2010, 04-21 Permit App: 10001063 Garage1
PERMIT TYPE
CONTRACTOR:
LICENSE#
Stiokanel�
TEMPORARY PERMIT
SITE ADDRESS
PARCEL NUMBER
SUBDIVISION
BLOCK/LOT
ZONING
OWNER
ADDRESS
BUILDING INSPECTOR
WATER DIST.
1 2--101) � &
Loc \s 22-3
INSPECTION LINE 509-688-0054
GROUP NAME
PROJECT NAME
BUILDING DIVISION
11707 E. Sprague Avenue, Suite 106
Spokane Valley, WA 99206
PROJECT NUMBER JO- ( uta
ISSUE DATE 1--/P1110
PERMIT USE 314 Lhke. #4t rC_
APPLICANT
CONTACT
SETBACKS FRONT
RIGHT
LEFT
REAR
PERMITS
PAYMENT SUMMARY
TRANS DATE
TOTAL FEE AMT OWING RECEIPT # PMT AMT
3`11,0
01-1 `lS
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by
definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the
applicant/permittee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the
construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE
REQUIRED by City Code:
FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes.
NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane
Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable
setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to
properly locate the structure may require its relocation at the owner's/permittee's expense.
FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING — after rough -in, before covering, and final.
MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final.
FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to
concealing.
FINAL — when complete and prior to occupancy and/or use. All permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site ✓,..-
plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access,.'
on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must tfe _
completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy;
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover.
RIGHT-OF-WAY/APPROACH — prior to placement of concrete/asphalt or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must
be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects.
FOR INSPECTIONS
Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency.
Building, plumbing (includes interior reversals for sewer) and
mechanical, City of Spokane Valley Building Division 688-0054
Road cuts for utilities or driveways, City of Spokane Valley
Public Works 688-0195 or State Dept of Transportation
324-6000
Pemits and Inspections for electrical wiring State Department of Labor Permits and inspections for Sewer Connection. Spokane County Utilities Division
And Industdes 324-2640 477-3604
Permits and Inspections for on-site septic systems, Spokane Regional Fire sprinkler and alarm systems and private access road inspections. Spokane Valley
Health District 324.1560 Fire Department 692-4122
Slate taw RCW 19.122 requires that prior to any excavation he 'CALL BEFORE YOU DIG' center must be notified. Call before you dig at least 2 working days in advance. 456-8000.
PERMIT EXPIRATION AND REFUNDS
All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is
abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is
finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to
finish the original permit.
All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee
payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be
authorized when no work has been done under th- - rrnit issued. Refunds of not more than 80% of a plan review fee paid may be authorized
when an application is withdrawn or -- -fled x to the plan review being completed.
111b=
Owner / Agent 1 1116 Date (44 11
/j
Staff Approval Date
Project Number: 10001063 Inv: 1
Application
TIIIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 4/20/2010 Page 1 of 2
Project Information:
Permit Use: CONSTRUCT NEW DETACHED 25 X 36 Contact: STEEL STRUCTURES OF AMERICA
RESIDENTIAL GARAGE - STORAGE Address: PO BOX 895
C - S - Z: POST FALLS ID 83877
Setbacks: Front Left: Right: Rear: Phone: (208) 777-8597
Group Name:
Site Information: Project Name:
Plat Key: 001839 Name: OPPORTUNITY TR # 01-354 District: Sout
Parcel Number: 45211.1223 Block:
SiteAddress: 12108 E 4TH AVE
Location:: CSV
Lot:
Owner: Name: SNYDER, ADAM H
Address: 12108 E 4TH AVE
SPOKANE VALLEY, WA 99206
Zoning: UNKN Unknown
Water District: Hold: ❑
Area 29,256 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 1
Review Information:
Review
Building Plan Review
Released By:
Originally Released: 4/20/2010 By: tmelbourn
Landuse/Zoning/EE Conditions
Released By:
Originally Released: 4/20/2010 By: cjjanssen
Permits:
Operator: .11) Printed By: jmm Print Date: 4/20/2010
Project Number: 10001063 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 4/20/2010
Building Permit
Page 2 of 2
Contractor: STEEL STRUCTURES AMERICA Firm: STEEL STRUCTURES AMERICA I
Address: PO BOX 895 Phone: (800) 833-9997
POST FALLS, ID 83854
Description Grp Tvpe
POLE BDLG U-1 VB
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBCC SURCHARGE
This Application: Total Project:
Notes Sq Ft Valuation Sq Ft Valuation
DETACHED 900 $17,100.00 900 $17,100.00
GARAGE /
STORAGE
Totals:
Units
1
1
1
900 $17,100.00 900 $17,100.00
Unit Desc
SELECT
SELECT
SELECT
Fee Amount
$293.25
$73.31
$4.50
Permit Total Fees: $371.06
Notes:
FENCING & LANDSCAPING TO BE INSTALLED PRIOR TO FINAL INSPECTION FOR SHP-28-
05--MH
Payment Summary:
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $371.06 $371.06 $73.31 $297.75
$371.06 $371.06 $73.31 $297.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm
Print Date: 4/20/2010
Permit Center
Spokane 11707 E Sprague Ave, Suite 106
.0,001FValley Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
Community Development www.sPokanevallmovz.com
Residential Construction
Permit Application
PERMIT NUMBER: 10 ( 0
PERMIT FEE:
)6 New Construction
❑ Addition/Remodel
o Other:
❑ Accessory Bldg
o Deck
SITE ADDRESS
5
ASSESSORS PARCEL NO: (-45::Q 11. /?,3 LEGAL DESCRIPTION:
Building owner
Name:kcAa_ .S,n y (141/ -
Address: i?/ E • Uy Ave-.
city: Vet 1 Lai ZiP:c?0` )
Phone: ,,,16/0 O ' FLtict -16q/
'ntact.Person-,
Name: -OIr,D
Phone:3 9g 7
Describe the scope of work in detail:
:Contractor. '' ;.:. ;; ,;.. ';
_ �(
Name:s40 S�`fti Y Atinek .✓ c&)
Address: P.01 , (C;)i
City: Psi- 1 Ls ,Tb Zip: 8387'
.
Phone6Co 3 99 7Fax:
Lic Noc.STE( 5j it4 xp. Date: jc3- (L /1/
City Business Lic No:
Cost of Project:
c2 -(p /C pt,U. b . -- V LaDrckQ(
/3 0M
rrU
**************The following MUST be complete: (write N/A i; A/0 o,f()7
DIMENSIONS: # OF STORIE: PPP C CITABLE SPACE:
2"" FLOOR SQ. FTG: UNFIN BASEIv &
A144-- Rer,xe
/II
DECK/COV. P1 417" SON
,CONS RUC110N (TYPE: HEAT SOURCE: SEWER OR SEPTIC?
HEIGHT TO PEAK: /
tI _q
************
MAIN FLOOR TO SQ.
FTG: qlIc
FINISHED BASEMENT
SQ. FTG:
GA GE SQ.FTG:
IS SURFACE
# OF BEDROOMS:
/OA -
GA
n
DISCLAIMER
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordi--a -,QUA; Plans or additional information may be required to be submitted, and subsequently approved before
this application ca ' ro��.
Signature
Date
Method of Payment: (Faxed permit applications will only be accepted with major bankcard)
❑ Cash 0 Check 0 Mastercard 0 VISA
Bankcard #: Expires: VIN#:
Authorized Signature:
REVISED 8/25/2005
9-1
❑ Other
Spokane
1_ FVa11ey
11707 E Sprague Ave Suite 106 t Spokane Valley WA 99206
509.921.1000 t Fax: 509.921.1008 t cityhall@spokanevalley.org
Residential Plan Submittal Minimums
l�1 Completed Building & Mechanical application with: Accurate address, Parcel
Number and/or Legal Description, description of work, owner and contractor
/ information, signature, and date.
I� Two sets of plans including Site Plan, elevations, floor plans, foundation plans
With details, roof plan, framing plans & details.
Show the height of any proposed buildings or accessory structures.
Ef Floor plan for each floor Dimension to scale (minimum 1/8") and label each
Room (including sq. footage of house and garage on plans) Show each
level of existing house and square footage of any additions.
I All braced wall panel types: show locations and details of installation, including
engineered design.
d Egress windows: Provide at least one window or exterior door approved for
Emergency escape or rescue from a basement and in every room for sleeping.
Smoke detector locations
22" X 30" attic access location �.
fik 18" X 24" crawl space access:
ft One-hour separation detail: between house and garage
27 Floor framing details: Joist type, size, spacing and installation details
Roof framing plan and details
STY Fumace and hot water heater location.
AU header locations: type, size, and connections
/
[a' Foundation plan
Insulation information
Spcmokane'
Valley®
For City Use Only
PLUS Project Number ` ( 1)10_5
Project Address
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevatley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you withrevised target date.
C./ 2 / /(,-
Your
lam
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
D Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
D Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
D Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE
REV 9/07
Apr 19 10 10:45a
rY
r
Chuck Lindquist
STEEL STRUCTURES AMERICA, INC.
1-800-833-9997
Name : �` , Mee a $ s eft
Mailing Address
City State Zip
Job Address
City State A)4,
County Spenera,i .e ZIP
Telephone Home 2.q.19 6.5-1,j Work Yg4.41 (f
77q-.3-677
tar
s0
tares . Kms".
N
N
509-328-1158
Appt. Time
Date
p,1
Sidewall
Building Size x
Gable
x
20' 41°Je 50'gra, 7-8" l g0—
4.
s rd P "
Customer Signature
PLANNING DEPT. APPROVED
8
DATE: 4I aal i o
cit
Sales Signatur
Scale: 3/4 532: