Loading...
2008, 07-16 Permit App: 08002675 Pole Bldg Project Number: 08002675 Inv: I Application Date: 7/16/2008 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project In formation: Permit Use: 30 X 48 POLE BLDG Contact: STRAUSER,CYNTHIA G Address: 18817 E 4TH AVE C-S-Z: SPOKANE VALLEY,WA 99016 Setbacks:Front Left: Right: Rear: Phone: (509)701-2224 Group Name: Site Information: Project Name: Plat Key: 000498 Name: CORBIN ADD TO GREENACRES District: East Parcel Number: 55202.0182G Block: Lot: SiteAddress: 18817 E 4TH AVE Owner:Name: STRAUSER,CYNTHIA G Address: 18817 E 4TH AVE Location::CSV SPOKANE VALLEY,WA 99016 Zoning: R-3 SF Res District Water District: 134 CONSOLIDATED ID#19 Hold: ❑ Area: 1.00 Acres Width: 100 Depth: 643 Right Of Way(ft): 40 Nbr of Bldgs: 0 Nbr of Dwellings: 1 Review Information: x r ;:. Review Building Plan Review Released By: , Originally Released: 7/14/2008 By: tmelbourn Septic Sys Review Released By: Originally Released: 7/14/2008 By: LHALSEY Landuse/Zoning/HE Conditions Released By: Originally Released: 7/11/2008 By: tschmidt Operator: JD Printed By: jmm Print Date: 7/16/2008 Project Number: 08002675 Inv: 1 Application Date: 7/16/2008 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: OWNER Firm: OWNER Phone: (000)000-0000 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation POLE BDLG U-1 VB 1,440 $27,360.00 1,440 $27,360.00 Totals: 1,440 $27,360.00 1,440 $27,360.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $421.55 ACCESSORY PLANS REVIEW 1 SELECT $105.39 WSBC SURCHARGE 1 SELECT $4.50 Permit Total Fees: $531.44 Pa ment Summa Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $531.44 $531.44 $0.00 $531.44 $531.44 $531.44 $0.00 $531.44 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 7/16/2008 Permit Center Scrry of 11703E Sprague Ave, Suite B 3 PERMIT NUMBER: pokane Spokane Valley,WA 99206 PERMIT FEE: (509)688-0036 FAX: (509)688-0037 Valley. www.spokanevalley.org Community Development Residential Construction n New Construction KAccessory Bldg Permit Application n Addition/Remodel Deck n Other: SITE ADDRESS: / O 6/ 7 6 41-1-1-) \Spo V&/( ,, t/ - 7o/ (,,, ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: Contractor: Name: C/ ik S Name: VI { 7Cc�c C S P-� C---:--LF Address: / c./ -7 c i{ 4._ Address: City: 4,iakee veatey State: urs Zip: 9�a,4 City: State: Zip: Phone:jog-7®/ _ Z-L Z/ _J Fax: ti 2_2_ 5eit Phone: Fax: Contractor Lic No: Exp Date: Contact Person City Business Lic.No: Name: It,/'l Phone: .---O`i 7U/ - 2:2-27 Describe the scope of work in detail: Cost of Project: $ f Z© ) �C�Q , /2.0.6 Pole &L7/d izj Proposed Use: (`j yd / 9 jra **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS: #OF STORIES: TOTAL HABITABLE SPACE: 22-25 ' 301X4 $'x/V MAIN FLOOR TO SQ. 2"" FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: AREA: FINISHED BASEMENT GARAGE SQ. FTG: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON SQ. FTG: (4'-ft2 ' OK PROPERTY: #OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC? The permitee verifies,acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the '� dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done /J( in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws,codes or ordinances.6) Plans or addit n information may be required to be submitted, and subsequently approved before this application can b- trecessed. SIGNATURE:,_,44. ` , DATE: 7' /17/6 Mier Method of Payment: ❑ Cash ❑ Check ❑ Mastercard ❑ VISA Bankcard#: Expires: VIN#: Authorized Signature: REVISED 2/15/07 S (ht0111111°N1111146alle11703 E Sprague Ave Suite B-3♦ Spokane Valley WA 99206 ♦509.688.0036 ♦ Fax: 509.688.0037 • 40,'Valley y © Completed Building and Mechanical Application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature and date. OX Three (3) sets of plans including Site Plan, elevations, floor plans, foundation plans with details, roof plan, framing plans and details. © Show the height of any proposed buildings or accessory structures. ❑X Floor plan for each floor: Dimension to scale(minimum 1/8") and label each room (including sq footage of house and garage on plans) show each level of existing house and square footage of any additions. ❑X Egress windows: Provide at least one window or exterior door approved for emergency escape or rescue from basement and in every room for sleeping. © Floor framing details: Joist type, size, spacing and installation details. ❑X Roof framing plan and details © Furnace and hot water heater location ❑X All header locations: type, size and connections MX Foundation plan ❑X Insulation information © Decks and Stairway details All braced wall panel types: show locations and details of installation, including engineered design Smoke detector locations 22" x 30" attic access location 18" x 24" crawl space access One-hour separation detail: between house and garage •Project New project Previous pre-app meeting ❑ San(.-.. p .°Kane Transmittal Plan revisions 0 City of Spokane Valley Transmittal Date: .....01,7alley Commuiuttr Development Thursday,July 10,2008 Department 11703 E.Sprague Ave,Suite B3 Spokane Valley,WA 99206 Phone:509.688.0036 Site Address: 18817 E 4TH AVE Project Number: 08002675 Parcel Number: 55202.0182G Zoning: R-3 Water District: CONSOLIDATED ID #19 Fire District: FD 01 Applicant: STRAUSER, CYNTHIA G Owner: STRAUSER, CYNTHIA G 18817 E 4TH AVE 18817 E 4TH AVE SPOKANE VALLEY, WA 99016 SPOKANE VALLEY, WA 99016 (509) 701-2224 e-mail: e-mail: Contact: STRAUSER, CYNTHIA G Occupant: 18817 E 4TH AVE SPOKANE VALLEY, WA 99016 e-mail: (509) 701-2224 e-mail: "-- D) 1E, r1i. f ,N, 1 } Contractor: OWNER Arch/Engineer: --1 O - o -,, JUL 1 4 jy. e-mail: 11:1 (i H �; i Project 30 X 48 POLE BLDG Description: Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATION SITE PLANT � , � VA PLANS Please send all plan review and project comments via e-mail to the highlighted individuals. T _ rV_ , L a"sati dbfrli 02. TF h1A • 1 illia , . , i t'-' 4,, , Q cn /'v). ..WaYt 1 61.1 • i. i I .1t s IN , :' . - v 1^t' Pm% jj =E,IIEIII ch."1",:>A , 1 immit.7,1._.I 1 )z-,r 7-Yriliki - b .i. ic) . * < ) toons9 3 t_. 1 ,b I ' 1 C—Ta En a i I G 1 i ()01-kiit 4--AG),211; I 1 ' 8 Me ' 41e a A, h I V 1 . I 1 _ V .,tea '. -F IP r ,, i 111.1111.1M1111111111111111 g t ..ti pia Mall IMBI 1., .., rg% I (c, * II , ' .II "1 .a ` I imuyiu7r fi-e x01 ,.s . H 1 1 _ '9 � �g (N , . , , , ., . , .. , . . - -3 Lt, 1 vl 1 _ __J_I i , ,\ , 1 ,t)c x ,vs.ir N� 7 'uui tkk '-•5 - • -4p: _ - , . ' 19 - \ ' 0 - cam. I 4 1 - l I 1 'G - ''alI ' le I/ 414111A0lei* • -.. . . - . S' °°° N .. .. .T...7______G. _________\,._ . . . __. .. . 0 : . .0...,-' \k''.-. . A. C� ,t h .. 1 [Its', E . ,-L., ` E & 4) 6.____Nimint. .__. . - 3 • 6arefe Iv ` _- ,` 4 c ,Y�gin- _ : '"' -- .Gly ti'. _._ft ceir . t�'ctl_ ik ` i , X 3 sigie shed. r„ i Y _2-�.. __. __.._ mr-__. - _ _..__[___.. �' F_ ._...._ _ci r _C-1.0. _ ,:b..., 1 a < 24 CI I [II . ... „., ,G.„... , . _. , . .. /. . ., . , C roti n (,d t, .4/} _PLANNING DE __.e.A PROVED _ o --.Too! .,.l' - g --. (:/ ,,0,,,,, .. i! . ,_ DATE: { d._ ._ r , '-",,*'. 1 1101414,,litlefot.jr, A„vvs''''''' '''P'*P`Y5408Neel"f"*"41*R1-4 " , , 4 44144 4,*,,MaNNIIMAIMAKMPIWIFV,W445"910t TWaggr.linWitil For City Use Only S CITY OF g== ., PLUS Project Number pokaneProject Address 00°. a Q ° 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review > Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. > Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone,fax,email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE—APPLICANT PINK—BUILDING FILE REV 9/07