2008, 09-29 Permit App: 08003860 Carport Permit Center PERMIT NUMBER: pp-3E10
cm of
11703 E Sprague Ave, Suite B-3
Spokane Spokane Valley,WA 99206 PERMIT FEE:
Waller (509)688-0036 FAX: (509)688-0037
www.spokanevalley.org
Community Development
Residential Construction New Construction Accessory Bldg
Permit Application nAddition/Remodel Deck
n Other:
SITE ADDRESS: 4 i � \A ‘—/),-N K A(V" �l I
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
Building Owner: Contractor:
Name: �y Name: ��
K:, v- �' \,1•',°I\
Address: . v Address: .�
. t'")�.i I\ t1> v.
1111.111111
City: , State:, t Zip:ca - li, Zip:
Phone: ��12 3, qq... Fax: Phone: IIIMIMIMMIII
-
Contractor Lic No: ' Exp Date:
Contact Person City Business illik
Name: �.`va , \--\",,,k
Phone: Q,c' t__, `51 ejwi L
Describe the scope of work in detail: c r P o- Cost of Project: $ o
1 :p.r,��,� x -2,4,1 clew-r Ls r �t� #c' !n' $ lob
Proposed Use: F c \< L.w c 5
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK: DIMENSIONS: #OF STORIES: TOTAL HABITABLE SPACE:
1, 5i )--!b >' 2--' )4 ( 5 1 g
MAIN FLOOR TO SQ. 2N1 FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE
FTG: -� Z/ u I� P(Ak A__/ ,At ,• AREA:
FINISHED BASEMENT GARAGEQ. FTG: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON
SQ. FTG: /U/A\ /\,/ .f` /V/ A PROPERTY:
#OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OSEPTIC?
.N i_.A \/\./ to,11 joa i t V c+ ,/J,G,
The permitee verifies,acknowledges and agreed by their signature that: 1) If this permit is for construction of or on a dwelling,the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal,state or
local laws, codes or ordinances.6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed. �/
SIGNATURE: i.... lie., DATE: 9 4-°1 0 `�C
Method of Payment:
0 Cash 0 Check 0 Mastercard 0 VISA
Bankcard#: Expires: VIN#:
Authorized Signature:
REVISED 2/15/07
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
❑ SITE PLAN
o Property lines and dimensions o Setbacks to property lines
o Direction arrow pointing North and orientation to streets o Distance between buildings
o Proposed/existing buildings (footprint and dimensions) o Right of way/easement location &sizes
o Utilities, septic tank/drain field locations and distances o Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
❑ Elevations (Front/Rear/Sides)with roof peak and wall height including basement:
❑ Foundation Plan (crawlspace, basement or slab on grade):
o Footing sizes and locations ❑ Supporting wood cripple walls or beams
o perimeter concrete foundation wall sizes o Thickened concrete pads supporting
o Crawlspace ventilation beams or girder trusses
❑ Floor Fan ofreach level (finished or unfinished)with dimensions:
o Floor Jot direction, size and spacing o Window and door location and sizes
o Header, beam or concrete lintel sizes o Window well locations if applicable
o Brace wall' anelocations ❑ Room usage labels
o Water heater aid furnc€locations ❑ Smoke detector locations
o Exhaust fan latations r o Attic and crawl space access locations
o Deck or concrete patio sizes and locations o Fire Wall construction
❑ Roof Plan:
o Engineered truss direction and spacing o Ridge, eave and valley lines
o Rafter and over frame direction, size and spacing o Beam and girder size and location
❑ Wall Section Detail including:
Roof
o Slope/roofing material/underlayment/ice dam protection o Truss or rafter size, spacing &connection
o Sheathing size and type o Attic insulation/air space baffle/ventilation
Ceiling
o Joist size and spacing ❑ Size of ceiling gypsum wall board
Wall
o Height/top plate/stud size and spacing/sole plate o Siding/exterior house wrap/anchor bolts
o Exterior sheathing size and type ❑ Insulation, vapor barrier, gypsum wall board
Floor
o Joist size and spacing o Sheathing or concrete floor size/insulation
Foundation Wall
o Concrete or Masonry unit width ❑ Footing bottom to finished ground level depth
o Earth to wood separation distance o Horizontal &vertical reinforcement if any
Footing
o Size ❑ Reinforcement if any
Radon
o Passive system with 6mil vapor barrier o Active system with 6 mil vapor barrier
Miscellaneous Construction Details
❑ Deck:
o Floor plan/side view/dimensions ❑ Footings/post/and beam size and locations
o Floor Joist/decking direction, size and spacing
O Stairway tread rise & run and nosing 0 Handrail/Guard height &spacing
irN CI 'Orka Project New project
Precious pre-app meeting ❑
Ti‘o ne
Transmittal Plan recisions
City of Spokane Valley Transmittal Date.
.0,00Valley
Community Development Monday,September 29,2008
Department
11703 E.Sprague Ave,Suite B3
Spokane Valley,WA 99206
Phone:509.688.0036
Site Address: 17411 E 4TH AVE Project Number: 08003860
Parcel Number: 55192.1310
Zoning: MF-1 Water District:
Fire District: FD 01
Applicant: HANSON, KYLE H Owner: HANSON, KYLE H
17411 E 4TH AVE 17411 E 4TH AVE
SPOKANE VALLEY, WA 99037 SPOKANE VALLEY, WA 99037
(509) 927-8651
e-mail: e-mail:
Contact: HANSON, KYLE H Occupant:
17411 E 4TH AVE
e-mail:
SPOKANE VALLEY, WA 99037
(509) 927-8651
e-mail:
Contractor: OWNER Arch/Engineer:
l
` ' ,
i
( ) - 0 JSEP 2 _
e-mail- 1 i_-` r
Project H ) ill; ;�
Description: ` 1
28 X 24 CARPORT ,,
Building Landuse Engineer Utilities Health Fire Dist Assessor
APPLICATION
SITE PLAN (' •
PLANS
(1.,7-
Please
Please send all plan review and project comments via e-mail to the
highlighted individuals.
__T,,,ic,at), , N
TI/q7 7
1—,.-- 11- i 7/ aniromm kijirmaimimer ),
\ 0 ' qi
���d 7
g • --S- 7.' 1 -- ormaimmoommolm, iii7-7 '
1-) 4 __... , -oil _..: - .,
1-
-a) i (- Ni \--,i. \)'-'; i -'---;""1 I -t_ ) f,A--, f-J-\-5 V
7
i / c, )7
\------- ) Z. Z /' 1 09 -)' L L
I
(-,\-i ) co)--3 - ''''\ 5' Gv - ,--) --) \
-- . -r-,l9 0� - oL __ ---7
111 C p0
ILL OF M gret.IPA.S
I
S«,pricM
3 foxb,c 18' •b'I
3 �►. bx6X 1611Re* 4
I 3 8 d
3 Iox (. x �y' -TRWT . L1
+. yWx Jz5c 2B' GM
I'5- ego-, 2/ X 1313( Z r RA1''r S
IA c,4,
2 t 2V$ 8")( 14' F4ee - rizoN'r/R ce
��. 4')c S I X 7/'6" bse .S Ers
cam-. 3' x /Oo' 30L8 pccr
I S/ Z!X 26' 21 44Q& " Satr7 %5r/1E7 -
II mac. $ "/r /D' L- ,1e7 72/1
65 01 0 5 6 Spam cups
' 525-ra-_ 1 '4' 6E4i.v. scexws los13)
1ri• 1'l.(be "ho 6X CONI) -roA
I
I
I
1°1
>i
,01
Is%
�t
v
1131, 1% 2Q1 %
opt ANO
I NMI NM NM N MN OM I MN = 111011 IMO _ ® - M
s_r)vd 9,19
N Ha-D /k 43
-3° ') „8 _
—7
eso;/,
3I1L 11111. AIL JUL JEL 11111. i Ma Mx An AM IIIINI Mk- AIli illi it — OM , UM
Li -its 44' 'Ii-Ific_a.vA)grcra G. 84 4rEb As 7tromjp,../craz sfErs
-,,
41 g
*Po\e Ro 4-
, , ;‘,..,,
3g - 1 fIn'ir
l-, I -t
...‘v v
-1\
C&hi c-0-4e, z4'll D 11:z• DIE3
-= i i i i i in i — U i 'MI = En — ma N v , =N.
/ Nai�s
et
W M, OS W( c0/-0".0d le�f oC
47 Uk.t P40110b. 14.I •'-r't JC/CW77/ ' car 8,R.DS/�lfr lT'
de
z n 4''"5.Cer ?i!?e4 oty-V ' 6 X b"rt'o 6 X e co
4 XS X 7114," os?, i/Cud ` O q Q OLCeS
27 '!H, t1crp1 TRiM ( isX/o� pots
10° Lia Pr, K."
0 rte elkcAt E +N/
{{�� a 44 ,- �
,..k.141/4 S'V AP
11 Zgi _
NMI_ 12d,nads
z. p i cs.,N F'ncE . .
ADD 2-n6%Loc036
oZ,S s Hew�J ........51
2,1 srsill 4s� .._
3�- 'CELT 4 R.25D' T-- . -
1'( S'HT5 2.116(25'R,,
Metgi.,
1
i 1
//� yy .
q A 6 v bu __ 'V ..._. r I .. _ _10 K
POS -— s.. I
60.045
3c9ies ' 2.^6x6 2.JC's 'Ct>,./e••e(k w)Mcn'°.l 'k-rt•Pe AILSIPE'S
o '' , ? i NAR,t, 2-K g f RcE s \7_0‘ i.t-u I=' cC,�
$EAP1 i "" 6 X/L 21CIPj���
i "64.044/4
-11111-111117-1•11 um NM Miff MIN OM -11111F-11111117UAINIFU--111E- NIL mik iNK
L opt-D Cp.c.Cca LArT\01y
CAP-9021" TO? v a1!1/
A SsvME-. .It_o' DEAD L At ', s aCA3 csas, *a P avit flox o`c SOP,S:f:) = 45 PSF
wveSC CA'5� gok.,--rti' r O r .SPsttst (10(X 507,5E X z= 1060' t\') 111435;1011 5 rZA-'i- It11315
LO
ZS---------..—......A 4
. L. ---
2.
2,1 5 'zrOSS 9 I `� r � y a
3c- 'r -`tAz5bt 1s, 5- I �. /� �0��
1'1 S'H'T3 2,9'�X 25 MRoeE(TA'. i
y f
Lkt c bve.-elk %A))Mc-4'a., -}'r t.n ALL 51OE5
WoeST CASE SCAM ,�, ^ i Or
17\S-1-4.0.) CE 15E'71.4.1EE`b1 5 eitql = A O t
Lt -)C .P6,151- C-o t,,
t o Y (i 4s 0s F) : x 5=01 •
p,L, L,L,
- , ' 550'x's t L ' =r 770°7( MA) .
RQuia-r )- t - VX 17.rr)l (4' t>oei 7837'i
°L- 67x4rr x ILl
Oft-
(LV L AM 66AM
Driveway Approach Deviations,relocations or alter-
ations to existing or designated driveway approaches in
subdivisions will require a right of way permit address-
ing storm water engineered configuration and sizing.
PROVIDE DIAGRAMS AND
ENGINEERING LAYOUTS FOR
ROOF TRUSSES, BEAMS AND
FLOOR SYSTEMS PRIOR TO FRAMING
INSPFCTIONS
THESE PLANS MUST BE KEPT
ON THE JOB SITE
Tits BUILDING SUBJECT
TO FIELD INSPECTION OORRECT!ONS
✓O,s
Va><ley
REVIEWED FOR CODE COMPLIANCE
SPOKANE VALLEY BM ING (VISION
4` 3� a11
For City Use Onsl
PLUS Project Number t)� ~ oC' 1
CITY bF Project Address
pokane -
a e °
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
11
Your application review TARGET DATE is ' ' i `'
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure,you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section ofthe application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by
i the Permit Specialist at that time.
II
i WHITE-APPLICANT PINK-BUILDING FILE REV 9/07