2008, 03-18 Permit App: 08000793 AdditionProject Number: 08000793 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 3/18/2008 Page 1 of 2
Project Information:
Permit Use: RESIDENTIAL ADDITION -1 BEDROOM, 1 BTH,
LAUNDRY ROOM
Setbacks: Front
Site Information:
Left: Right:
Rear:
Contact: GERASIMCHUK, EVGENIG
Address: 15912 E JACOBS LN
C - S - Z: SPOKANE WA 99217
Phone: (509) 928-7830
Group Name:
Project Name:
Plat Key: 000000 Name: Range
District: Sout
Parcel Number: 35241.2708 Block:
SiteAddress: 6702 E 5TH AVE
Location:: CSV
Zoning: MF -1
Water District: 020
Area: 5,899 Sq
Nbr of Bldgs: 0
MF MDR District
EAST SPOKANE
Ft Width: 0
Nbr of Dwellings: 0
Lot:
Owner: Name: GERASIMCHUK, EVGENIG
Address: 15912 E JACOBS LN
SPOKANE WA 99217
Hold: ❑
Depth: 0 Right Of Way (ft): 0
Review Information:
Review
Building Plan Review
Released By:
Landuse/Zoning/HE Conditions
Permits:
Released By:
SEE NOTE
Originally Released: 3/10/2008 By: mharnois
Operator: jmm
Printed By: JD
Print Date:
3/18/2008
Project Number: 08000793 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 3/18/2008 Page 2 of 2
Building Permit
Contractor: OWNER Firm: OWNER
Phone: (000) 000-0000
This Application: Total Project:
Description Grp Iyn Notes Sq Ft Valuation Sci Ft Valuation
RES ADD R-3 VB RES 270 $25,647.30 270 $25,647.30
ADDITION
Totals: 270 $25,647.30 270 $25,647.30
Item Description Units Unit Desc Fee Amount
RESIDENTIAL PERMIT FEE 1 SELECT $401.35
WSBC SURCHARGE 1 SELECT $4.50
SF PLNS RVW < 7999 SQ FT 1 SELECT $160.54
Permit Total Fees: $566.39
Notes:
THIS IS AN EXPANSION OF A NONCONFORMING STRUCTURE -THE SETBACK CAN NOT
BE LESS THAN THE SETBACK OF THE EXISTING STRUCTURE ON THIERMAN ROAD -MH
Payment Summary:
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $566.39 $566.39 $0.00 $566.39
$566.39 $566.39 $0.00 $566.39
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: JD Print Date: 3/18/2008
Spokane
1 MalleyL
Community Development
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
www.spokanevalley.org
PERMIT NUMBER: - '77/3
PERMIT FEE:
Residential Construction New Construction Accessory Bldg
Permit Application Addition/Remodel n Deck
762
Other:�/�SITE ADDRESS: (!� �5 iV i 4 2/ "t % 7 `�/2
ASSESSORS PARCEL NO: 3 5c i 1 • e)(7 0 ❑ LEGAL DESCRIPTION: ‘dea/
Building Owner: �� //i�p�i 6ardr/47Mid_
Name:
Address: /5?//
lace)k
City: S'' �r G���
/J J
State: 64 Zip:W2/7
Q2// 7
v
Phone: 9 / 9/
/ Fax: �jG d 7/
Contact Person
Name: eo of//i7 MSC,
Phone:rffi
Describe the scope of work in detail:
Dn
Proposed Use:
Contractor: ,r1Ixe of i0(2�1° '
Name:
# OF STORIES:
/
TOTAL ABITABLE SRACE:
.1•17, .re-_ r7 -
Address:
2Nu FLOOR SQ. FTG:
�/ -
UNFIN BASEMENT SQ. FTG:
///://9_
City:
State:
Zip:
Phone:
Fax:
# OF BEDROOMS: /
/
Contractor Lic No:
Exp Date:
SEWER OR SEPTIC?
JI/v'
City Business Lic. No:
Cost of Project: $ /z2 iO
,w_al 40a/e 4 /,‘l le /6e��0�,,
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK:
/3 13-
DIMENSIONS:
/47/ X/5/
# OF STORIES:
/
TOTAL ABITABLE SRACE:
.1•17, .re-_ r7 -
MAIN FI�Q9R TO SQ.
FTG: 02 704 ,
2Nu FLOOR SQ. FTG:
�/ -
UNFIN BASEMENT SQ. FTG:
///://9_
IMPERVIOUS SURFACE
AREA: / j/4
FINISHED BASEMENT
SQ. FTG: �Y�%I
GARAGE SQ. FT
/J/ ,'�
DECK/COV. PATIO SQ. FT
/1//
30% SLOPES ON
PROPERTY:
# OF BEDROOMS: /
/
CONSTRUCT! N TYPE:
HEAT SOURCE'
,e W1. -/c-_
SEWER OR SEPTIC?
JI/v'
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be cess
SIGNATURE:
Method of Payment:
❑ Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
0 Check
❑ Mastercard
Expires:
DATE:
❑ VISA
VIN#:
*lime
11703 E Sprague Ave Suite 8-3♦ Spokane Valley WA 99206
Spokane ♦509.688.0036 ♦ Fax: 509.688.003 •
7
Valley®
EX Completed Building and Mechanical Application with: Accurate address, Parcel
Number and/or Legal Description, description of work, owner and contractor
information, signature and date.
Three (3) sets of plans including Site Plan, elevations, floor plans, foundation plans
with details, roof plan, framing plans and details.
❑X Show the height of any proposed buildings or accessory structures.
❑X Floor plan for each floor: Dimension to scale(minimum 1/8") and label each room
(including sq footage of house and garage on plans) show each level of existing
house and square footage of any additions.
❑X Egress windows: Provide at least one window or exterior door approved for
emergency escape ortescue from basement and in every room for sleeping.
❑X Floor framing details: Joist type, size, spacing and installation details.
lE1 Roof framing plan and details
Furnace and hot water heater location
ElAll header locations: type, size and connections
❑X Foundation plan
Insulation information
❑X Decks and Stairway details
All braced wall panel types: show locations and details of installation, including
engineered design
Smoke detector locations
22" x 30" attic access location
18" x 24" crawl space access
One-hour separation detail: between house and garage
Spokane
jUalley
For City Use Only
PLUS Project Number S• 6 793
Project Address 67-7(2 E CDA_„
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
�J►y
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
> Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
> Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
> Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE
REV 9/07
Silioreng9e\ftft
jUalley
Site Address: 6702 E 5TH AVE
Parcel Number: 35241.2708
Zoning: MF -1
Fire District: FD 01
Project
Transmittal
City of Spokane Valley
Community Development
Department
11703 E. Sprague Ave, Suite B3
Spokane Valley, WA 99206
Phone: 509.688.0036
New project
Previous pre -app meeting D
Plan revisions
Transmittal Date:
Monday, March 10, 2008
Project Number: 08000793
Water District: EAST SPOKANE
Applicant: GERASIMCHUK, EVGENIG
15912 E JACOBS LN
SPOKANE WA 99217
(509) 928-7830
e-mail: e-mail:
Contact: GERASIMCHUK, EVGENIG Occupant:
15912 E JACOBS LN
SPOKANE WA 99217 e-mail:
(509) 928-7830
e-mail:
Owner: GERASIMCHUK, EVGENIG
15912 E JACOBS LN
SPOKANE WA 99217
Contractor: OWNER
() - 0
Arch / Engineer:
D LSA C IE Dl
D 1
e-mail: � � �� �� �
Project RESIDENTIAL ADDITION -1 BEDROOM, 1 BTH, LAUNDRY ROOM
Description:
Please send all plan review and project comments via e-mail to the
highlighted individuals.
Building
Landuse
Engineer
Utilities
Health
Fire Dist
Assessor
APPLICATION
\
\
CONSTRUCTION PLANS
i
SITE PLAN
TDS
I
Please send all plan review and project comments via e-mail to the
highlighted individuals.
00'
Site Dian
6-70a soh
Seo ane,Va/lqqi-
7L/
Ave.
i�--- .LJ —3
cr-‘
o/rivezda
0
PLANNING DEPT. APPROVED
DATE:
50'