2008, 12-08 Permit App: 08004710 Pole Bldg Project Number: 08004710 Inv: 1 Application Date: 12/8/2008 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: NEW 48 X 36 POLE BLDG Contact: STEEL STRUCTURES OF AMERICA
Address: PO BOX 895
C-S-Z: POST FALLS ID 83877
Setbacks:Front Left: Right: Rear: Phone: (208)777-8597
Group Name:
Site Information: Project Name:
-- - ,..5,✓t". dR.nB.bY,N'�ZS �t '^..C«4#�# ..^^^vr'z2'__�ua.'. '��v`ea:.^.r ,�aw��„Eei-.s."m.:,'�' '�6'§NW4&�" k`.'x5. .^.a,,9w..Rd�tlY 1tii$�aA.z im.xt.fiA$'W'.�.F.wYn 4+:".. '.>.".:....
Plat Key: 000501 Name: CORBIN ADD TO GREENACRES District: East
Parcel Number: 55191.0533 Block: Lot:
SiteAddress: 18409 E 4TH AVE Owner:Name: TOLLISON,R W&LYNNE
Address: 18409 E 4TH AVE
Location::CSV SPOKANE VALLEY WA 99016
Zoning: R-3 SF Res District
Water District: Hold: ❑
Area: .89 Acres Width: 0 Depth: 0 Right Of Way(ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review In ormat[on: t... :# u
Review
Building Plan Review Released By:
Originally Released: 12/8/2008 By: TMELBOU
Landuse/Zoning/HE Conditions Released By:
Originally Released: 12/8/2008 By: cjjanssen
Operator: jmm Printed By: JD Print Date: 12/8/2008
Project Number: 08004710 Inv: 1 Application Date: 12/8/2008 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Building Permit
Contractor: STEEL STRUCTURES AMERICA Firm: STEEL STRUCTURES AMERICA I
Address: PO BOX 895 Phone: (800)833-9997
POST FALLS,ID 83854
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
POLE BDLG U-1 VB 48 X 36 1,728 $32,832.00 1,728 $32,832.00
POLE BLDG
Totals: 1,728 $32,832.00 1,728 $32,832.00
Item Description Units Unit Desc Fee Amount
RESIDENTIAL PERMIT FEE 1 SELECT $472.05
ACCESSORY PLANS REVIEW 1 SELECT $118.01
WSBC SURCHARGE 1 SELECT $4.50
Permit Total Fees: $594.56
Notes•-
n .. ._ ,-,, . yah�� -_. ae4.14 ,.; __ ...x ..._
Payment Summary: . naaQ a7 ^„fix ficr
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $594.56 $594.56 $0.00 $594.56
$594.56 $594.56 $0.00 $594.56
Disclaimer:
Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information
contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: JD Print Date: 12/8/2008
Permit Center C�
S Okane 11707 E Sprague Ave, Suite 106 PERMIT NUMBER:f�-t iCJ
Valle Y Spokane Valley,WA (50920996)688-0037 PERMIT FEE:(509}688-0036 FAX:
110
Community Development www•spokanevalley.org.coin l-°1-� U
Residential Construction onstruction AAccessory Bldg
Permit Application ❑ Addition/Remodel o Deck
❑ Other:
SITE ADDRESS /8 Lf E. LI* Ave_• S okavd JCL l kd
ASSESSORS PARCEL NO: 55(S /. 3 3 LEGAL DESCRIPTION: l•
Building owner =Contractor.
f l
Name: pb �-.-�-4 1r'1lrl'e_ `t—(� (1(-son Name: S led •I Y uc1 S �(Vl�'Xl c�1
Address:h�q(�9,
All
, � A�, Address:Q.t . O�, 89�J
City: fy� Flo l Zip: gi0/�U City poS#- TJ/S'i z)0: 633c 77
Phone:ll Fat: Phone )77 7-7 'ax• ,57-8(i 7
Lic No: i y4 :t Date: i </ado-/
Contact Person_:
City Business Lic No:
Name: I . -
Phone 777
-7990
Describe the scope of work in detail: Cost of Project: $ a 1 , cO •
— ye>c3(0 /L/ --c-)4 ) S\- c Vii,-LoP
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK: D- IMEENSIONS: #OF STORIES: ( TOTAHABITABLE SPACE:
MAIN FCOOR TO SQ. CB
2 FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE
FTG: �q� AREA:
FINISHED BASEMENT RAGE SQ. FTG: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON
SQ. FTG: ��dd d (� PROPERTY:
#OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC?
e J L6Qsn ci N -S P L.re
DISCLAIMER
The permitee verifies,acknowledges and agrees by their signature that 1) If this permit is for construction of or on a dwelling,the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal,state or
local laws,codes or ordinances.6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
Signature Date /p// /��
Method of Payment: (Faxed permit applications will only be accepted with major bankcard)
❑ Cash ❑ Check ❑ Mastercard 0 VISA D Other
Bankcard#: Expires: VIN#:
Authorized Signature:
REVISED 8/25/2005
New ,
QT OF
pokane
.0.0Valle
11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206
509.921.1000 ♦ Fax: 509.921.1008 ♦ cityhall@spokanevalley.org
Residential Plan Submittal Minimums
VCompleted Building & Mechanical application with: Accurate address, Parcel
Number and/or Legal Description, description of work, owner and contractor
information, signature, and date.
VTwo sets of plans including Site Plan, elevations, floor plans, foundationP lans •
With details, roof plan, framing plans & details.
VShow the height of any proposed buildings or accessory structures.
❑ Floor plan for each floor: Dimension to scale (minimum 1/8") and label each
Room (including sq. footage of house and garage on plans) Show each
/ level of existing house and square footage of any additions.
.2 All braced wallaneltypes: show locations and details of installation, including
engineered design.
VEgress windows: Provide at least one window or exterior door approved for
Emergency escape or rescue from a basement and in every room for sleeping.
Smoke detector locations
22" X 30" attic access location
Imo' 18" X 24" crawl space access:
01(k One-hour separation detail: between house and garage
f,a Floor framing details: Joist type, size, spacing and installation details
VRoof framing plan and details
pr Furnace and hot water heater location.
i" All header locations: type, size, and connections
q/ Foundation plan
VInsulation information
App* —'me
STEEL STRUCTURI.3 AMERICA, INC. Date.
1 -800-833-9997
Name I ` i. ent±..1
Mailing Address 1 `c? . 4T .4iXEL 4
City 4 .,It.vtc_R State 4 = Zip ij Q Ot b 14
Job Address Aa..
CountyCity
State r --01.....-S4,_40.
_ 54,_.0.
Zip Sidewall Gable
Telephone Home Work
Building Size S ' x E x ( -
0 10 ! i 2- X 3:' ,Y, to L41/J- ,
/ . , 2 70' 80' 90'
1451
v �D05 o
10' o� 3��c Ir}- Id1 4
In I ,c 5 ep.X. 10 LP —Th
Nu
1725 '
ail• ' \
20' AziO .. ,39.E
tea_ ti
30' Aim .. 51 1 . 0 53a /
40' 4\ R
Al J/4
% �, -
50' PLANNING DEPT. APPROVED N r ., 4 4„.2 I
ByL (i_,i,,l__1 _._ ', -_L__A _. _
\ ti' fii
DATE: au .
70' �^? ,1 '
Q 1-4
_
30' . Jia'.
ci
". 4 241)6. .
au
Scale: 3/4 = 10'
Customer Signature Sales Signature
t
For City Use pnly
CITY OF PLUS Project Number c • 4/'1/U
Project Address f ,, /C 7 f
Spokane ,
Valley®
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
°a ,
Your application review TARGET DATE is
,
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
> Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
> Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure,you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents,as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
I from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete.
I4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section ofthe application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by
1 the Permit Specialist at that time.
1
I
I
WHITE-APPLICANT PINK-BUILDING FILE REV 9/07