Loading...
2010, 02-26 Permit App: 10000428 Plumbing FixturesPermit Center ile 11703 E Sprague Ave, Suite B-3 PERMIT NUMBER: Spokane Valley, WA 99206 ley` (509)688-0036 FAX: (509)688-0037 Community Development permitcenter@aspokanevalley.org Mechanical Permit Application n Commercial 1 Residential PERMIT FEE: SITE ADDRESS: �Jal( 1 (h/Li Z`b Building Owner Name: Address: 4 Phone: 51)1 6 _ (R'3 I Fax: Contractor Name: TACEC E City: 56itsiState: f..) vet_ Zip: l Phone: Fax: Address: City: State: Zip: License No: City Business Lic: Contact/Project Manager: Phone: J #UNITS FURNACES & SUSPENDED HEATERS -INSTALLATION OR RELOCATION Up to & including 100,000 BTU FURNACES & SUSPENDED HEATERS -INSTALLATION OR RELOCATION Over 100,000 BTU DUCT WORK SYSTEM HEAT PUMP/AIR CONDITIONER 0-3 TON AIR CONDITIONER Over 3-15 TON AIR CONDITIONER Over 15-30 TON AIR CONDITIONER Over 30-50 TON AIR CONDITIONER Over 50 TON GAS WATER HEATER GAS PIPING SYSTEM (each outlet) GAS LOG, FIREPLACE, & GAS INSERT APPLIANCE VENTS INSTALLATION, RELOCATION, REPLACEMENT REPAIRS OR ADDITIONS BOILER, COMPRESSORS, ABSORPTIONS SYSTEM 0 to 3 hp -100,000 BTU or less BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 3 - 15 hp - 100,001 to 500,000 BTU BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 15 - 30 hp - 500,001 to 1,000,000 BTU BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 30 hp- 1,000,001 to 1,750,000 BTU BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 50 hp - over 1,750,000 BTU - AIR HANDLER (DOES NOT include ducting) Each unit up to 10,000 cfm, including ducts AIR HANDLER (DOES NOT include ducting) Each unit over 10,000 cfm EVAPORATIVE COOLERS(other than portables) VENTILATION AND EXHAUST Each fan connected to a singe duct VENTILATION AND EXHAUST Each ventilation system VENTILATION AND EXHAUST «[\c' L7 i Each hood served by mechanical exhaust Cv ..- INCINERATORS\ Installation or relocation of residential _,{-- 4 e INCINERATORS � Installation or relocation of commercial APPLIANCES .- S lil Range, Clothes Washer l„. ,, UNLISTED APPLIANCES Under 400,000 BTU UNLISTED APPLIANCES l—� Over 400,000 BTU HOOD - Type I HOOD Type II L P STORAGE TANK WOOD OR PELLET STOVE INSERT WOOD STOVE SYSTEM - FREE STANDING ❑CASH CARD #: HECK ❑ VISA ❑ MC EXPIRES: SIGNATURE http://www.spokanevalley. org/uploads/Community_Development/Documents/Forms/Building/MechanicalPermitAppl ication040309.doc V Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 erm oitcenter(a)ssokanevallev.ore Community Development Plumbing Permit Application ` ❑ Commercial Residential SITE ADDRESS: 1h I 1oi G - /�1f 'S crab -•e tJ Fr 7 lo)n PERMIT NUMBER: PERMIT FEE: Building Owner ". ,. .. Name: ct-•„ C LA. 14 4t„4-0— Phone: Fac Address: c/q r�S City 5 N _ vet fit? State: w pc- Zip: 9`) aO-f .Contractor Name: ki/ikier Phone: Fax: Address: City. State: Zip: License No: City Business Lie: Contact/Project Manager. •,::: Name: et_et_) / Phone: gin - 56S - y3.3 eL NITS PLUMBING FIXTURE ON A TRAP � J\ TOILETS URINALS TUBS SHOWERS (per trap) SINKS Lav/Basins, Bar, Floor, Kitchen, Laundry, Utility, Janitor, Photo, X-ray, Food, Prep/Culinary Meat CD DISHWASHER CLOTHES WASHER GARBAGE DISPOSAL a WATER SOFTNER FLOOR DRAIN Area, Case, Coil, Trench, Condensate ROOF DRAIN/OVERFLOW DRAINS FOUNTAIN, DRINKING WATER PIPING/DRAIN-IN WASTE Installation, Alterations, Repair, Reversals WATER USING DEVICE Ice and/or Coffee maker, hose bib, steamer proofer, carbonator, swamp cooler PRIVATE SEWAGE DISPOSAL SYSTEM WATER HEATER If Gas, See Mechanical INDUSTRIAL WASTE PRETREATEMENT INCEPTORS Including traps, vents except kitchen type grease interceptors functioning as fixture traps' REPAIR OR ALTERATION Water piping, drainage or vent piping ATMOSPHERIC TYPE VACUUM BREAKER BACK FLOW PROTECTIVE DEVICE Other than atmospheric type vacuum breakers MEDICAL GAS INCEPTORS ❑CASH Card# SIGNATURE: CHECK ❑ VISA ❑ MC EXPIRES: N: CURRENT FEES AVAILABLE AT: http://www.spokanevalley.orq/ under the quick links for Forms, Master Fee Schedule. http://wwwspokanevalley.orp/uploads/Community_Development/Documents/Forms/Building/PlumbingPermitApplication040309.doe i7" 4 d cit 09 WETC H E N P\e mo P Fb,ttW P N r agT MTCRO v�tV� EO 0 0 G.D. REIKT.G> RSR Cab ne} 110/a." Ua6„ Spokane jValley� Develo ment Permit Center -- D ;',M4,11703 Sprague �, Su ,;$`j -- Spokane Valley, JA -9924b -r 0 MTER (509)688-0036.'•1:AX: (509)638-0037 w.swwokanevalle� ' 0 Community p Residential Construction Permit Application sit PERMIT NUMBER: IC) [t PERMIT FEE: New Construction Accessory Bldg Addition/Remodel Deck Other: SITE ADDRESS: £ . '' r S?a2 / 6,../14 79 ;.,e)Co ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: STORIES: DIMENSIONS: NS: Ifq Go # OF Name: r 6_ (4/ MAIN FLOOR TO SQ. FTG: �.! I n 2Nu FLOOR SQ. FTG: 1v1 A it. I . Address: i t 9 f il L .- (.f IMPERVIOUS SURFACE AREA: N/ FINISHED BASEMENT SQ. FTG: If / t� City: fa ( State: Zip: qe )_,t ( Phone: Sal _ ye , 1 37 Fax: HEAT SOURCE: Contact Person Name: Phone: (L414, SDP368. 433( Describe the scope of work in detai 1: Contractor: STORIES: DIMENSIONS: NS: Ifq Go # OF Name: MAIN FLOOR TO SQ. FTG: �.! I n 2Nu FLOOR SQ. FTG: 1v1 A Address: IMPERVIOUS SURFACE AREA: N/ FINISHED BASEMENT SQ. FTG: If / t� City: State: Zip: Phone: Fax: HEAT SOURCE: Contractor Lic No: Exp Date: City Business Lic. No: Cost of Project: $ g Proposed Use: „t,t4-) ou4v,40-\� € �\\2-6R0.Yk1 CW03.\-y-c 1-\x{cIA\ •(write N/A if not applicable)********************** HEIGHT TO PEAK: fiA STORIES: DIMENSIONS: NS: Ifq Go # OF TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. FTG: �.! I n 2Nu FLOOR SQ. FTG: 1v1 A UNFIN BASEMENT SQ. FTG:; N IMPERVIOUS SURFACE AREA: N/ FINISHED BASEMENT SQ. FTG: If / t� GARAGE SQ. FTG: °''''1 DECK/COV. PATIO SQ. G: pi,�' 30% SLOPES ON PROPERTY: N/� # OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC? J J The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: Method of Payment: ❑ Cash Bankcard #: Authorized Signature: REVISED 2/15/07 fA Check DATE: 21/ ❑ Mastercard ❑ VISA Expires: VIN#: RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. o SITE PLAN o Property lines and dimensions o Direction arrow pointing North and orientation to streets o Proposed/existing buildings (footprint and dimensions) o Utilities, septic tank/drain field locations and distances o Setbacks to property lines o Distance between buildings o Right of way/easement location & sizes o Driveway approach size and location BU)LDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) VElevations (Front/Rear/Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): o Footing sizes and locations o Perimeter concrete foundation wall sizes o Crawlspace ventilation o Supporting wood cripple walls or beams o Thickened concrete pads supporting beams or girder trusses ❑ Floor Plan of each level (finished or unfinished) with dimensions: o Floor Joist direction, size and spacing o Window and door location and sizes o Header, beam or concrete lintel sizes 0 Window well locations if applicable o Brace wall panel locations o Room usage labels o Water heater and furnace locations 0 Smoke detector locations o Exhaust fan locations o Attic and crawl space access locations o Deck or concrete patio sizes and locations o Fire Wall construction ❑ Roof Plan: o Engineered truss direction and spacing o Rafter and over frame direction, size and spacing ❑ Wall Section Detail including: Roof o Slope/ roofing material/ underlayment/ ice dam protection o Sheathing size and type Ceiling o Joist size and spacing Wall o Height/ top plate/ stud size and spacing/ sole plate o Exterior sheathing size and type Floor o Joist size and spacing Foundation Wall o Concrete or Masonry unit width o Earth to wood separation distance Footing o Size Radon o Passive system with 6mi1 vapor barrier Miscellaneous Construction Details ❑ Deck: o Floor plan/ side view/ dimensions o Floor Joist/ decking direction size and spacing ❑ Stairway tread rise & run and nosing o Ridge, eave and valley lines o Beam and girder size and location o Truss or rafter size, spacing & connection o Attic insulation/ air space baffle/ ventilation o Size of ceiling gypsum wall board o Siding/ exterior house wrap/ anchor bolts o Insulation, vapor barrier, gypsum wall board o Sheathing or concrete floor size/ insulation o Footing bottom to finished ground level depth o Horizontal & vertical reinforcement if any O Reinforcement if any o Active system with 6 mil vapor barrier o Footings/ post/ and beam size and locations O Handrail / Guard height & spacing „tet itvAoLi d _0 -ataxia ettc.vvAcioWszika „44 Sp�ka►� jUalley For City Use Only PLUS Project Number 141 t', Project Address' `r _ l . 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter®spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Ii, Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review > Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 eta zc�esd t • • ' 'C1 „atel „M°11 1 a•s $O 00 „TA L9 sta tivooVd N N3HDflA