Loading...
2008, 03-11 Permit App: 08000748 GarageProject Number: 08000748 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Date: 3/11/2008 Page 1 of 2 Permit Use: 24 X 24 GARAGE Setbacks: Front Left: Site Information: Plat Key: Right: Rear: Name: CARNHOPE ADD Contact: DANA, PAUL & SUSNA E Address: 4501 E SUMAC DR C - S - Z: SPOKANE, WA 99223 Phone: (509) 448-5687 Group Name: Project Name: District: West Parcel Number: 35232.3009 SiteAddress: 4607 E 5TH AVE Location:: CSV Zoning: 14-3 Water District: Area: 13,500 Sq Ft Nbr of Bldgs: 0 Review Information: Block: SF Res District Width: 0 Nbr of Dwellings: 0 Lot: Owner: Name: DANA, PAUL & SUSNA E Address: 4501 E SUMAC DR SPOKANE, WA 99223 Hold: ❑ Depth: 0 Right Of Way (ft): 0 Review Building Plan Review Released By: Originally Released: Landuse/Zoning/HE Conditions Permits: 3/10/2008 By: tmelbourn Released By: Originally Released: 3/7/2008 By: mharnois Operator: JD Printed By: JD Print Date: 3/11/2008 Project Number: 08000748 Inv: I Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 3/11/2008 Contractor: OWNER Description Grp Type Notes GARAGE U-1 VB Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBC SURCHARGE Notes: BLA requires survey. Building Permit Page 2 of 2 Firm: OWNER Phone: (000) This Application: Sq Ft Valuation 576 $10,944.00 Totals: 576 $10,944.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Permit Total Fees: 000-0000 Total Project: So Ft Valuation 576 $10,944.00 576 $10,944.00 Fee Amount $195.25 $48.81 $4.50 $248.56 Payment Summary: Permit Type • Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $248.56 $248.56 $0.00 $248.56 $248.56 $248.56 $0.00 8248.56 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 3/11/2008 -ire 1 .I0.°'''° Community Development Residential Construction Permit Application ?errntt Cerlt.i 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688.0036 FAX: (509)688-0037 www.spo anevallCY.org PERMIT a�ll.11ll:1ER: PEL'vli'f FEE: CI New Construction 0 Accessory Bldg Addition/Remodel Deck Other: SITE ADDRESS: 4607 E. 5th ASSESSORS PARCEL NO: 36232.3009 LEGAL DESCRIPTION: Carnhope Add, Lots 7, 8 Bik 1 Building Owncri DIMENSIONS: 24x24 # OF STORIES: 1 Name: Paul Dana MAIN FLOOR TO SQ. FTG: nla 2FLOOR SQ. FTG: nla Address: 4501 S. Sumac Dr IMPERVIOUS SURFACE AREA: nla FINISHED BASEMENT SQ. FTG: a C'iry: Spokane State: WA Zip: 99223 Phone: (609) 448.6687 Fax: HEAT SOURCE: n/a Contact Person Name: Paul Dana Phone: (609) 4486687 1 Describe the scope of work in detail: Contractor: DIMENSIONS: 24x24 # OF STORIES: 1 Tame: Owner MAIN FLOOR TO SQ. FTG: nla 2FLOOR SQ. FTG: nla Address: IMPERVIOUS SURFACE AREA: nla FINISHED BASEMENT SQ. FTG: a City.: Stale: Zip: Phone: Fax: HEAT SOURCE: n/a Contractor Lic No: Exp Data: City Business Lic. No: Cost of Project: $ Construct 24' x 24' Garage. Stick frame walls and roof. Metal siding. Proposed Use: Garage **************'!'he followinQMUUST be complete: (write NIA if not app1icable)*************'********* . HEIGHT TO PEAK: 13 DIMENSIONS: 24x24 # OF STORIES: 1 . TOTAL HABITABLE SPACE: nla MAIN FLOOR TO SQ. FTG: nla 2FLOOR SQ. FTG: nla UNFIN BASEMENT SQ. FTG: : nla IMPERVIOUS SURFACE AREA: nla FINISHED BASEMENT SQ. FTG: a GARAGE SQ. FT 576 D DECK/COV. PATIO SO. FTG: nla 30% SLOPES ON . PROPERTY: nia # OF BEDROOMS: rda CONSTRUC IONsidTYPE: HEAT SOURCE: n/a SEWER, OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelikag istwiil be served by potable water. 2} Ownership of this City of Spokane Valley Permit inure to the property owner. 3} The signatory is the property owner or has permission to represent the property owner in this transaction, 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane VaKey Permit Center, 5 This City of Spokane Valley Permit is not a permit or approval tor any violation of federal, state or local taws, co s or ordinan 6) ' ` ans or additional information may be required to be submitted, and subsequently approved before this application SIGNATURE: Method of Payment ❑ Cash Bankcard #: Authorized Signature: REVISE02m5:07 0 Check ❑ Mastercard Expires: DATE: ❑ VISA VINO. Spokane jvalley For City Use Only PLUS Project Number D%� Project Address L4,1)7 E F4-• 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is \oY The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07