Loading...
2008, 09-29 Permit App: 08003860 Carport Permit Center PERMIT NUMBER: pp-3E10 cm of 11703 E Sprague Ave, Suite B-3 Spokane Spokane Valley,WA 99206 PERMIT FEE: Waller (509)688-0036 FAX: (509)688-0037 www.spokanevalley.org Community Development Residential Construction New Construction Accessory Bldg Permit Application nAddition/Remodel Deck n Other: SITE ADDRESS: 4 i � \A ‘—/),-N K A(V" �l I ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: Contractor: Name: �y Name: �� K:, v- �' \,1•',°I\ Address: . v Address: .� . t'")�.i I\ t1> v. 1111.111111 City: , State:, t Zip:ca - li, Zip: Phone: ��12 3, qq... Fax: Phone: IIIMIMIMMIII - Contractor Lic No: ' Exp Date: Contact Person City Business illik Name: �.`va , \--\",,,k Phone: Q,c' t__, `51 ejwi L Describe the scope of work in detail: c r P o- Cost of Project: $ o 1 :p.r,��,� x -2,4,1 clew-r Ls r �t� #c' !n' $ lob Proposed Use: F c \< L.w c 5 **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS: #OF STORIES: TOTAL HABITABLE SPACE: 1, 5i )--!b >' 2--' )4 ( 5 1 g MAIN FLOOR TO SQ. 2N1 FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: -� Z/ u I� P(Ak A__/ ,At ,• AREA: FINISHED BASEMENT GARAGEQ. FTG: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON SQ. FTG: /U/A\ /\,/ .f` /V/ A PROPERTY: #OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OSEPTIC? .N i_.A \/\./ to,11 joa i t V c+ ,/J,G, The permitee verifies,acknowledges and agreed by their signature that: 1) If this permit is for construction of or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal,state or local laws, codes or ordinances.6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. �/ SIGNATURE: i.... lie., DATE: 9 4-°1 0 `�C Method of Payment: 0 Cash 0 Check 0 Mastercard 0 VISA Bankcard#: Expires: VIN#: Authorized Signature: REVISED 2/15/07 RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. ❑ SITE PLAN o Property lines and dimensions o Setbacks to property lines o Direction arrow pointing North and orientation to streets o Distance between buildings o Proposed/existing buildings (footprint and dimensions) o Right of way/easement location &sizes o Utilities, septic tank/drain field locations and distances o Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) ❑ Elevations (Front/Rear/Sides)with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): o Footing sizes and locations ❑ Supporting wood cripple walls or beams o perimeter concrete foundation wall sizes o Thickened concrete pads supporting o Crawlspace ventilation beams or girder trusses ❑ Floor Fan ofreach level (finished or unfinished)with dimensions: o Floor Jot direction, size and spacing o Window and door location and sizes o Header, beam or concrete lintel sizes o Window well locations if applicable o Brace wall' anelocations ❑ Room usage labels o Water heater aid furnc€locations ❑ Smoke detector locations o Exhaust fan latations r o Attic and crawl space access locations o Deck or concrete patio sizes and locations o Fire Wall construction ❑ Roof Plan: o Engineered truss direction and spacing o Ridge, eave and valley lines o Rafter and over frame direction, size and spacing o Beam and girder size and location ❑ Wall Section Detail including: Roof o Slope/roofing material/underlayment/ice dam protection o Truss or rafter size, spacing &connection o Sheathing size and type o Attic insulation/air space baffle/ventilation Ceiling o Joist size and spacing ❑ Size of ceiling gypsum wall board Wall o Height/top plate/stud size and spacing/sole plate o Siding/exterior house wrap/anchor bolts o Exterior sheathing size and type ❑ Insulation, vapor barrier, gypsum wall board Floor o Joist size and spacing o Sheathing or concrete floor size/insulation Foundation Wall o Concrete or Masonry unit width ❑ Footing bottom to finished ground level depth o Earth to wood separation distance o Horizontal &vertical reinforcement if any Footing o Size ❑ Reinforcement if any Radon o Passive system with 6mil vapor barrier o Active system with 6 mil vapor barrier Miscellaneous Construction Details ❑ Deck: o Floor plan/side view/dimensions ❑ Footings/post/and beam size and locations o Floor Joist/decking direction, size and spacing O Stairway tread rise & run and nosing 0 Handrail/Guard height &spacing irN CI 'Orka Project New project Precious pre-app meeting ❑ Ti‘o ne Transmittal Plan recisions City of Spokane Valley Transmittal Date. .0,00Valley Community Development Monday,September 29,2008 Department 11703 E.Sprague Ave,Suite B3 Spokane Valley,WA 99206 Phone:509.688.0036 Site Address: 17411 E 4TH AVE Project Number: 08003860 Parcel Number: 55192.1310 Zoning: MF-1 Water District: Fire District: FD 01 Applicant: HANSON, KYLE H Owner: HANSON, KYLE H 17411 E 4TH AVE 17411 E 4TH AVE SPOKANE VALLEY, WA 99037 SPOKANE VALLEY, WA 99037 (509) 927-8651 e-mail: e-mail: Contact: HANSON, KYLE H Occupant: 17411 E 4TH AVE e-mail: SPOKANE VALLEY, WA 99037 (509) 927-8651 e-mail: Contractor: OWNER Arch/Engineer: l ` ' , i ( ) - 0 JSEP 2 _ e-mail- 1 i_-` r Project H ) ill; ;� Description: ` 1 28 X 24 CARPORT ,, Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATION SITE PLAN (' • PLANS (1.,7- Please Please send all plan review and project comments via e-mail to the highlighted individuals. __T,,,ic,at), , N TI/q7 7 1—,.-- 11- i 7/ aniromm kijirmaimimer ), \ 0 ' qi ���d 7 g • --S- 7.' 1 -- ormaimmoommolm, iii7-7 ' 1-) 4 __... , -oil _..: - ., 1- -a) i (- Ni \--,i. \)'-'; i -'---;""1 I -t_ ) f,A--, f-J-\-5 V 7 i / c, )7 \------- ) Z. Z /' 1 09 -)' L L I (-,\-i ) co)--3 - ''''\ 5' Gv - ,--) --) \ -- . -r-,l9 0� - oL __ ---7 111 C p0 ILL OF M gret.IPA.S I S«,pricM 3 foxb,c 18' •b'I 3 �►. bx6X 1611Re* 4 I 3 8 d 3 Iox (. x �y' -TRWT . L1 +. yWx Jz5c 2B' GM I'5- ego-, 2/ X 1313( Z r RA1''r S IA c,4, 2 t 2V$ 8")( 14' F4ee - rizoN'r/R ce ��. 4')c S I X 7/'6" bse .S Ers cam-. 3' x /Oo' 30L8 pccr I S/ Z!X 26' 21 44Q& " Satr7 %5r/1E7 - II mac. $ "/r /D' L- ,1e7 72/1 65 01 0 5 6 Spam cups ' 525-ra-_ 1 '4' 6E4i.v. scexws los13) 1ri• 1'l.(be "ho 6X CONI) -roA I I I 1°1 >i ,01 Is% �t v 1131, 1% 2Q1 % opt ANO I NMI NM NM N MN OM I MN = 111011 IMO _ ® - M s_r)vd 9,19 N Ha-D /k 43 -3° ') „8 _ —7 eso;/, 3I1L 11111. AIL JUL JEL 11111. i Ma Mx An AM IIIINI Mk- AIli illi it — OM , UM Li -its 44' 'Ii-Ific_a.vA)grcra G. 84 4rEb As 7tromjp,../craz sfErs -,, 41 g *Po\e Ro 4- , , ;‘,..,, 3g - 1 fIn'ir l-, I -t ...‘v v -1\ C&hi c-0-4e, z4'll D 11:z• DIE3 -= i i i i i in i — U i 'MI = En — ma N v , =N. / Nai�s et W M, OS W( c0/-0".0d le�f oC 47 Uk.t P40110b. 14.I •'-r't JC/CW77/ ' car 8,R.DS/�lfr lT' de z n 4''"5.Cer ?i!?e4 oty-V ' 6 X b"rt'o 6 X e co 4 XS X 7114," os?, i/Cud ` O q Q OLCeS 27 '!H, t1crp1 TRiM ( isX/o� pots 10° Lia Pr, K." 0 rte elkcAt E +N/ {{�� a 44 ,- � ,..k.141/4 S'V AP 11 Zgi _ NMI_ 12d,nads z. p i cs.,N F'ncE . . ADD 2-n6%Loc036 oZ,S s Hew�J ........51 2,1 srsill 4s� .._ 3�- 'CELT 4 R.25D' T-- . - 1'( S'HT5 2.116(25'R,, Metgi., 1 i 1 //� yy . q A 6 v bu __ 'V ..._. r I .. _ _10 K POS -— s.. I 60.045 3c9ies ' 2.^6x6 2.JC's 'Ct>,./e••e(k w)Mcn'°.l 'k-rt•Pe AILSIPE'S o '' , ? i NAR,t, 2-K g f RcE s \7_0‘ i.t-u I=' cC,� $EAP1 i "" 6 X/L 21CIPj��� i "64.044/4 -11111-111117-1•11 um NM Miff MIN OM -11111F-11111117UAINIFU--111E- NIL mik iNK L opt-D Cp.c.Cca LArT\01y CAP-9021" TO? v a1!1/ A SsvME-. .It_o' DEAD L At ', s aCA3 csas, *a P avit flox o`c SOP,S:f:) = 45 PSF wveSC CA'5� gok.,--rti' r O r .SPsttst (10(X 507,5E X z= 1060' t\') 111435;1011 5 rZA-'i- It11315 LO ZS---------..—......A 4 . L. --- 2. 2,1 5 'zrOSS 9 I `� r � y a 3c- 'r -`tAz5bt 1s, 5- I �. /� �0�� 1'1 S'H'T3 2,9'�X 25 MRoeE(TA'. i y f Lkt c bve.-elk %A))Mc-4'a., -}'r t.n ALL 51OE5 WoeST CASE SCAM ,�, ^ i Or 17\S-1-4.0.) CE 15E'71.4.1EE`b1 5 eitql = A O t Lt -)C .P6,151- C-o t,, t o Y (i 4s 0s F) : x 5=01 • p,L, L,L, - , ' 550'x's t L ' =r 770°7( MA) . RQuia-r )- t - VX 17.rr)l (4' t>oei 7837'i °L- 67x4rr x ILl Oft- (LV L AM 66AM Driveway Approach Deviations,relocations or alter- ations to existing or designated driveway approaches in subdivisions will require a right of way permit address- ing storm water engineered configuration and sizing. PROVIDE DIAGRAMS AND ENGINEERING LAYOUTS FOR ROOF TRUSSES, BEAMS AND FLOOR SYSTEMS PRIOR TO FRAMING INSPFCTIONS THESE PLANS MUST BE KEPT ON THE JOB SITE Tits BUILDING SUBJECT TO FIELD INSPECTION OORRECT!ONS ✓O,s Va><ley REVIEWED FOR CODE COMPLIANCE SPOKANE VALLEY BM ING (VISION 4` 3� a11 For City Use Onsl PLUS Project Number t)� ~ oC' 1 CITY bF Project Address pokane - a e ° 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. 11 Your application review TARGET DATE is ' ' i `' The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section ofthe application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by i the Permit Specialist at that time. II i WHITE-APPLICANT PINK-BUILDING FILE REV 9/07