Loading...
2012, 08-30 Permit: SW-12002115 Sewer SPOKANE COUNTY BUILDIN3 AND PLANNING PERMIT Permit Issued Date: Application Number:SW-12002115 08/30/2012 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: ACME EXCVT&SEWER BORING CO Project Name: MICA VIEW Applicant: ACME EXCVT&SEWER BORING CO Address: 6808 S.LINKE RD. Permit Type: SEWER GREENACRES,WA 99016 Phone: (509)228-0691 Email: SITE INFORMATION: Site Address: 19004 E 4TH AVE Owner: OTTO,FRED L&EDITH F Parcel Number: 55202.0277 Address: 19004 E 4TH AVE GREENACRES,WA 99016 Subdivision: CORBIN ADDITION Phone: Assessor's Description: CORBIN ADDITION TO GREENACRES LT 4 EXC Email: ELY 68.5OFT&EXC S375FT BLK 22 (SENIOR EXEMPTION OF 1-ACRES/.58-ACRES NOT EXEMPTED) Inspection Area: Water District: Fire District:Spokane Valley Fire Consolidated Irrigation District#19 Zoning: Land Area:68740 Square Feet CONTRACTOR INFORMATION: General Contractor ACMEEES963LD ACME EXCVT&SEWER BORING CO 6808 S.LINKE RD. GREENACRES,WA 99016 (509)228-0691 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $25.94 Utilities Permit $125.00 Total Fee: $150.94 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area Printed by:its APPPOOL\ASP.NET v4.0 Date Printed:08/30/2012 15:30:02 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number:SW-12002115 08/30/2012 Expiration Date: INSTALLERCALL 1-800-424-5555 BEFORE YOU DIG--AT SWORKINGT 2 SPOKANEO E COMPLY WITH ALL REQUIREMENTS THE E WA STATEDEPT OF LABOR&I INDUSTRIES, INCLUDINGD REQUIRES THOSE THE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES TO ONE WORKING DAY NOTICE REQUIRED.PERMIT A DEPT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECCTION FEES COVER. APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION.INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER RCW 19.122SITE BOTH STATE AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF LAW UNDERGROUND FACILITIES. Printed by:IIS APPPOOLUASP.NET v4.0 Date Printed:08/30/2012 15:30:02