Loading...
2011, 02-02 Permit App: 10003819 GarageProject Number: 10003819 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 2/2/2011 Page 1 of 2 Project Information: Permit Use: GARAGE W/APARTMENT UPSTAIRS Contact: SCHWARTZENBERGER, CHARLES R Address: 12326 E 4TH AVE C - S - Z: SPOKANE VALLEY, WA 99216 Setbacks: Front Left: Right: Rear: Phone: (509) 536-1875 Group Name: Site Information: Project Name: Plat Key: 000000 Name: Range District: Sout Parcel Number: 45222.1736 Block: SiteAddress: 12326 E 4TH AVE Location:: CSV Lot: Owner: Name: SCHWARTZENBERGER, CHARLE Address: 12326 E 4TH AVE SPOKANE VALLEY, WA 99216 Zoning: R-3 SF Res District Water District: 011 MODERN Hold: El Area: 24,932 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Review Building Plan Review Originally Released: 1/28/2011 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Driveway/Approach Originally Released: 11/18/2010 By: cjjanssen Released By: Sewer Review Originally Released: 2/2/2011 By: WMCGAV Released By: Permits: Operator: jmm Printed By: jmm Print Date: 2/2/2011 Project Number: 10003819 Inv: 1 2 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 2/2/2011 Page 2 of 2 Contractor: OWNER Item Description APPROACH -CONST IN ROW Approach Firm: OWNER Phone: (000) 000-0000 Units Unit Desc Fee Amount 1 NUMBER OF $52.00 Permit Total Fees: Building Permit $52.00 Contractor: OWNER Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: Description Grp 1 to Notes Sq Ft Valuation Sq Ft Valuation 2ND FLOOR R-3 VB 2,000 $148,420.00 2,000 $148,420.00 GAR WOOD U-1 VB PLAN 2,000 $38,000.00 2,000 $38,000.00 REVIEW FEE Totals: 4,000 $186,420.00 4,000 $186,420.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $1,480.95 ACCESSORY PLANS REVIEW 1 SELECT $370.24 WSBCC SURCHARGE 1 SELECT $4.50 Permit Total Fees: $1,855.69 Notes: PURSUANT TO SVMC 19.40.020(B) ALL RESIDENTIAL DRIVEWAYS AND OFF-STREET PARKING AREAS SHALL BE PAVED WITH ASPHALT, PORTLAND CEMENT, GRASSCRETE, PAVE BLOCKS OR OTHER EQUIVALENT HARD SURFACE MATERIALS condtion deleted based on revised site plan Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Approach $52.00 $52.00 $0.00 $52.00 Building Permit $1,855.69 $1,855.69 $130.64 $1,725.05 $1,907.69 $1,907.69 $130.64 $1,777.05 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 2/2/2011 Spokane �Valley� Community Development Residential Construction Permit Center k 117-E-Spragug Spo ane Valley,a i -'992 -1-R (509.688-00;3,/F.N.'t$g)5r$W tNd ww .s. okanevalle .o • . III 7 2 ••U Permit Application Name-- Submittal ame---- Submittal #_ PERMIT NUMBER: PERMIT FEE: New Construction Addi>ion/Remodel n Other: Accessory Bldg Deck SITE ADDRESS: y� ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: 0 rIC j �� k " % � ) Name: �% Tc[ r �/i /' 'YE 742677 Addressy d " QJ 4 0� C City:A f!!,` State: ! ip: Phone: 7 Fax: City: Contact Person Name: Phone: Describe the scope of work in detail: Contractor: / /y� c f 'r "� 0 rIC j �� k " # OF STORIES: Name: MAIN FLOOR TO, SQ. FTG: ..t. - Yr �/ 2Nu FLOOR SQ. FTG: _ ' .1 » r o /� Address: IMPERVIOUS/SURFACE AREA: FINISHED B.§IFV1iNT SQ. FTG: City: State: Zip: Phone: Fax: HEAT'SOURCE:SE Contractor Lic No: Exp Date: City Business Lic. No: Cost of Project: $ /e )-21fqr 0 ;4r ap -1;?(/‘iez- Proposed Use: **************The followings MUST be complete: (write N/A if not applicable)********************** HEIo1yO PE K: DIME,J SL,O,N • ./ # OF STORIES: TOT148 A BLE SPACE: MAIN FLOOR TO, SQ. FTG: ..t. - Yr �/ 2Nu FLOOR SQ. FTG: _ ' .1 » r o /� UNFIN BA EMENT SQ. FTG: 1 IMPERVIOUS/SURFACE AREA: FINISHED B.§IFV1iNT SQ. FTG: GAR%4 l'SQ FTG: DEC IU�P�/.,P .TIO SQ. FTG: 1 j�` . 30% SLOPS ON # OF BEDROOM : .- EtOyoll!Iyuttii NITYP�,: �gg HEAT'SOURCE:SE ,O�ATIC? IJ,J The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: Method of Payment: ❑ Cash Bankcard #: Authorized Signature: REVISED 2/15/07 ❑ Check ❑ Mastercard Expires: DATE: 1 � l ❑ VISA VIN#: RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. o SITE PLAN o Property lines and dimensions o Direction arrow pointing North and orientation to streets o Proposed/existing buildings (footprint and dimensions) o Utilities, septic tank/drain field locations and distances o Setbacks to property lines o Distance between buildings o Right of way/easement location & sizes o Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) ❑ Elevations (Front/Rear/Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): o Footing sizes and locations ❑ Perimeter concrete foundation wall sizes o Crawlspace ventilation o Supporting wood cripple walls or beams o Thickened concrete pads supporting beams or girder trusses O Floor Pian of each level (finished or unfinished) with dimensions: o Floor Joist direction, size and spacing o Header, beam or concrete lintel sizes ❑ Brace wall panel locations o Water heater and furnace locations o Exhaust fan locations o Deck or concrete patio sizes and locations ❑ Roof Plan: o Engineered truss direction and spacing o Rafter and over frame direction, size and spacing o Wall Section Detail including: Roof o Slope/ roofing material/ underlayment/ ice dam protection o Sheathing size and type Ceiling 0 Joist size and spacing Wall o Height/ top plate/ stud size and spacing/ sole plate o Exterior sheathing size and type Floor o Joist size and spacing Foundation Wall o Concrete or Masonry unit width o Earth to wood separation distance Footing o Size Radon o Passive system with 6mil vapor barrier Miscellaneous Construction Details ❑ Deck: o Floor plan/ side view/ dimensions o Floor Joist/ decking direction, size and spacing O Stairway tread rise & run and nosing o Window and door location and sizes o Window well locations if applicable o Room usage labels o Smoke detector locations o Attic and crawl space access locations o Fire Wall construction o Ridge, eave and valley lines o Beam and girder size and location o Truss or rafter size, spacing & connection o Attic insulation/ air space baffle/ ventilation o Size of ceiling gypsum wall board o Siding/ exterior house wrap/ anchor bolts o Insulation, vapor barrier, gypsum wall board o Sheathing or concrete floor size/ insulation o Footing bottom to finished ground level depth o Horizontal & vertical reinforcement if any ❑ Reinforcement if any o Active system with 6 mil vapor barrier o Footings/ post/ and beam size and locations O Handrail / Guard height & spacing Spokane Valley Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 perm itcenter@spoka n eva l lev. orq (Staff Use Only) PERMIT NUMBER: PERMIT FEE: APPROACH PERMIT APPLICATION PROJECT ADDRESS: /23.4) E -4/1% --4,‹ START DATE: j ems/ .20l/ ANTICIPATED COMPLETION DATE: ,2v// BUILDING OWNER NAME: t MAILING ADDRESS: CITY: � LLA 114p STTATE: .. ZIP: 7/ /I! ( CONTACT PERSON NAME: C74tG/( Lc- Ler--6,./1- PHONE: er /! PHONE: FAX: CONTRACTOR NAME: MAILING ADDRESS: CITY: CELL: m 17/// e, k C STATE: ZIP: PHONE: FAX: CELL: CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.: PROJECT DESCRIPTION (Please Provide Site Sketch) Residential Driveway ❑ Commercial/Industrial Driveway Li Existing Curb & Gutter ❑ Rural Road Section ❑ Culvert Installation E. Other Conditions: ❑ Sidewalk Repair/Construction Bond/Insurance certification must be on file with the City. DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction, 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit Is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be subrpitted and subsequently approved before this application can be processed. Signatur, Date: % 2 - RECEIVED CSV PERMIT CENTER FEB 9 2011 Project #__._p_-j��` Name_ Submittal # Updated 1-11-11 Page 1 of 1 http://www. spoka neva Iley.org/filestorage/124/938/210/948/ 1496/Approach_Perm it_1-11-11.doc APPROACH PERMIT APPLICATION REQUIRED SKETCH INFORMATION (Revised 1/25/10) Provide required measurements (in sketch boxes), and include street name. Check all existing conditions that apply: O Sidewalk ft wide _ ft from back of curb O Streetside Swale ❑ Drainage Ditch ❑ Drywell (show location on sketch) ❑ Other (please describe below) DISTANCE FROM NEAREST PROPERTY LINE AY BE LEFT OR RIGHT SIDE) FT (SEE TABLE) CONCRETE APPROACH CURB RETURN CURB —THROAT WIDTH =FT --1-41 WINO (SEE TABLE) WING STREET NAME EDGE OF ASPHALT STREET WITH CURB DISTANCE FROM NEAREST PROPERTY LINE AY BE LEFT OR RIGHT SIDE) Fol FT(SEE TABLE) ASPHALT APPROACH I—THROAT WIDTH ©D FT ---If (SEE TABLE) STREET NAME IF CORNER LOT, DISTANCE FROM QU_Ep RETURN FT (SEE TABLE) 15' RADIUS yt4e STREET WITH ASPHALT EDGE RADIUS RETURN \IF CORNER LOT, DISTANCE FROM RADIUS RETURN 0 FT (SEE TABLE) Approach Requirements: • Maximum 2 approaches per property frontage; one on arterials. • Total width of approaches not to exceed 50% of frontage width. Residential Approaches Commercial Approaches Distance from Curb/Radius Return 15' minimum 75' minimum Separation between Approaches (measured from centerline to centerline of each approach) None specified See Page 7-27 In City Street Standards Throat Width (flat portion) 16' min., 30', max. 30' min., 40' max. Wing Width (at curb line) 4 feet typical 4 feet typical Minimum Distance from Side Property Line (@ r/w) 5.0' 5.0' Minimum Distance from Crosswalk 5' 5' Spokane *Valley® For City Use Only PLUS Project Number Project Address 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. - Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE - APPLICANT PINK - BUILDING FILE REV 9/07 CSV PERMIT CENTER 011,1 7 _2010 Project Name— Submittal ame_Submittal # E'ting Single Family Dwelling must be de.riolisned prior to Certificate of Occupancy hr new garage/apartment. PLA ING DEPT. APPROVED B 011(01i1CL)-LAU: DATE: I Pursuant to 19.40.020(B) SVMC: All residential driveways and off-street parking areas shall be paved with asphalt. Portland cement. grasscrete paver blocks or other equivalent hard surface material. N lu) ItAft) iopiy8,,,w140 3r/i7 RECEIVED FEB 0 2 2011 Spokane Valley Permit Center Development Engineering 11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.1000 ♦ Fax: 509.921.1008 ♦ cityhall®spokanevalley.org Approach Permit Application Review TO: Building Department Site Address: 12326 E. 4th Ave. Project No: 10-3819 Reviewed By: I 7/741--( Date: 2hz/// Accepted Not Accepted Approach *X Building Location Paved Access Notes: Saw cutting of existing curb is not allowed within the City's jurisdiction. Driveway is to be inspected by the City's ROW Inspector prior to concrete placement. *Approach shall be constructed per City's Standard Plan R-114 (Driveway Approach Asphalt). Reviewed By: I 7/741--( Date: 2hz/// Spokane e 4, #Valley= Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitceen ter@sooka neva llev.orq (Staff Use Only) PERMIT NUMBER: PERMIT FEE: APPROACH PERMIT APPLICATION PROJECT ADDRESS: /23Z/ E. -4/1X 4..1 START DATE: )gam/ 90// ANTICIPATED COMPLETION DATE: Sep,4 2a// / /,,)k, S / / BUILDING OWNER NAME: &&Z./r o4( c/ pA MAILING ADDRESS: / ?26 s -4 4ve CITY: .t.L_cA,u.p //IJS!TTATE: c —�" ZIP: f CONTACTPERSON NAME: C olltcs F 5' c --6/1-/f ?Orr PHONE: FAX: CELL: CONTRACTOR NAME: MAILING ADDRESS: CITY: beferypt 6-e STATE: ZIp: PHONE: FAX: CELL: CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LIceNSE'No.: PROJECT DESCRIPTION (Please Provide Site Sketch) • gi Commercial/Industrial Driveway [ Rural Road Section LI Sidewalk Repalr/Construction Residential Driveway Existing Curb & Gutter 111 Culvert Installation • Other Conditions: Bond/Insurance certification must be On file with the City. DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) If this permit Is for construction or on a dwelling, the dwelling Is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit Inure to the property owner. 3) The signatory Is the property owner or has permission to represent the property owner in this transaction. 4) All construction Is to be done In full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit Is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Pians or additional Information may be requlred to be subgjltted and subsequently approved before this application can be processed. Date: 2 "-O2 G/ Signatur 44.47 - RECEIVED CSV PERMIT CENTER FEB 022011 Project dt_._10- Submilial Updated 1-11-11 Page 1 of 1 http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Approach_Permit_1-11-11.doc 1 J ct• Scltwar+2 .1� c.rscr P -e s tdc. �-•c C (232& E _ fti Av - SI'�ka (fc1,Iei 1.044 iia F,;::IVEa.) pativin. ()ENTER FEB 0 2 2011 Projeca----- Subrnittal ;1_ — { 5o,,>c r nom^ air " %'itS- Reset - 1