Loading...
2010, 09-01 Permit App: 10002678 Residence Project Number: 10002678 Inv: 1 Application Date: 9/1/2010 Page 1 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: . . Permit Use: SFR W/ATT GAR Contact: HAYDEN HOMES LLC Address: 2464 SW GLACIER PL STE 110 C-S-Z: REDMOND OR 97756 Setbacks:Front Left: Right: Rear: Phone: (541)923-6607 Group Name: Site Information: Project Name: Plat Key: Name: Range District: East Parcel Number: 55202.2505 Block: Lot: SiteAddress: 19421 E 3RD AVE Owner:Name: HAYDEN HOMES Address: 2464 SW GLACIER PL SUITE 110 Location::CSV REDMOND OR 97756 Zoning: R-4 SF Res Urban District Water District: 134 CONSOLIDATED ID#19 Hold: ❑ Area: 7,125 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Review Building Plan Review Released By: Originally Released: 9/1/2010 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Originally Released: 8/30/2010 By: tschmidt Sewer Review Released By: Permits: Operator: JD Printed By: jmm Print Date: 9/1/2010 Prdject Number: 10002678 Inv: 1 Application Date: 9/1/2010 Page 2 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: HAYDEN HOMES LLC Firm: HAYDEN HOMES LLC Address: 2464 SW GLACIER PL STE 110 Phone: (541)923-6607 REDMOND OR 97756 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation 1&2 FAMILY R-3 VB 1,032 $102,116.40 1,032 $102,116.40 COV DECK R-3 VB 24 $360.00 24 $360.00 GAR WOOD U-1 VB 398 $7,562.00 398 $7,562.00 Totals: 1,454 $110,038.40 1,454 $110,038.40 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $1,055.35 WSBCC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT 1 SELECT $422.14 Permit Total Fees: $1,481.99 Mechanical Permit - Contractor: HAYDEN HOMES LLC Firm: HAYDEN HOMES LLC Address: 2464 SW GLACIER PL STE 110 Phone: (541)923-6607 REDMOND OR 97756 Item Description Units Unit Desc Fee Amount DUCT WORK SYSTEM 1 NUMBER OF $11.00 GAS WATER HEATER 1 NUMBER OF $11.00 GAS APPLIANCE<=100,000BTU 1 NUMBER OF $13.00 GAS PIPING 2 #OF UNITS $2.00 VENTILATING FANS 1 DUCT 3 NUMBER OF $33.00 HOOD-TYPE II 1 NUMBER OF $11.00 Permit Total Fees: $81.00 Operator: JD Printed By: jmm Print Date: 9/1/2010 Project Number: 10002678 Inv: 1 Application Date: 9/1/2010 Page 3 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Plumbing Permit Contractor: HAYDEN HOMES LLC Firm: HAYDEN HOMES LLC Address: 2464 SW GLACIER PL STE 110 Phone: (541)923-6607 REDMOND OR 97756 Item Description Units Unit Desc Fee Amount TOILETSBIDETS 2 NUMBER OF $12.00 SINKS 3 NUMBER OF $18.00 TUBS 2 NUMBER OF $12.00 DISH WASHERS 1 NUMBER OF $6.00 GARBAGE DISPOSAL 1 NUMBER OF $6.00 CLOTHES WASHER 1 NUMBER OF $6.00 MISCELLANEOUS FIXTURES 1 NUMBER OF $6.00 Permit Total Fees: $66.00 Notes: , Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $1,481.99 $1,481.99 $422.14 $1,059.85 Mechanical Permit $81.00 $81.00 $0.00 $81.00 Plumbing Permit $66.00 $66.00 $0.00 $66.00 $1,628.99 $1,628.99 $422.14 $1,206.85 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 9/1/2010 ' 40/101.1\ammit (Staff Use Only) *oliane PERMIT NUMBER: (o 'ZQ s PERMIT FEE: CITY OF SPOKANE VALLEY --- Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 9920.6 Tel: (509) 688-0036 �� Fax: (509) 688-0037 ( (i` ' - permitcenter sDokanevallev.orq .)D RESIDENTIAL CONSTRUCTION PERMIT APPLICATION It NEW CONSTRUCTION M ADDITION/REMODEL M ACCESSORY BUILDING DECK M OTHER SITE ADDRESS: 19(it( E. 3 Aue. ASSESSORS PARCEL NO.: S S 2.02.15 05 LEGAL DESCRIPTION: Gave ce aJ BUILDING OWNER NAME: •l NAME: 144tAckv 140m .5 c ADDRESS' Cm: ' Q _ r,1 STATE: ZIP:S 0 q—71 q_ c4 FAX: 6oL 6$��7y� CELL: CONTACT NAME: PHONE: Saq-71q'-��yL FAX: CELL: p 45 ��,�� CONTRACTOR NAME: MAILING ADDRESS: 290 �.(a. ,1�caer PL. sat., CITY: Rtir KICINel STATE: OR. ZIP: q.795-•6 PHONE: c i -92.3-6607 FAX S�-O/6Z -O7q/ CELL: col-7i&)-Ob_iL CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE: p �� Si l- T3h►;1y dlAid rtV D p.),3 :i ,,r :::;::, PROPOSED USE: D S.F. Home_ iq Effective October 28, 2007 Page 1 of 2 http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Residential Construction Permit App.l.doc • ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Height to Peak: Dimensions: No. of Stories: Total Habitable 1 S P-- C vi 3 I Space: a1� ted w3 L Main Floor SQ Upper Floor SQ Unfinished Basement Finishe Basement FT: ---/0?j L FT: SQ FT: j(\ SQ FT: Garage SQ FT: Deck/C ered Patio Impervious Surface 30% Slopes pon Lt.O5c SQ FT: -" if Area: NA Property: NtS No. of Constru ion Heat Source: Sewer or 5,4041 Bedrooms: 2 Type: C)5 Septic: a�W TOTAL COST OF PROJECT: $ GO DISCLAIMER The permitted verifies,acknowledges and agrees by their signature that: 1)if this permit is for construction or on a dwelling,the dwelling is/will be served by potable water. 2)Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or appro or any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be •mitt-• =nd subsequently approved before this application can be processed. Signature Date: 8--Z(�/ /v Method of payment: El Cash ❑ Check 0 Visa 0 Mastercard Bankcard #: EXP: VIN#: Authorized Signature: Effective October 28,2007 Page 2 of 2 http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Residential Construction Permit App.l.doc Permit Center 11703E Sprague Ave,Suite B-3 11tI.!1 Spokane Valley,WA 99206 PERMIT NUMBER: '� alle (509)688-0036 FAX:(509)688-0037 PERMIT FEE: Community Development permitcenter(a,spokanevallev.ore Mechanical Permit Application� B El Commercial Residential p SITE ADDRESS: f ` jZ! £- 3 L�[ L . Building Owner . Name: tiAVQELi rll Phone: Go Jd) f{�7i�'w6y6. Fax: c/6�"CT7�� Address: AL1�L/ S•i,Q. !' o_ cies PL. Su•4IiO City: 11LL��1tl State: pR. Zip: 17? Contractor= 1`"'�, 2 r Name: Lamp/tit - .-�N / Phone: �j7�g5�$ Fax: J 35-032/ Address: f' - 602( 3' 9 City: 50;)K4.,1State: esti Zip: I/q ZZO License No: C„om PL H S o; o Ea City Business Lic: Contact/Project Manager: Name: mi 11� JY)oO(Q Phone: a♦�/—��7 #UNITS FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Up to&including 100,000 BTU FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Over 100,000 BTU DUCT WORK SYSTEM HEAT PUMP/AIR CONDITIONER 0-3 TON AIR CONDITIONER Over 3-15 TON AIR CONDITIONER Over 15-30 TON AIR CONDITIONER Over 30-50 TON AIR CONDITIONER Over 50 TON GAS WATER HEATER I GAS PIPING SYSTEM(each outlet) 2 GAS LOG,FIREPLACE,&GAS INSERT APPLIANCE VENTS INSTALLATION,RELOCATION,REPLACEMENT REPAIRS OR ADDITIONS BOILER,COMPRESSORS,ABSORPTIONS SYSTEM 0 to 3 hp-100,000 BTU or less BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 3-15 hp—100,001 to 500,000 BTU BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 15—30 hp -500,001 to 1,000,000 BTU BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 30 hp—1,000,001 to 1,750,000 BTU BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 50 hp—over 1,750,000 BTU AIR HANDLER(DOES NOT include ducting) Each unit up to 10,000 cfm,including ducts AIR HANDLER(DOES NOT include ducting) Each unit over 10,000 cfm EVAPORATIVE COOLERS(other than portables) VENTILATION AND EXHAUST Each fan connected to a singe duct VENTILATION AND EXHAUST Each ventilation system VENTILATION AND EXHAUST Each hood served by mechanical exhaust INCINERATORS Installation or relocation of residential INCINERATORS Installation or relocation of commercial APPLIANCES Range,Clothes Washer UNLISTED APPLIANCES Under 400,000 BTU UNLISTED APPLIANCES Over 400,000 BTU HOOD Type I HOOD Type II L P STORAGE TANK WOOD OR PELLET STOVE INSERT WOOD STOVE SYSTEM—FREE STANDING ❑CASH 0 CHECK 0 VISA 0 MC EXPIRES: VIN: SIGNATURE CARD#: CURRENT FEES AVAILABLE AT: http://www.spokanevallev.orq Quick link to forms,then Master Fee Schedule http://www.spokanevalley.org/uploads/Community_Development/Documents/FormsBuilding/MechanicalPermitApplication040309.doc Permit Center S�y"lime00110 11703SpokaneE Sprague AveA,992Suite06 B-3 PERMIT NUMBER: p Y" € ` ( 09)688-00363C WFAX:(509)688-0037 PERMIT FEE: perm itcenter@spokanevallev.org Community Development Plumbing Permit Application El Commercial Residential SITE ADDRESS:1411-47-d„_ d L. _�f - ,Q Building Ownei Name: Phone: Fax: r Nfrd u i QMts p 7� - y6 V6/5—a/41/ q Address: 146q 5-iN, LAkGI�(- PC. Si- `l00 City: 12% m4,,,,[y State: OR Zip. i7,15K Contractor Name: Phone: Fax: ! C awl K P1 wn���� l '��9-3y��� q db- a 5,ii6 Address: p.o. /pox i%Lo City: 5 fo ha>>„_ State: gyp` Zip: 9z2- License No: (h Pi_U P iC.111 J pe, City Business Lic: Contact/Project Manager: 7 - __ Name: Moo Phone: Mi K2 MoorP7iv-16y6 #OF UNITS PLUMBING FIXTURE ON A TRAP Y TOILETS Z URINALS TUBS Z. SHOWERS(per trap) Lav/Basins,Bar,Floor,Kitchen,Laundry,Utility,Janitor,Photo,X-ray,Food, !� SINKS Prep/Culinary Meat DISHWASHER CLOTHES WASHER ' GARBAGE DISPOSAL J WATER SOFTNER FLOOR DRAIN Area,Case,Coil,Trench,Condensate ROOF DRAIN/OVERFLOW DRAINS FOUNTAIN,DRINKING WATER PIPING/DRAIN-IN WASTE Installation,Alterations,Repair,Reversals WATER USING DEVICE Ice and/or Coffee maker,hose bib,steamer proofer,carbonator,swamp cooler PRIVATE SEWAGE DISPOSAL SYSTEM WATER HEATER If Gas,See Mechanical INDUSTRIAL WASTE PRETREATEMENT INCEPTORS Including traps,vents except kitchen type grease interceptors functioning as fixture traps REPAIR OR ALTERATION Water piping,drainage or vent piping ATMOSPHERIC TYPE VACUUM BREAKER BACK FLOW PROTECTIVE DEVICE Other than atmospheric type vacuum breakers MEDICAL GAS INCEPTORS OCASH 0 CHECK 0 VISA 0 MC EXPIRES: Card# VIN: SIGNATURE: CURRENT FEES AVAILABLE AT:http://www.spokanevallev.orcl/under the quick links for Forms,Master Fee Schedule. http://www.spokanevalley.ori;/uploads/Community_Development/Documents/FormsBuilding/PlumbingPermitApplication040309.doc % 7153 SF -N, � t 1 70. 50 -io15-I-.1 NI c 5.612- — 1-2-5-—S5 W 0 L\\\NcAl co 71 Q2 f t,O f (i I 1 _00' .5109 1 I _ I 013-- ---- ---o�-I .,S) bri44.- _Li ..\:_, N wad) 1 t 3O1MVp k l._' PLANNING DEPT. APPROVED BUILDING SETBACKS FRONT HOUSE 15' FROM PL — FRONT GARAGE 20' FROM PL BY %- CORNER 15' FROM PL SIDE 5' FROM PL REAR 20' (FROM PL) SCALE: 1" = 20' DATE: ` / 'Dif HAYDEN HOMES LOT 5 BLK. 2 2464 SW GLACIER PLACE, SUITE 110 REDMOND, OR 97756 ADDRESS: 19421 E. 3rd Ave. (541) 923-6607 COVEY GLENN CITY OF SPOKANE VALLEY, WASHINGTON For City Use Only SpöCITY PLUS Project Number karle Project Address 4000 Val l ° 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal.This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE—APPLICANT PINK—BUILDING FILE REV 9/07