Loading...
2013, 06-07 Permit: SW-13000945 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13000945 Permit Issued Date: 06/07/2013 Expiration Date: 06/07/2014 Project Description: Project Name: Primary Contact: Phone: SEWER ABANDONMENT CARNAHAN ROB'S DEMOLITION 509-534-2970 Applicant: ROB'S DEMOLITION Address: Phone: 3810 E BOONE AVE #203 SPOKANE, WA 99202 509-534-2970 Email: jay.robs@gmail.com SITE INFORMATION: Site Address: Parcel Number: 5119 E 5TH AVE 35231.1236 Assessor's Description: CAROLINE W 5FT OF LT 4; E 60FT LT 5; LT 6; EXC W 216.5FT BLK 2; EXC HWY Inspection Area: : (509)-477-3675 Zoning: Owner: Address: Phone: Email: Water District: Carnhope Irrigation District #7 STATE OF WASHINGTON - DOT 2714 N MAYFAIR ST SPOKANE, WA 99207-2090 Fire District: Spokane Valley Fire Land Area: 11182 Square Feet CONTRACTOR INFORMATION• ROBSDDI97ORR, Exp. 12/22/2013 ROB'S DEMOLITION 3810 E BOONE AVE #203 SPOKANE, WA 99202 509-534-2970 jay.robs@gmail.com DETAILS: Class Type Quantity Unit Charge Value SEWER ABANDONMENT FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $26.32 $125.00 $151.32 1 $125.00 $125.00 $125.00 CONDITIONS. Possible FEMA Flood Zone Inside Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. CALL 1-800424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 06/07/2013 11:04:50 Project Coordinator: Kathy Cummings SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13000945 Permit Issued Date: 06/07/2013 Expiration Date: 06/07/2014 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 06/07/2013 11:04:50 Project Coordinator. Kathy Cummings