2014, 09-02 Permit: SW-14001301 Sewer SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-14001301 Permit Issued Date: 09/02/2014 Expiration Date: 09/02/2015 Project Description: SEWER CONNECTION Project Name: CLEMENT Primary Contact: SEIMEARS, SHARON G/ZIER, KELLY Applicant: SEIMEARS, SHARON G/ZIER, KELLY Phone: 509-294-9703 Address: 18124 E 4TH AVE SPOKANE VALLEY,WA 99206 Phone: 509-294-9703 Email: SITE INFORMATION: Site Address: 18124 E 4TH AVE Owner: SEIMEARS, SHARON G/ZIER, KELLY Parcel Number: 55191.0614 Address: 18124 E 4TH AVE SPOKANE VALLEY,WA 99206 Phone: 509-294-9703 Assessor's Description: (CITY OF SPOKANE VALLEY) SHP 11-07 LT 1 Email: (AUDITORS#5698929 BK 24 PGS 89&90)(BEING A PTN OF E119FT LT 6 BLK 28 OF CORBIN ADD TO GREENACRES) Inspection Area: : (509)-477-3675 Water District: Consolidated Irrigation Fire District: Spokane Valley Fire District#19 Zoning: Land Area: 17252 Square Feet CONTRACTOR INFORMATION: OWNER, Exp. 12/31/2015 OWNER PERFORMING THE WORK SAME AS SITE ADDRESS SAME,WA 00000 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $26.64 Utilities Permit $125.00 Total Fee: $151.64 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE(1)YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed:09/02/2014 11:15:45 Project Coordinator:Kathy Cummings SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-14001301 Permit Issued Date: 09/02/2014 Expiration Date: 09/02/2015 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed:09/02/2014 11:15:45 Project Coordinator:Kathy Cummings