Loading...
2013, 08-26 Permit App: BLD-2013-1640 Residence "—immunity Development Department "' (Staff Use Only) rmit Center 11703 East Sprague Avenue, Suite B-3 PERMIT NUMBER: Spo kane Spokane (50 ) Gley, W03 99206 Tel: (509) 688 0036 PERMIT FEE: Valle Fax: 688-0037 oermitcenitcenter@sookanevalley.orq 40,0 _ '-' 7.Q' c 3 — ((0 .610 RESIDENTIAL CONSTRUCTION PERMIT APPLICATION --------i SINEW CONSTRUCTION , ADDITION/REMODEL E AAtSSbkv-BUIL- N&------------ DECK E OTHERTVFD R E SITE ADDRESS: / g//s *64-7 as AUG �„ ASSESSORS PARCEL NO.: LEGAL DESCRIPTION: LG 2 6 2013 A '\1 ' BUILDING OWNER NAME: kGGy 0-7 g4 ry cPT c. +.;iii ,.,=.:niTf-R / NAME: ii/e /c/` SUB # 7-1- { 7 --1 f /' 20 �slr v e___ ...,.-.�. __. ADDRESS: Il i��J ��/ � / _ __ ._. . ,....._..... CITY: Fevia‘...i (�-- 4'1/ STATE# ZIp: 99x/6 PHONE: 4. oR9 �7� FAX: CELL: ��"Ae e CONTACT NAME: A -c2._ 0-i"-- -- PHONE: -- --PHONE: FAX: CELL: CONTRACTOR NAME: MAILING ADDRESS: / // /_ __ CITY: O (�4 V 7? "A1C ZIP:• PHONE: FAX: CELL: CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: ****YOU MUST COMPLETE THE FOLLOWING*** MARK NJA IF NOT APPLICABLE Height to Pealy� Dimensions: D No. of Stories: Total Habitable�,�� �D,55 /rG! 'iZ X i4./ ©#1 Space: Main Floor SQ FT: Upper Floor SQ FT: Unfinished asement SQ Finished Basement SQ /17/2•49 /yZ0 FT: /1-)/04- FT: /e/20 Garage SQ FT: Deck/Covered Patio SQ Impervious Surface 30% Slopes orL 3 O 8' Sr N FT: /� Area: Property: �— No. of Bedrooms: Construction Type: Heat Source: 1‘...42 ewer r Septic: TOTAL COST OF PROJECT: $ /p74©DO . /41 DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be ubmitted and subsequently approved before this application can be processed. 6'_..—;1,,-- SignatureDate: l'--- 2 '-----/'Updated 1-11-11 Page 1 of 1 http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Building_Permit__Residential_11-11-11.doc RESIDENTIAL CHE 1ST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. o SITE PLAN $ Property lines and dimensions t)t Setbacks to property lines N Direction arrow pointing North and orientation to streets Distance between buildings Proposed/existing buildings (footprint and dimensions) t}i'Right of way/easement location &sizes iitt Utilities, septic tank/drain field locations and distances Ar Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) ill Elevations (Front/Rear/Sides)with roof peak and wall height including basement: Foundation Plan (crawlspace, basement or slab on grade): o Footing sizes and locations ❑ Supporting wood cripple walls or beams o Perimeter concrete foundation wall sizes o Thickened concrete pads supporting o Crawlspace ventilation beams or girder trusses ❑ Floor Plan of each level (finished or unfinished)with dimensions: E Floor Joist direction, size and spacing r/Window and door location and sizes Q Header, beam or concrete lintel sizes e(Window well locations if applicable ®`Brace wall panel locations Room usage labels rlWater heater and furnace locations o/Smoke detector locations d Exhaust fan locations d Attic and crawl space access locations Deck or concrete patio sizes and locations of Fire Wall construction ❑ Roof Plan: ci Engineered truss direction and spacing lRidge, eave and valley lines uiRafter and over frame direction, size and spacing o Beam and girder size and location ❑ Wall Section Detail including: Roof EF-Slope/roofing material/underlayment/ice dam protection 0-Truss or rafter size, spacing &connection sheathing size and type tic insulation/air space baffle/ventilation Ceiling rioist size and spacing c -Size of ceiling gypsum wall board Wall a Height/top plate/stud size and spacing/sole plate ,e'Siding/exterior house wrap/anchor bolts p-Exterior sheathing size and type 2-Insulation, vapor barrier, gypsum wall board Floor o Joist size and spacing o Sheathing or concrete floor size/insulation Foundation Wall q•Concrete or Masonry unit width ta4'ooting bottom to finished ground level depth Earth to wood separation distance arHorizontal &vertical reinforcement if any Fooling (Size o Reinforcement if any Radon dipassive system with 6mil vapor barrier o Active system with 6 mil vapor barrier Miscellaneous Construction Details ❑ Deck: o Floor plan/side view/dimensions ❑ Footings/post/and beam size and locations o Floor Joist/decking direction, size and spacing ❑ Stairway tread rise &run and nosing 0 Handrail/Guard height&spacing • Target Date sheet For City Use Only PLUS ProjectSjökane R 411000 Valley® v 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.720-5240 • Fax: 509.688.0037♦ permitcenter®spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application,we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date,we will contact you with a revised target date. 741Ij Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review > Submit complete,accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. > Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. . > Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date.Staff may contact you before the target date if the initial review is complete.By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete,your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3.Technical Compliance.Once an application is administratively complete,it is routed to technical staff for compliance review. Depending on the type of project,technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals,each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received,a Permit Specialist will process the application and contact the person specified on your application for permit pick-up.Information regarding fees and pre-construction meetings(if required)will be provided by the Permit Specialist at that time. CD-003 V-7/06-21-11 Page 1 of 1