2014, 08-18 Permit: SW-14001220 Sewer SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-14001220 Permit Issued Date: 08/18/2014
Expiration Date: 08/18/2015
Project Description: MAIN TAP LINE SEWER
Project Name: MILLER PARK
Primary Contact: ANDREY'S CONSTRUCTION SERVICE Applicant: ANDREY'S CONSTRUCTION SERVICE
Phone: 509-991-7827 Address: 306 W 31ST AVE
SPOKANE,WA 99203
Phone: 509-991-7827
Email:
SITE INFORMATION:
Site Address: 7120 E 4TH AVE Owner: GLUSHCENKO, LARISA
Parcel Number: 35241.3433 Address: 3004 N LACEY ST
SPOKANE,WA 99207-5668
Phone:
Assessor's Description: EMPIRE HEIGHTS 2ND ADD: L11 B2 TOG W/ Email:
W10FT L10 B2&E1OFT L12 B2 (PARCEL"B"
SPOKANE VALLEY BLA-2012-0011)
Inspection Area: : (509)-477-3675
Water District: East Spokane Water District Fire District:Spokane Valley Fire
#1
Zoning: Land Area:6950 Square Feet
CONTRACTOR INFORMATION:
ANDRECS077JR, Exp.08/14/2015
ANDREY'S CONSTRUCTION SERVICE
306 W 31ST AVE SPOKANE,WA 99203
509-991-7827
DETAILS:
Class Type Quantity Unit Charge Value
SEWER MAIN/MANHOLE TAP/CUT-IN 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing-Utilities $26.64
Utilities Permit $125.00
Total Fee: $151.64
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE(1)YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
Date Printed:08/18/2014 12:23:26 Project Coordinator:Kathy Cummings
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-14001220 Permit Issued Date: 08/18/2014
Expiration Date: 08/18/2015
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed:08/18/2014 12:23:26 Project Coordinator:Kathy Cummings