2010, 10-13 Permit App: 10003300 Pole BldgProject Number: 10003300 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: 40 X 30 POLE BLDG Contact: SOLID STRUCTURES
Address: 7718 E BERNHILL RD
C - S - Z: COLBERT WA 99005
Setbacks: Front Left: Right: Rear: Phone: (509) 954-9009
Group Name:
Project Name:
Date: 10/13/2010 Page 1 of 2
Site Information:
Plat Key: 001845 Name: OPPORTUNITY HEIGHTS ADD District: Sout
Parcel Number 45222.0905 Block: Lot:
SiteAddress: 12904 E 4TH AVE Owner: Name: MCGEE LIVING TRUST, LAWREN
Address: 12732 N DAKOTA ST
Location:: CSV SPOKANE, WA 99218 -
Zoning: R-3 SF Res District
Water District: 011 MODERN Hold: ❑
Area: 33,145 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
.Review Information:
Review
Building Plan Review
Released By:
Originally Released:
Landuse/Zoning/HE Conditions
Permits:
10/8/2010 By: tmelbourn
Released By:
Originally Released: 10/13/2010 By: mpalaniuk
Operator: JD Printed By: jmm Print Date: 10/13/2010
Project Number: 10003300 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 10/13/2010 Page 2 of 2
Contractor: Solid Structures
Address: 7718 E Bernhill Rd
COLBERT WA 99005
Description Grp Tvpe Notes
POLE BDLG U-1 VB
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBCC SURCHARGE
Notes:
Building Permit
Firm: Solid Structures
Phone: (509) 216-8672
This Application: Total Project:
So Ft Valuation So Ft Valuation
1,200 $22,800.00 1,200 $22,800.00
Totals: 1,200 $22,800.00 1,200 $22,800.00
Units Unit Desc Fee Amount
1 SELECT $363.25
1 SELECT $90.81
1 SELECT $4.50
Permit Total Fees: $458.56
Payment Summary:
Permit Tvpe Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $458.56 $458.56 $90.81 $367.75
$458.56 $458.56 $90.81 $367.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm
Print Date: 10/13/2010
Spokane
. Valley
Community Development
Residential Construction New Construction M Accessory Bldg
Permit Application n Addition/Remodel U Deck
Other:
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
www.spokanevalley.org
PERMIT NUMBER/0 —33 Oa
PERMIT FEE:
SITE ADDRESS:
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
Building Owner: Utv ,,i Nile.
IL l 1:.
DIMENSIIQN '
Name:
,..�
Name: Soi.1k l l ��;; �ia�..) o Ris
MAIN FLOOR TO SQ.
FTG: law -----..,<.,
`4RAG
Address: 111%
Address:
1aC, . m- -
�
cV _
State: ‘AR
City:
5N4.90 - kA�y
State: \109%
/
Zipl� U�1b
Phone:
00%. e1 0 y
Fax:
Contact Person
Name: \\11094: Va-c c&ti)
Phone: AZC
Describe the scope of work in detail:
Contractor:
DIMENSIIQN '
# OF STORIES: 1
,..�
Name: Soi.1k l l ��;; �ia�..) o Ris
MAIN FLOOR TO SQ.
FTG: law -----..,<.,
`4RAG
Address: 111%
_ i3'tSZiJ1-1I LL Zb
IMPERVIOUS SURFACE
City: Ut-%Ek -c
State: ‘AR
Zip:g005
Phone: fca cI-la
Fax: 70a -J 1).33
Contractor Lic No: Sim'Exp
Date:•3_1k,
`i
City Business Lic. No:
Cost of Project: $ \GHQ
`Oso)( 1Pk e01.i uL1.\‘C
Proposed Use:
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK:
DIMENSIIQN '
# OF STORIES: 1
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
FTG: law -----..,<.,
`4RAG
2Nu FLOOR SQ. FTG:
N1 g
UNFIN BA MENT SQ. FTG:
�\ .C1AREA:
IMPERVIOUS SURFACE
FINISHED BA MENT
SQ. FTG: VIA
SQ. FTG:
0
DECK/COV PATIO SQ. FTG:
1
30% SLOPES ON i1
E ERTY: N�
# OF BEDROQ
CONSTRUCTION TYPE:
HEAT SOURCE:
EWE R SEPTIC?
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
) The
be done
tate or
ed before
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley P
signatory is the property owner or has permission to represent the property owner in this ti
in full compliance with the City of Spokane Valley Development Code. Referenced codes
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or a
local laws, codes or ordinances. 6) Plans or additional information may be required to be tit
this application can be processed. t{(3Gef AoCZ)
SIGNATURE: ,/,/ DATE: Q - 4-r T/1z_
�
Method of Payment:
❑ Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
It Check
❑ Mastercard
Expires:
❑ VISA
VIN#:
CSV PERMIT CENTER
OCT 0 8 2010
Project
Name
Submittal #
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
o SITE PLAN
o Property lines and dimensions
o Direction arrow pointing North and orientation to streets
o Proposed/existing buildings (footprint and dimensions)
o Utilities, septic tank/drain field locations and distances
o Setbacks to property lines
o Distance between buildings
o Right of way/easement location & sizes
o Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
O Elevations (Front/Rear/Sides) with roof peak and wall height including basement:
❑ Foundation Plan (crawlspace, basement or slab on grade):
o Footing sizes and locations
o Perimeter concrete foundation wall sizes
o Crawlspace ventilation
o Supporting wood cripple walls or beams
o Thickened concrete pads supporting
beams or girder trusses
O Floor Plan of each level (finished or unfinished) with dimensions:
o Floor Joist direction, size and spacing
o Header, beam or concrete lintel sizes
o Brace wall panel locations
o Water heater and furnace locations
o Exhaust fan locations
o Deck or concrete patio sizes and locations
O Roof Plan:
o Engineered truss direction and spacing
o Rafter and over frame direction, size and spacing
❑ Wall Section Detail including:
Roof
o Slope/ roofing material/ underlayment/ ice dam protection
o Sheathing size and type
Ceiling
o Joist size and spacing
Wall
o Height/ top plate/ stud size and spacing/ sole plate
o Exterior sheathing size and type
Floor
o Joist size and spacing
Foundation Wall
o Concrete or Masonry unit width
o Earth to wood separation distance
Footing
o Size
Radon
o Passive system with 6mi1 vapor barrier
Miscellaneous Construction Details
❑ Deck:
o frio6r plan/ side view/ dimensions
o Floor•Joist/ decking direption, size and spacing
0 Stairway tread rise & run and nosing
'r
o Window and door location and sizes
o Window well locations if applicable
o Room usage labels
o Smoke detector locations
o Attic and crawl space access locations
o Fire Wall construction
o Ridge, eave and valley lines
o Beam and girder size and location
o Truss or rafter size, spacing & connection
o Attic insulation/ air space baffle/ ventilation
o Size of ceiling gypsum wall board
o Siding/ exterior house wrap/ anchor bolts
o Insulation, vapor barrier, gypsum wall board
o Sheathing or concrete floor size/ insulation
o Footing bottom to finished ground level depth
o Horizontal & vertical reinforcement if any
o Reinforcement if any
o Active system with 6 mil vapor barrier
❑ Footings/ post/ and beam size and locations
O Handrail / Guard height & spacing
Spokane
jUalley
For City Use Only
PLUS Project Number L J�
Project Address
7 c4 I F
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 • Fax: 509.688.0037 • permitcenter®spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is 1 ��
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
> Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at!your new or revised information.
> Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entirereview process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE
REV 9/07
k)8
�1c c 67tsh.1]
E.
-
i
-t$
ry_
9361
-
SLG. £ T i hJ G
fr/ S
3som
Aoxga
oorfr
i
PLANNING DEPT. APPR01
BY. 74477a,
DATE• /O/i3/zo/v
Sbon
'ley
11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206
509.921.1000 ♦ Fax: 509.921.1008 ♦ cityhall®spokanevalley.org
Lawrence McGee
12904 E 41h Ave
Spokane Valley, WA 99216
Ref: Residential Permit Paving Waiver
October 12, 2010
Dear Mr McGee,
You are hereby granted a waiver from the paving requirements contained in Spokane
Valley Municipal Code Section 19.40.020 (B) which states, `fAll residential driveways
and off-street parking areas shall be paved with asphalt, Portland cement, grasscrete,
paver blocks or other equivalent hard surface material."
This waiver is granted only for 12904 E 4th Ave, Project No. 10003300, a 1200 square
foot pole building.
This decision to waive the paving requirement was predicated on the following:
1. Your written statement regarding your anticipated use of the building as storage
and shop use with limited vehicular access.
You are required to notify the City of Spokane Valley if any of these conditions change.
This waiver may be revoked at any time should the conditions of use change such that the
City of Spokane Valley determines paving is warranted. At that time you will be
required to obtain the necessary approval and pave the driveway.
Kathy McClung
Community Development Director
Attachments: Paving Waiver Request
Proposed Site Plan
frirDil C..›211
b l Y , 1Z-61 )-11 -i' 31 14 } .4 -ac y n 71 -»
• a"iSvdM -L3rc;\k5 J 'E ff • c7 s v y
Ai p S- r? a Pi govt HH "1
/-÷-etvni/14 flS tiI k)jaof1...v,3-Dn
L 5'i 7 7 2 11 4,1 /1-1, A vin -;- S-rr
_gym *Tr b b ., o+ S -1� b IA -7.p ry..5 -
a� t g- 4C, .7-5,7 ,--,l j_ C )4 o Q 1- yI-}= ITV -
.%n kia- S d rl al ilii a r "ni Fr O b -C 1
,p2 A 314eni° -C f°- A4 i