2010, 02-26 Permit App: 10000428 Plumbing FixturesPermit Center
ile 11703 E Sprague Ave, Suite B-3 PERMIT NUMBER:
Spokane Valley, WA 99206
ley` (509)688-0036 FAX: (509)688-0037
Community Development permitcenter@aspokanevalley.org
Mechanical Permit Application n Commercial 1 Residential
PERMIT FEE:
SITE ADDRESS:
�Jal( 1 (h/Li
Z`b
Building Owner
Name:
Address:
4
Phone: 51)1 6 _ (R'3 I Fax:
Contractor
Name:
TACEC E
City: 56itsiState: f..) vet_
Zip: l
Phone:
Fax:
Address:
City:
State:
Zip:
License No:
City Business Lic:
Contact/Project Manager:
Phone:
J
#UNITS
FURNACES & SUSPENDED HEATERS -INSTALLATION OR RELOCATION
Up to & including 100,000 BTU
FURNACES & SUSPENDED HEATERS -INSTALLATION OR RELOCATION
Over 100,000 BTU
DUCT WORK SYSTEM
HEAT PUMP/AIR CONDITIONER
0-3 TON
AIR CONDITIONER
Over 3-15 TON
AIR CONDITIONER
Over 15-30 TON
AIR CONDITIONER
Over 30-50 TON
AIR CONDITIONER
Over 50 TON
GAS WATER HEATER
GAS PIPING SYSTEM (each outlet)
GAS LOG, FIREPLACE, & GAS INSERT
APPLIANCE VENTS INSTALLATION, RELOCATION, REPLACEMENT
REPAIRS OR ADDITIONS
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
0 to 3 hp -100,000 BTU or less
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
Over 3 - 15 hp - 100,001 to 500,000 BTU
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
Over 15 - 30 hp - 500,001 to 1,000,000 BTU
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
Over 30 hp- 1,000,001 to 1,750,000 BTU
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
Over 50 hp - over 1,750,000 BTU
-
AIR HANDLER (DOES NOT include ducting)
Each unit up to 10,000 cfm, including ducts
AIR HANDLER (DOES NOT include ducting)
Each unit over 10,000 cfm
EVAPORATIVE COOLERS(other than portables)
VENTILATION AND EXHAUST
Each fan connected to a singe duct
VENTILATION AND EXHAUST
Each ventilation system
VENTILATION AND EXHAUST «[\c' L7
i Each hood served by mechanical exhaust
Cv
..-
INCINERATORS\
Installation or relocation of residential
_,{-- 4
e
INCINERATORS �
Installation or relocation of commercial
APPLIANCES .- S lil
Range, Clothes Washer
l„. ,,
UNLISTED APPLIANCES
Under 400,000 BTU
UNLISTED APPLIANCES l—�
Over 400,000 BTU
HOOD -
Type I
HOOD
Type II
L P STORAGE TANK
WOOD OR PELLET STOVE INSERT
WOOD STOVE SYSTEM - FREE STANDING
❑CASH
CARD #:
HECK ❑ VISA ❑ MC
EXPIRES:
SIGNATURE
http://www.spokanevalley. org/uploads/Community_Development/Documents/Forms/Building/MechanicalPermitAppl ication040309.doc
V
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
erm
oitcenter(a)ssokanevallev.ore
Community Development
Plumbing Permit Application ` ❑ Commercial Residential
SITE ADDRESS: 1h
I 1oi G - /�1f 'S crab -•e tJ Fr 7 lo)n
PERMIT NUMBER:
PERMIT FEE:
Building Owner ". ,. ..
Name: ct-•„ C LA. 14 4t„4-0— Phone: Fac
Address: c/q r�S City 5 N _ vet fit? State: w pc- Zip: 9`) aO-f
.Contractor
Name: ki/ikier Phone: Fax:
Address: City. State: Zip:
License No: City Business Lie:
Contact/Project Manager. •,:::
Name: et_et_) / Phone: gin - 56S - y3.3
eL NITS
PLUMBING FIXTURE ON A TRAP
� J\
TOILETS
URINALS
TUBS
SHOWERS (per trap)
SINKS
Lav/Basins, Bar, Floor, Kitchen, Laundry, Utility, Janitor, Photo, X-ray, Food,
Prep/Culinary Meat
CD
DISHWASHER
CLOTHES WASHER
GARBAGE DISPOSAL
a
WATER SOFTNER
FLOOR DRAIN
Area, Case, Coil, Trench, Condensate
ROOF DRAIN/OVERFLOW DRAINS
FOUNTAIN, DRINKING
WATER PIPING/DRAIN-IN WASTE
Installation, Alterations, Repair, Reversals
WATER USING DEVICE
Ice and/or Coffee maker, hose bib, steamer proofer, carbonator, swamp cooler
PRIVATE SEWAGE DISPOSAL SYSTEM
WATER HEATER
If Gas, See Mechanical
INDUSTRIAL WASTE PRETREATEMENT
INCEPTORS
Including traps, vents except kitchen type grease interceptors functioning as fixture traps'
REPAIR OR ALTERATION
Water piping, drainage or vent piping
ATMOSPHERIC TYPE VACUUM BREAKER
BACK FLOW PROTECTIVE DEVICE
Other than atmospheric type vacuum breakers
MEDICAL GAS
INCEPTORS
❑CASH
Card#
SIGNATURE:
CHECK ❑ VISA ❑ MC
EXPIRES:
N:
CURRENT FEES AVAILABLE AT: http://www.spokanevalley.orq/ under the quick links for Forms, Master Fee Schedule.
http://wwwspokanevalley.orp/uploads/Community_Development/Documents/Forms/Building/PlumbingPermitApplication040309.doe
i7"
4
d
cit
09
WETC H E N P\e mo P Fb,ttW P N r agT
MTCRO
v�tV� EO
0 0
G.D.
REIKT.G> RSR
Cab ne}
110/a."
Ua6„
Spokane
jValley�
Develo ment
Permit Center -- D
;',M4,11703 Sprague �, Su ,;$`j --
Spokane Valley, JA -9924b -r 0 MTER
(509)688-0036.'•1:AX: (509)638-0037
w.swwokanevalle� ' 0
Community p
Residential Construction
Permit Application sit
PERMIT NUMBER: IC) [t
PERMIT FEE:
New Construction Accessory Bldg
Addition/Remodel Deck
Other:
SITE ADDRESS:
£ . '' r S?a2 / 6,../14 79 ;.,e)Co
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
Building Owner:
STORIES:
DIMENSIONS: NS:
Ifq Go
# OF
Name: r
6_ (4/
MAIN FLOOR TO SQ.
FTG: �.! I n
2Nu FLOOR SQ. FTG:
1v1 A
it. I .
Address: i t 9 f il L .- (.f
IMPERVIOUS SURFACE
AREA: N/
FINISHED BASEMENT
SQ. FTG: If / t�
City: fa (
State:
Zip: qe )_,t
(
Phone: Sal _ ye , 1 37
Fax:
HEAT SOURCE:
Contact Person
Name:
Phone:
(L414,
SDP368. 433(
Describe the scope of work in detai
1:
Contractor:
STORIES:
DIMENSIONS: NS:
Ifq Go
# OF
Name:
MAIN FLOOR TO SQ.
FTG: �.! I n
2Nu FLOOR SQ. FTG:
1v1 A
Address:
IMPERVIOUS SURFACE
AREA: N/
FINISHED BASEMENT
SQ. FTG: If / t�
City:
State:
Zip:
Phone:
Fax:
HEAT SOURCE:
Contractor Lic No:
Exp Date:
City Business Lic. No:
Cost of Project: $ g
Proposed Use:
„t,t4-) ou4v,40-\�
€ �\\2-6R0.Yk1 CW03.\-y-c 1-\x{cIA\
•(write N/A if not applicable)**********************
HEIGHT TO PEAK: fiA
STORIES:
DIMENSIONS: NS:
Ifq Go
# OF
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
FTG: �.! I n
2Nu FLOOR SQ. FTG:
1v1 A
UNFIN BASEMENT SQ. FTG:;
N
IMPERVIOUS SURFACE
AREA: N/
FINISHED BASEMENT
SQ. FTG: If / t�
GARAGE SQ. FTG:
°''''1
DECK/COV. PATIO SQ. G:
pi,�'
30% SLOPES ON
PROPERTY: N/�
# OF BEDROOMS:
CONSTRUCTION TYPE:
HEAT SOURCE:
SEWER OR SEPTIC? J J
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE:
Method of Payment:
❑ Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
fA Check
DATE: 21/
❑ Mastercard ❑ VISA
Expires: VIN#:
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
o SITE PLAN
o Property lines and dimensions
o Direction arrow pointing North and orientation to streets
o Proposed/existing buildings (footprint and dimensions)
o Utilities, septic tank/drain field locations and distances
o Setbacks to property lines
o Distance between buildings
o Right of way/easement location & sizes
o Driveway approach size and location
BU)LDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
VElevations (Front/Rear/Sides) with roof peak and wall height including basement:
❑ Foundation Plan (crawlspace, basement or slab on grade):
o Footing sizes and locations
o Perimeter concrete foundation wall sizes
o Crawlspace ventilation
o Supporting wood cripple walls or beams
o Thickened concrete pads supporting
beams or girder trusses
❑ Floor Plan of each level (finished or unfinished) with dimensions:
o Floor Joist direction, size and spacing o Window and door location and sizes
o Header, beam or concrete lintel sizes 0 Window well locations if applicable
o Brace wall panel locations o Room usage labels
o Water heater and furnace locations 0 Smoke detector locations
o Exhaust fan locations o Attic and crawl space access locations
o Deck or concrete patio sizes and locations o Fire Wall construction
❑ Roof Plan:
o Engineered truss direction and spacing
o Rafter and over frame direction, size and spacing
❑ Wall Section Detail including:
Roof
o Slope/ roofing material/ underlayment/ ice dam protection
o Sheathing size and type
Ceiling
o Joist size and spacing
Wall
o Height/ top plate/ stud size and spacing/ sole plate
o Exterior sheathing size and type
Floor
o Joist size and spacing
Foundation Wall
o Concrete or Masonry unit width
o Earth to wood separation distance
Footing
o Size
Radon
o Passive system with 6mi1 vapor barrier
Miscellaneous Construction Details
❑ Deck:
o Floor plan/ side view/ dimensions
o Floor Joist/ decking direction size and spacing
❑ Stairway tread rise & run and nosing
o Ridge, eave and valley lines
o Beam and girder size and location
o Truss or rafter size, spacing & connection
o Attic insulation/ air space baffle/ ventilation
o Size of ceiling gypsum wall board
o Siding/ exterior house wrap/ anchor bolts
o Insulation, vapor barrier, gypsum wall board
o Sheathing or concrete floor size/ insulation
o Footing bottom to finished ground level depth
o Horizontal & vertical reinforcement if any
O Reinforcement if any
o Active system with 6 mil vapor barrier
o Footings/ post/ and beam size and locations
O Handrail / Guard height & spacing
„tet
itvAoLi
d
_0 -ataxia ettc.vvAcioWszika
„44
Sp�ka►�
jUalley
For City Use Only
PLUS Project Number 141 t',
Project Address' `r _ l .
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 • Fax: 509.688.0037 • permitcenter®spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Ii,
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
> Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE
REV 9/07
eta zc�esd t
•
•
' 'C1
„atel
„M°11 1
a•s
$O
00
„TA L9
sta tivooVd N N3HDflA