Loading...
2010, 04-21 Permit App: 10001063 Garage1 PERMIT TYPE CONTRACTOR: LICENSE# Stiokanel� TEMPORARY PERMIT SITE ADDRESS PARCEL NUMBER SUBDIVISION BLOCK/LOT ZONING OWNER ADDRESS BUILDING INSPECTOR WATER DIST. 1 2--101) � & Loc \s 22-3 INSPECTION LINE 509-688-0054 GROUP NAME PROJECT NAME BUILDING DIVISION 11707 E. Sprague Avenue, Suite 106 Spokane Valley, WA 99206 PROJECT NUMBER JO- ( uta ISSUE DATE 1--/P1110 PERMIT USE 314 Lhke. #4t rC_ APPLICANT CONTACT SETBACKS FRONT RIGHT LEFT REAR PERMITS PAYMENT SUMMARY TRANS DATE TOTAL FEE AMT OWING RECEIPT # PMT AMT 3`11,0 01-1 `lS NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete. PLUMBING — after rough -in, before covering, and final. MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final. FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL — when complete and prior to occupancy and/or use. All permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site ✓,..- plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access,.' on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must tfe _ completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover. RIGHT-OF-WAY/APPROACH — prior to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and mechanical, City of Spokane Valley Building Division 688-0054 Road cuts for utilities or driveways, City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Pemits and Inspections for electrical wiring State Department of Labor Permits and inspections for Sewer Connection. Spokane County Utilities Division And Industdes 324-2640 477-3604 Permits and Inspections for on-site septic systems, Spokane Regional Fire sprinkler and alarm systems and private access road inspections. Spokane Valley Health District 324.1560 Fire Department 692-4122 Slate taw RCW 19.122 requires that prior to any excavation he 'CALL BEFORE YOU DIG' center must be notified. Call before you dig at least 2 working days in advance. 456-8000. PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be authorized when no work has been done under th- - rrnit issued. Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or -- -fled x to the plan review being completed. 111b= Owner / Agent 1 1116 Date (44 11 /j Staff Approval Date Project Number: 10001063 Inv: 1 Application TIIIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 4/20/2010 Page 1 of 2 Project Information: Permit Use: CONSTRUCT NEW DETACHED 25 X 36 Contact: STEEL STRUCTURES OF AMERICA RESIDENTIAL GARAGE - STORAGE Address: PO BOX 895 C - S - Z: POST FALLS ID 83877 Setbacks: Front Left: Right: Rear: Phone: (208) 777-8597 Group Name: Site Information: Project Name: Plat Key: 001839 Name: OPPORTUNITY TR # 01-354 District: Sout Parcel Number: 45211.1223 Block: SiteAddress: 12108 E 4TH AVE Location:: CSV Lot: Owner: Name: SNYDER, ADAM H Address: 12108 E 4TH AVE SPOKANE VALLEY, WA 99206 Zoning: UNKN Unknown Water District: Hold: ❑ Area 29,256 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 1 Review Information: Review Building Plan Review Released By: Originally Released: 4/20/2010 By: tmelbourn Landuse/Zoning/EE Conditions Released By: Originally Released: 4/20/2010 By: cjjanssen Permits: Operator: .11) Printed By: jmm Print Date: 4/20/2010 Project Number: 10001063 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 4/20/2010 Building Permit Page 2 of 2 Contractor: STEEL STRUCTURES AMERICA Firm: STEEL STRUCTURES AMERICA I Address: PO BOX 895 Phone: (800) 833-9997 POST FALLS, ID 83854 Description Grp Tvpe POLE BDLG U-1 VB Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBCC SURCHARGE This Application: Total Project: Notes Sq Ft Valuation Sq Ft Valuation DETACHED 900 $17,100.00 900 $17,100.00 GARAGE / STORAGE Totals: Units 1 1 1 900 $17,100.00 900 $17,100.00 Unit Desc SELECT SELECT SELECT Fee Amount $293.25 $73.31 $4.50 Permit Total Fees: $371.06 Notes: FENCING & LANDSCAPING TO BE INSTALLED PRIOR TO FINAL INSPECTION FOR SHP-28- 05--MH Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $371.06 $371.06 $73.31 $297.75 $371.06 $371.06 $73.31 $297.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 4/20/2010 Permit Center Spokane 11707 E Sprague Ave, Suite 106 .0,001FValley Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 Community Development www.sPokanevallmovz.com Residential Construction Permit Application PERMIT NUMBER: 10 ( 0 PERMIT FEE: )6 New Construction ❑ Addition/Remodel o Other: ❑ Accessory Bldg o Deck SITE ADDRESS 5 ASSESSORS PARCEL NO: (-45::Q 11. /?,3 LEGAL DESCRIPTION: Building owner Name:kcAa_ .S,n y (141/ - Address: i?/ E • Uy Ave-. city: Vet 1 Lai ZiP:c?0` ) Phone: ,,,16/0 O ' FLtict -16q/ 'ntact.Person-, Name: -OIr,D Phone:3 9g 7 Describe the scope of work in detail: :Contractor. '' ;.:. ;; ,;.. '; _ �( Name:s40 S�`fti Y Atinek .✓ c&) Address: P.01 , (C;)i City: Psi- 1 Ls ,Tb Zip: 8387' . Phone6Co 3 99 7Fax: Lic Noc.STE( 5j it4 xp. Date: jc3- (L /1/ City Business Lic No: Cost of Project: c2 -(p /C pt,U. b . -- V LaDrckQ( /3 0M rrU **************The following MUST be complete: (write N/A i; A/0 o,f()7 DIMENSIONS: # OF STORIE: PPP C CITABLE SPACE: 2"" FLOOR SQ. FTG: UNFIN BASEIv & A144-- Rer,xe /II DECK/COV. P1 417" SON ,CONS RUC110N (TYPE: HEAT SOURCE: SEWER OR SEPTIC? HEIGHT TO PEAK: / tI _q ************ MAIN FLOOR TO SQ. FTG: qlIc FINISHED BASEMENT SQ. FTG: GA GE SQ.FTG: IS SURFACE # OF BEDROOMS: /OA - GA n DISCLAIMER The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordi--a -,QUA; Plans or additional information may be required to be submitted, and subsequently approved before this application ca ' ro��. Signature Date Method of Payment: (Faxed permit applications will only be accepted with major bankcard) ❑ Cash 0 Check 0 Mastercard 0 VISA Bankcard #: Expires: VIN#: Authorized Signature: REVISED 8/25/2005 9-1 ❑ Other Spokane 1_ FVa11ey 11707 E Sprague Ave Suite 106 t Spokane Valley WA 99206 509.921.1000 t Fax: 509.921.1008 t cityhall@spokanevalley.org Residential Plan Submittal Minimums l�1 Completed Building & Mechanical application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor / information, signature, and date. I� Two sets of plans including Site Plan, elevations, floor plans, foundation plans With details, roof plan, framing plans & details. Show the height of any proposed buildings or accessory structures. Ef Floor plan for each floor Dimension to scale (minimum 1/8") and label each Room (including sq. footage of house and garage on plans) Show each level of existing house and square footage of any additions. I All braced wall panel types: show locations and details of installation, including engineered design. d Egress windows: Provide at least one window or exterior door approved for Emergency escape or rescue from a basement and in every room for sleeping. Smoke detector locations 22" X 30" attic access location �. fik 18" X 24" crawl space access: ft One-hour separation detail: between house and garage 27 Floor framing details: Joist type, size, spacing and installation details Roof framing plan and details STY Fumace and hot water heater location. AU header locations: type, size, and connections / [a' Foundation plan Insulation information Spcmokane' Valley® For City Use Only PLUS Project Number ` ( 1)10_5 Project Address 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevatley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you withrevised target date. C./ 2 / /(,- Your lam Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review D Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. D Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. D Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 Apr 19 10 10:45a rY r Chuck Lindquist STEEL STRUCTURES AMERICA, INC. 1-800-833-9997 Name : �` , Mee a $ s eft Mailing Address City State Zip Job Address City State A)4, County Spenera,i .e ZIP Telephone Home 2.q.19 6.5-1,j Work Yg4.41 (f 77q-.3-677 tar s0 tares . Kms". N N 509-328-1158 Appt. Time Date p,1 Sidewall Building Size x Gable x 20' 41°Je 50'gra, 7-8" l g0— 4. s rd P " Customer Signature PLANNING DEPT. APPROVED 8 DATE: 4I aal i o cit Sales Signatur Scale: 3/4 532: