2013, 02-26 Permit: SW-13000108 Sewer SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-13000108 Permit Issued Date: 02/26/2013
Project Description: SEWER CONNECTION
Project Name: MICAVIEW
Primary Contact: MILLER CONSTRUCTION-MEAD Applicant: MILLER CONSTRUCTION-MEAD
Phone: 509-216-0262 Address: 12420 E KRONQUIST
MEAD,WA 99021
Phone: 509-216-0262
Email:
SITE INFORMATION:
Site Address: 18808 E 4TH AVE Owner: MCLEAN,AARON L&DARBY D
Parcel Number: 55202.0268 Address: 18808 E 4TH AVE
SPOKANE VALLEY,WA 99016
Phone:
Assessor's Description: CORBIN ADD TO GREENACRES TRA SP91-710, Email:
AUDITORS#9308030614, BEING A PTN OF LT 7
BLK 22
Inspection Area: : (509)-477-3675
Water District: Consolidated Irrigation Fire District:Spokane Valley Fire
District#19
Zoning: Land Area: 1.45 Acre(s)
CONTRACTOR INFORMATION:
MILLEC*951JR, Exp.04/19/2013
MILLER CONSTRUCTION-MEAD
12420 E KRONQUIST
MEAD,WA 99021
509-216-0262
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing-Utilities $26.32
Utilities Permit $125.00
Total Fee: $151.32
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
Date Printed:02/26/2013 14:29:48 Project Coordinator:Kathy Cummings
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-13000108 Permit Issued Date: 02/26/2013
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME.BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed:02/26/2013 14:29:48 Project Coordinator:Kathy Cummings