Loading...
2012, 04-09 Permit: SW-12001085 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT ti alios Application Number: SW -12001085 Permit Issued Date: 04/09/2012 Expiration Date: Project Description: SEWER CONNECTION Permit Type: SEWER Primary Contact: LAUER EXCAVATION & CONSTRUCTION INC. Applicant: LAUER EXCAVATION & CONSTRUCTION INC. Address: P O BOX 11581 SPOKANE, WA 99220 Phone: (509)981-7954 Email: SITE INFORMATION: Site Address: 4322 E 5TH AVE Owner: RHOADS, GARY Parcel Number: 35232.3416 Address: 2022 S HATCH ST SPOKANE, WA 99203 Subdivision: CARNHOPE ADDITION Phone: Assessor's Description: CARNHOPE ADD LOT 6 & NLY SOFT LT 7 BLK 6 Email: ALL LOT 1 & E2OFT LOT 2 & LOT 12 EXC THE E3OFT OF S85FT LOT 12 BLK 5 Inspection Area: Water District: Camhope Fire District: Fire District 1 Irrigation District #7 Zoning: Land Area: 0.4224 acres / 18400 sgft CONTRACTOR INFORMATION: General Contractor LAUEREC931DA LAUER EXCAVATION & CONST PO BOX 11581 SPOKANE VALLEY, WA 99211 509-893-9070 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL; Processing - Utilities Utilities Permit Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS• Possible Floodzone On Site CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 04/09/2012 10:55:20 Printed by: IIS APPPOOLWSP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12001085 04/09/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 04/09/2012 10:55:20 Printed by: IIS APPPOOLIASP.NET v4.0