2013, 10-08 Permit: SW-13001795 Sewer SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-13001795 Permit Issued Date: 10/08/2013
Expiration Date: 10/08/2014
Project Description: SEWER CONNECTION
Project Name: CLEMENT
Primary Contact: NORM'S EXCAVATING INC Applicant: NORM'S EXCAVATING INC
Phone: 509-928-0580 Address: PO BOX 30873
SPOKANE,WA 99223
Phone: 509-928-0580
Email: tina@normsexcavating.com
SITE INFORMATION:
Site Address: 18403 E 4TH AVE Owner: GILSTRAP, DAVID W&JENNIFER
WALLACE
Parcel Number: 55191.0534 Address: 18403 E 4TH AVE
GREENACRES,WA 99016-7710
Phone:
•
Assessor's Description: CORBIN ADD TO GREENACRES THE S 225FT OF Email:
TR D SP93-926 AUDITORS FILE#9407080133,
BEING A PTN OF LT 6 BLK 27
Inspection Area: : (509)-477-3675
Water District: Consolidated Irrigation Fire District: Spokane Valley Fire
District#19
Zoning: Land Area: 0.48 Acre(s)
CONTRACTOR INFORMATION:
NORMSEI972BM, Exp.02/06/2015
NORM'S EXCAVATING INC
PO BOX 30873 SPOKANE,WA 99223
509-928-0580
tina@normsexcavating.com
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing-Utilities $26.32
Utilities Permit $125.00
Total Fee: $151.32
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE(1)YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
Date Printed: 10/08/2013 09:23:29 Project Coordinator:Dawn Dompier
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-13001795 Permit Issued Date: 10/08/2013
Expiration Date: 10/08/2014
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
1 �I
1i
Date Printed: 10/08/2013 09:23:29 Project Coordinator:Dawn Dompier