2013, 03-04 Permit: SW-13000137 Sewer SPOKANE CC UNTY UTILITIES
PERMIT
Application Number: SW-13000137 Permit Issued Date: 03/04/2013
Project Description: SEWER CONNECTION
Project Name: MILLER PARK
Primary Contact: VIETZKE EXCAVATING CO Applicant: VIETZKE EXCAVATING CO
Phone: 509-244-9607 Address: 2011 S CRAIG RD
AIRWAY HEIGHTS,WA 99001
Phone: 509-244-9607
Email:
SITE INFORMATION:
Site Address: 7121 E 3RD AVE Owner: MEZA, ELVIA LETICIA
Parcel Number: 35241.0614 Address: 7121 E 3RD AVE
SPOKANE,WA 99212-0615
Phone:
Assessor's Description: MIDWAY L15 B6 Email:
Inspection Area: : (509)-477-3675
Water District: East Spokane Water District Fire District:Spokane Valley Fire
#1
Zoning: Land Area:7620 Square Feet
CONTRACTOR INFORMATION:
VIETZEC121MA, Exp.08/07/2013
VIETZKE EXCAVATING CO
2011 S CRAIG RD
AIRWAY HEIGHTS,WA 99001
509-244-9607
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing-Utilities $26.32
Utilities Permit $125.00
Total Fee: $151.32
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
Date Printed:03/04/2013 15:26:17 Project Coordinator:Kathy Cummings
SPOKANE CaUNTY UTILITIES
PERMIT
Application Number: SW-13000137 Permit Issued Date: 03/04/2013
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed:03/04/2013 15:26:17 Project Coordinator:Kathy Cummings