,'�f;';�PfJ��"•J"''q:". � �' --,i �f:�' '"= ��f -�`,.��^Ey^ ( 4�1'���1C�.'I�.�. n a?""�A'�'� i•
Now: NUI4 oo re_- nom eh ~:Ira
tf QF miffs
LUNGING FIXTURE ON A TRAP
TOILETS
URINALS
1•I It3fi
SHOWERS!•- na.
Lay=astns,Bar,Floor,ICtchan Meaty Jtsnttor,Photo,If-XaV,Feed, ,-,J
SINKS /
DISHWASHER
muffles WA$SHr l J
DARMA( QISPO3AL
WATER SOFTT1R _
••- DRAIN Area.Case CoA Trench condensate
- ROOF DRANIOVCItFLOW DRAMS
FOUNTAIN,DRINKING _ V
WATER PIPING/DRAIN.IN WAsTB I i,ion,Muentons.Raker.lr.Reversals _
WATER USING OEM= Ice endlpr comm miter,Pee Mb,Memel-mem carbrunator,swarm cooler
PRIVATE SEWAGE DioN.OBAL SYSTEM
WATER HEATER 8 Gas,Set Madanlsd
INDUSTRIAL WASTE PRETREATMENT
INCEPTORS — Including ttapa,vera except kltthen type grease Irletcaptom functioning era nature traps r....
REPAIR OR ALTERATION Wain plpw,drainage or vont piping
ATMOSPHERIC TYPE VACUUM BREAKER
MCKROW PROTECTIVE DEVICE 011erthan atmos thelIe type non liens
MEDICAL
&cEPT+ORS ;
MASH O CHECK D VISA p Mc KOCF'IRRO:
Csn�a• VIN
SIGNATURE •
•
•
•
CUPSMNT FEES AVAILABL4 At:http-Ry np.3pokmtevalley.orq/under the quid(Inks for Fein,Master Fee Schedule.
htipflaww.spokanevefley.orgriploads/Co.moronity_Developrnerrt/Dacern.ontaiFvr i' n/Rulldl Iumhi>aRPermltApplicatianO4t730p.doc -. .
P11703 E
11703E Sprague Ave,Suite B-3
„:„...Valley. Spokane Valley,WA 99206 PERMIT NUMBER
• ,' ` (509)688-0036 FAX(509)688-0037
Community Development
yennitceater@spokanevallev.org PERMIT FEE:
Mechanical Permit Application ❑ Commercial g Residential
SIIk.ADDRESS: 34. 51"_ 5PorYt-.,JC Uri I/01 11016
Name:
ame H(tilRJ Phone: 5c I Q Z3 -66u7 Fax: So9- -07'1/
Address: '2 5w. (itoc; &r P, City: ReePAIONei State: OK Zip: 97756
Cantracter —
Name .QM►'i P Q, F 6 Cq 1 f •h"/ Phone: 633 `C 5A' Fax: 5l3
Address: 360 e. l ren, Atte City: 519011,4N/1_ State: (,(;7q Zip: Ci ).03,..„
License No: 01'5_I l GLI 37 Zi bol. -o 0 City Business Inc COrlI P L C CLQ(
GentaevPs o�eet 3Ytanager- z J _ �7
Phone:
*UNITS
FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Up to&including 100,000 BTU
FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Over 100,000 BTU
DUCT WORK SYSTEM
HEAT PUMP/AIR CONDITIONER 0-3 TON
AIR CONDITIONER Over 3-15 TON
AIR CONDITIONER Over 15-30 TON
AIR CONDITIONER Over 30-50 TON
AIR CONDITIONER Over 50 TON
GAS WATER HEATER J
GAS PIPING SYSTEM(each outlet)
GAS LOG,FIREPLACE,&GAS INSERT
APPLL4NCE VENTS INSTALLATION,RELOCATION,REPLACEMENT
REPAIRS OR ADDMONS
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM 0 to 3 hp-100,000 BTU or less
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 3-15 hp—100,001 to 500,000 BTU
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 15—30 hp -500,001 to 1,000,000 BTU
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 30 hp—1,000,001 to 1,750,000 BTU
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 50 hp—over 1,750,000 BTU
AIR HANDLER(DOES NOT include ducting) Each unit up to 10,000 dm,including ducts
AIR HANDLER(DOES NOT include ducting) Each unit over 10,000 dm
EVAPORATIVE COOLERS(other than portables) '
VENTILATION AND EXHAUST Each fan connected to a singe duct ,Z
VENTILATION AND EXHAUST Each ventilation system
VENTILATION AND EXHAUST Each hood served by mechanical exhaust
INCINERATORS Installation or relocation of residential
INCINERATORS Installation orrelocation of commercial
APPLIANCES Range,Clothes Washer
UNUSTED APPLIANCES Under 400,000 BTU
UNUSTED APPLIANCES Over 400,000 BTU
HOOD Type I
HOOD Type II
L P STORAGE TANK
WOOD OR PELLET STOVE INSERT
WOOD STOVE SYSTEM—FREE STANDING
EXPIRES: VIN:
:MASH 0 CHECK 0 VISA ❑MC
CARD SIGNATURE
httpJ/www_spokancvalley.org/uploads/Community_Development/Documents/Forms/Building/MechanicslPermitApplication040309.doc
•
3sa 54-
\149\i20
7" N1 \ of ,ol INT—WAe
\\ wcr Ps�se,•,c
1?"-- \\\\\1\\\HancrOd
, -:
"1X3 .17
0 a
CS
o
00
t_00' it_.,12' Bowie'
Case"c,
1i OS 6L 5 L Co
33NV)10>1 00
Ldif
of
B401 SF
78. 88
17./j5K , ..
N PLANNING DEPT. APPROVED BUILDING SETBACKS
FRONT HOUSE 15' FROM PL
FRONT GARAGE 20' FROM PL
BY: /.,� + _ CORNER 15FROM PL
SIDE 5' FROM PL
REAR 20' (FROM PL)
SCALE: 1" = 20' DATE: -2/i)//t'
HAYDEN HOMES LOT 4 blk 3
2464 SW GLACIER PLACE, SUITE 110
REDMOND, OR 97756 ADDRESS: 3rd. st.
(541) 923-6607 COVEY GLENN
CITY OF SPOKANE VALLEY, WASHINGTON
S r
• For City Use Only
PLUS Project Number
S1jöj11
Valley®
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 • permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City. 1
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure,you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone,fax,email,or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE-APPLICANT PINK-BUILDING FILE REV 9/07