2012, 08-30 Permit: SW-12002115 Sewer SPOKANE COUNTY BUILDIN3 AND PLANNING
PERMIT
Permit Issued Date:
Application Number:SW-12002115 08/30/2012
Expiration Date:
Project Description: SEWER CONNECTION Primary Contact: ACME EXCVT&SEWER BORING CO
Project Name: MICA VIEW Applicant: ACME EXCVT&SEWER BORING CO
Address: 6808 S.LINKE RD.
Permit Type: SEWER GREENACRES,WA 99016
Phone: (509)228-0691
Email:
SITE INFORMATION:
Site Address: 19004 E 4TH AVE
Owner: OTTO,FRED L&EDITH F
Parcel Number: 55202.0277 Address: 19004 E 4TH AVE
GREENACRES,WA 99016
Subdivision: CORBIN ADDITION Phone:
Assessor's Description: CORBIN ADDITION TO GREENACRES LT 4 EXC Email:
ELY 68.5OFT&EXC S375FT BLK 22 (SENIOR
EXEMPTION OF 1-ACRES/.58-ACRES NOT
EXEMPTED)
Inspection Area:
Water District: Fire District:Spokane Valley Fire
Consolidated Irrigation
District#19
Zoning: Land Area:68740 Square Feet
CONTRACTOR INFORMATION:
General Contractor
ACMEEES963LD
ACME EXCVT&SEWER BORING CO
6808 S.LINKE RD.
GREENACRES,WA 99016
(509)228-0691
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing-Utilities $25.94
Utilities Permit $125.00
Total Fee: $150.94
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
Printed by:its APPPOOL\ASP.NET v4.0
Date Printed:08/30/2012 15:30:02
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number:SW-12002115 08/30/2012
Expiration Date:
INSTALLERCALL 1-800-424-5555 BEFORE YOU DIG--AT
SWORKINGT 2 SPOKANEO
E
COMPLY WITH ALL REQUIREMENTS THE E WA STATEDEPT OF LABOR&I INDUSTRIES, INCLUDINGD REQUIRES THOSE THE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES TO
ONE WORKING DAY NOTICE REQUIRED.PERMIT A DEPT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECCTION FEES COVER.
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION.INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER
RCW 19.122SITE BOTH STATE
AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
LAW
UNDERGROUND FACILITIES.
Printed by:IIS APPPOOLUASP.NET v4.0