Loading...
2008, 08-14 Permit App: 08003196 Foundation Permit Center -, okan'e\� 11703 E Sprague Ave,Suite B-3 PERMIT NUMBER: Spokane Valley,WA 99206 jValley. (509)688-0036 FAX:(509)688-0037 PERMIT FEE: www.Spokane valley.org Community Development Residential Construction New Construction Accessory Bldg Permit Application Addition/Remodel Deck 0 Other: ro •td„fz.o ....., J1 Se .z.., az_ bi o,K,i V' s n SITE ADDRESS: / C 1-10- Cj.-Ah vP- sn. �, t r a(1 5/ye-3 e,7 ASSESSORS PARCEL NO: !f 1-i( • 13 -' LEGAL DESCRIPTION: t . Atid fr S6 ysqu 6 91e-251 or 27-Z be,fyR er.,.-4,.•,, aG gLvc-lam i4e 0F. Building Owner: Contractor: j'zL Lc Name: biR2i4 5peim. Name: Address: 3-- r.r-1 ,7,/y S-.eo nj411;4 Address: 24)/7 s. fir' a 4n/is-- City: imCity: G„ ILL l(ei State: 14An Zip: "2.04 City: ve_r_p /0 State: k-VA Zip: 71637 Phone: 92,,E -p p.1l/ Fax: Phone: 2-L La , y p,4 Fax: Contractor Lic No: Exp Date: -T2l.EbG `?ZS u I,- 3�``7 X10 Contact Person City Business Lic.No: Name: 1.- }2..e'''iii asyc— '24y 2 S Y/ 3 Phone: /6. - 4ib Describe the scope of work in detail: Cost of Project: $ /3 G Fa h ccia,-A;Iff4-sen,nain st- . Proposed Use: , S cry l� /C-1,-../.././1 �m e- '`.5 - **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS: #OF STORIES: I TOTAL HABITABJE SPACE: 7-11 iC 56'4 MAIN FLOOR TO SQ. 2ND FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: 61.'1 1,JlA 1� AREA: FINISHED BASEMNT GARAGE SQ. FIG: DECK/COV. PATI SQ. FTG: 30% SLOPES ON SQ. FTG: /l.r A �fr /J f PROPERTY: Ailek- #OF BEDROOMS: CON RUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC? 3 fes`mof-6. 4e- P,,,rie 750-0)-.24- The .¢,Y The permitee verifies,acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal,state or local laws,codes or ordinances.6) Plans or additional information may be required to be submitted,and subsequently approved before this application can be • •cessed. SIGNATURE: DATE: 440 Method of Payment: ❑ Cash ❑ Check ❑ Mastercard ❑ VISA Bankcard#: Expires: VIN#: Authorized Signature: REVISED 2/15/07 Permit Center PERMIT NUMBER: Scrry of 11703 E Sprague Ave, Suite B-3 pokane Spokane Valley,WA 99206 PERMIT FEE: Valley® (509)688-k0036 FAX: (509)688-0037 www.spokanevall ey.org Community Development Approach Permit Application PROJECT ADDRESS 1 ( ‘ c5,7 e ` START DA 1E ANTICIPA 1"ED COMPLETION DAIE QE't- C Building Owner. Contractor: Name: Ali' /f7 012 fe $'(4r Name: I f Lam) Co rzr Address: 9 q (vf 5. a B 44 er f�5A Address: 'Lc. , . s. 642.4_0_7_ City: V0 i,„�,p_ fd State:ti/,� . Zip:1424 6 City: U State:�,�- Zip:9gd 37 Phone:(( q L 7 - .9 q l / Fax: Phone: -2,..1,4-0 q y syc Fax: Contact Person / Contractor Lie No:T2L�C ,11� w Date: 3(� / g f c. Name: ��jA. rt+-.� 0{ ,9t,- City Business Lic.No: Phone: Z-t (. g 9 g'(,.• PROJECT DESCRIPTION (Provide site sketch) Residential Driveway Commercial/Industrial Driveway Nr- .��� Existing Curb&Gutter Rural Road Section Culvert Installation Sidewalk Repair/Construction Other Conditions Bond/Insurance certification must be on file with the city. DISCLAIMER The permittee verifies,acknowledges and agrees by their signatures that: 1)If this permit is for construction of or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner.3)The signatory is the property owner or has permission to represent the property owner in this transaction.4) All construction is to be done in full compliance with the City of Spokane Valley Development Code.Referenced codes are available for review at the City of Spokane Valley Permit Center.5)This City of Spokane Valley Permit is not a permit or approval for any violation of federal,state or local laws, codes or ordinances.6)Plans or additional information may be required to be submitted,and subsequently approved before this application can be processed. f q_ 1 (1- s Signature t dik ...- Date . Method of Payment: ❑ Cash ❑ Check ❑ Mastercard ❑ VISA Bankcard#: Expires: VIN#: Authorized Signature: REVISED 3/9/DS 4.0"\iftee. , • Newpro project Project Previous pre-app meeting El Stiokarne SpoIne Plan revisions Transmittal City of Spokane Valley Transmittal Date: 4000,7Valley Community Development Monday,August 18,2008 Department 11703 E.Sprague Ave,Suite B3 Spokane Valley,WA 99206 Phone:509.688.0036 Site Address: 11908 E 4TH AVE Project Number: 08003196 Parcel Number: 45211.1322 `� Zoning: R-3 Water District: Y v�7 C '' CN/7 Fire District: FD 01 �� Applicant: JRLED CORP Owner: SPEAR, MARK D & KAREN 2011 S EARLY DAWN 12012E MISSION AVE SPOKANE VALLEY WA 99037 SPOKANE VALLEY, WA 99206 (509) 216-4986 e-mail: e-mail: Contact: JRLED CORP Occupant: 2011 S EARLY DAWN s F SPOKANE VALLEY WA •• Or (509) 216-4986 ,/ . e-mail: ID ; �L i L 11 '';';/i i r, i . Contractor: JRLED CORP Arch Engineer: i. __ 2011 S EARLY DAWN AUG 18 SPOKANE VALLEY WA 99037 D ' � ` (509) 216-4986 n 11 11 i I, '. e-mail: ProjectbOU DATION FOR RELOCATED HOME Description: Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATION SITE PLAN l PLANE r`1 u Please send all plan review and project comments via e-mail to the highlighted individuals. :: '- 5 (.-a r( 4 ._, 1 Ctt‹'`f'e .� _____ ----------- ______ -�/ ► ,4 alb Uel :/A;7h,-1:-k�L 1 8:--------' ( / °' --- ' itSku. " k , S89'50'31"E 70'.00' 20' w K)' c� � ,� o 0 r 12.00 L ' e, Z , > 20' EASEMENT o FOR INGRESS/EGRESS, ,,R2 -� o PRIVATE SEWER AND % N UTILITIES EASEMENT. o S��' ® 2...s--'-o" It OLt r771- s, Q� � N9��J�\ /) o _ O cci G q0 CL. .' •2 O Sower- 1 s - x 1 PLANNIM DEPT. APPROVED EXISTING 7 �A .-; STRUCTURE 47,,,,,,47/&,,,,,,,,,,,,7(--- 7R-Ler c,or_e BY: K DATE: �%i 's/Zt7o7 44:65' 1• I f- S89'50' 3"E 70.00' —. 0 � , X X 5C- • `/$- 3 --6 I .„--,.— , ....--- ..- . ....7-- I -7- — -------------„,—____,.. , IIII, . iat# 015 1 . , 1 I . 1 7 ..,....7417 'C t OVi er-tt(I r it ict ire . • I t J 1 1 1 I ,...._ , ...... .....,. ....,_ „ ..1, f fe" i''',404/1..r ii e v 0.1-to:sr+ tit> 5 Cltle • ------------~---'--------- \ ~/ E \ / ' fl _l | -- i \ __~_~-__ _~~ . . _ ���7 Ema 110.5. Iry 3.--- --?0,!S I 3 3 .1 1 1 # r ) ( r ? L,.._.__.._ i I 1 .... ...... fr ,,,,,.. ;;; , ,, ..- ,.„. , , \ 7.' • ,. . \ , 7 ',......„.. ,via...4•1,a,,,:,,,,P.4.0.ar.:.*.a.,,,,IC .‘.., ... , '...,„ ,.. ,.., N \ / • •• ..- ,./ .., ,• — . ..—....-3.—.......„_ , /---- ' ..,_ ........_...-- 3 4 c___.------------) 1 i v I 3 11 i 3 4 3 ---34 Le: Pr $ i 00E. fia $tikie, 2 , y Lott/ 44 -.12 3 2 Y' e,.3(p/PC.'01 03 0.1- FF C awe •P(, ► 7 /S.2. 1.1.,A'fv , / (go [N (-t►viri2 R FriSd r T;R "lee^"`g J} i Ll CA 400 ?c.“Doa2 A.P .#4y A\rT •v`ja .7_, i .._ L ,,,,,,...,, ,frq..A4...... / ,. i :3;4)ti(4 WOMS 1 ii-k 0u R-4,1.4 14""X ,co tc.Aol):1) :" ft—°t. (-:- i I 5-6121 p5' • 1 f g°0 *if fee-644- . / . t� f \ r . , gt, . ,it • , i � For City Use On! , r PLUS Project NumbertO� ( \ o CITY poxane Project Address k\clOvb E,-------A-vQ-- Valley® 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE isn ' .3\re \(:5' The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ' Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. > Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07