Loading...
2013, 04-11 Permit: SW-13000440 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13000440 Permit Issued Date: 04/11/2013 Expiration Date: 04/11/2014 Project Description: SEWER CONNECTION Project Name: CARNAHAN Primary Contact: H & S CONSTRUCTION Phone: 509-926-8964 Applicant: H & S CONSTRUCTION Address: 11817 E VALLEYWAY SPOKANE VALLEY, WA 99206 Phone: 509-926-8964 Email: SITE INFORMATION: Site Address: 4318 E 5TH AVE Parcel Number: 35232.3417 Assessor's Description: CARNHOPE ADD LOTS 2 & 3 EXC E2OFT LT 2 BLK 5 Inspection Area: : (509)-477-3675 Owner: WATKINS, BOYD D Address: 804 SW 148TH ST BURIEN, WA 98166-1861 Phone: Email: Water District: Carnhope Irrigation District Fire District: Spokane Valley Fire #7 Zoning: Land Area: 10800 Square Feet CONTRACTOR INFORMATION: HSCON"123KF, Exp. 05/08/2013 H & S CONSTRUCTION 11817 E VALLEYWAY SPOKANE VALLEY, WA 99206 509-926-8964 DETAILS. Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.0D $125.00 FEE DETAIL' Processing - Utilities Utilities Permit Total Fee: $26.32 $125.00 $151.32 $125.00 CONDITIONS. Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area Possible FEMA Flood Zone CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 04/11/2013 14:33:14 Project Coordinator: Kathy Cummings SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13000440 Permit Issued Date: 04/11/2013 Expiration Date: 04/11/2014 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 04/11/2013 14:33:14 Project Coordinator: Kathy Cummings